GAMBAR GEDUNG CATHLAB Fixs-1

The document outlines the construction plans for a Cath Lab building at the Subang Regional General Hospital, detailing various architectural and structural drawings. It includes a list of drawings with codes, scales, and descriptions, covering site development, architectural layouts, structural designs, and mechanical and electrical installations. The document is intended for use by the project stakeholders, including the budget user and planning consultant.

Uploaded by

Putra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
66 views43 pages

GAMBAR GEDUNG CATHLAB Fixs-1

The document outlines the construction plans for a Cath Lab building at the Subang Regional General Hospital, detailing various architectural and structural drawings. It includes a list of drawings with codes, scales, and descriptions, covering site development, architectural layouts, structural designs, and mechanical and electrical installations. The document is intended for use by the project stakeholders, including the budget user and planning consultant.

Uploaded by

Putra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 43

PEMERINTAH KABUPATEN SUBANG

DINAS KESEHATAN
RUMAH SAKIT UMUM DAERAH SUBANG
Jl. Brigjen Katamso No.37 Subang

PEKERJAAN
BELANJA MODAL PEMBANGUNAN GEDUNG CATHLAB

MENGETAHUI MENGETAHUI KONSULTAN PERENCANA

KUASA PENGGUNA PEJABAT PEMBUAT KOMITMEN PT. ALOCITA MANDIRI


ANGGARAN (PPK)

dr.H. ACHMAD NASUHI ACENG ARIF RISWANDI, S.Ag., ST. RIAN AKHMADI
NIP. 19690726 200212 1 005 NIP. 19760119 200801 1 002 Direktur Utama
DAFTAR ISI
GEDUNG CATHLAB
RSUD SUBANG
NO JUDUL GAMBAR KODE SKALA KETERANGAN

SITE DEPELOVMENT
1. SITE EXISTING S-SP-1010 1:200
2. SITE RENCANA GEDUNG CATHLAB S-SP-1020 1:200

ARSITEKTUR
3. DENAH RENCANA GEDUNG CATHLAB A-DN-1010 1:150
4. LAYOUT ATAP A-DN-1020 1:150
5. TAMPAK DEPAN A-TM-1010 1:150
TAMPAK BELAKANG A-TM-1020 1:150
6. TAMPAK SAMPING KANAN A-TM-1030 1:150
TAMPAK SAMPING KIRI A-TM-1040 1:150
7. POTONGAN I A-PO-1010 1:150
POTONGAN II A-PO-1020 1:150
8. POTONGAN III A-PO-1030 1:150
POTONGAN IV A-PO-1040 1:150
9. DENAH RENCANA KUSEN A-KS-1010 1:150
10. DETAIL KUSEN A-DET-1010 1:25
11. DETAIL KUSEN A-DET-1011 1:25
12. DETAIL KUSEN A-DET-1012 1:25
13. DETAIL KUSEN
14. DENAH RENCANA POLA LANTAI A-LT-1010 1:150
15. DENAH RENCANA PLAFOND A-PL-1010 1:150
16. DETAIL PRINSIP TOILET A-TO-1010 1:25

STRUKTUR
1. DENAH RENCANA PONDASI A-DN-1010 1:150
2. DENAH RENCANA SLOOF A-DN-1020 1:150
3. DENAH FLOORSLAB A-DN-1030 1:150
4. DENAH RENCANA KOLOM A-DN-1040 1:150
5. DENAH RENCANA BALOK ELV.+4.020 A-DN-1050 1:150
6. DENAH RENCANA PLAT DAK ELV.+4.020 A-DN-1060 1:150
7. DENAH RENCANA BALOK ELV.+4.700 A-DN-1070 1:150
8. DENAH RENCANA PLAT DAK ELV.+4.700 A-DN-1080 1:150
9. DETAIL PONDASI A-DET-1010 1:25
10. DETAIL PLAT DAK DAN TABEL DIMENSI A-DET-1020 1:25
RENCANA JALAN
DI MASTERPLAN

GAS

GD. MANAGEMENT
AREA PONDASI
+0.60
SELOKAN

SELOKAN

GD. ICU
+0.30

±0.000
JALAN ASPAL

KORIDOR
EXISTING

SITE LOKASI
RENCANA JALAN
DI MASTERPLAN

GAS

GD. MANAGEMENT
±0.00

GD. ICU
±0.000

KORIDOR
EXISTING

SITE RENCANA
GD. ICU
±0.000
KORIDOR
EXISTING

DENAH RENCANA GEDUNG CATHLAB


KORIDOR
EXISTING

DENAH ATAP
TAMPAK DEPAN

TAMPAK BELAKANG
TAMPAK SAMPING KANAN

TAMPAK SAMPING KIRI


POTONGAN I

POTONGAN II
POTONGAN III

POTONGAN IV
KORIDOR
EXISTING

DENAH KUSEN
TYPE KUSEN PJ1 P1

GAMBAR

JUMLAH 1 UNIT 2 UNIT


TYPE KUSEN P2 P3

GAMBAR

JUMLAH 1 UNIT 9 UNIT


TYPE KUSEN P3' P5 P6

GAMBAR

JUMLAH 1 UNIT 1 UNIT 3 UNIT


TYPE KUSEN J1

GAMBAR

JUMLAH 2 UNIT
TYPE KUSEN BV1 BV2

GAMBAR

JUMLAH 6 UNIT 2 UNIT


KORIDOR
EXISTING

DENAH POLA LANTAI


KORIDOR
EXISTING

DENAH PLAFOND
DENAH TOILET

POTONGAN TOILET
KORIDOR
EXISTING

DENAH PONDASI
KORIDOR
EXISTING

DENAH SLOOF ELV.+0.600


KORIDOR
EXISTING

DENAH FLOORSLAB ELV.-0.600


KORIDOR
EXISTING

DENAH KOLOM
KORIDOR
EXISTING

DENAH BALOK ELV.+4.020


KORIDOR
EXISTING

DENAH PLAT DAK ELV.+4.020


KORIDOR
EXISTING

DENAH BALOK ELV.+4.700


KORIDOR
EXISTING

DENAH PLAT DAK ELV.+4.700


DET. PBK TYPE 1

DET. PBK TYPE 2

DETAIL P1

DETAIL PONDASI MEJA CATHLAB


DET. PLAT DAK CATHLAB

DET. PLAT DAK


DAFTAR ISI
GEDUNG CATHLAB
RSUD SUBANG

NO JUDUL GAMBAR KODE SKALA KETERANGAN


MEKANIKAL DAN ELEKTRIKAL
1. DENAH INSTALASI PENERANGAN ME - 01 1:150
2. DENAH INSTALASI KOTAK KONTAK , DATA DAN TELEPON ME - 02 1:150
3. WIRING DIAGRAM PANEL ME - 03 NTS
4. DENAH INSTALASI DATA , TELEPON, CCTV DAN ACCES POINT WIRELES ME - 04 1:150
5. DENAH INSTALASI TATA UDARA ME - 05 1:150
6. DENAH INSTALASI GAS MEDIS ME - 06 1:150
7. DENAH INSTALASI AIR BERSIH ME - 07 1:150
8. DENAH INSTALASI AIR KOTOR ME - 08 1:150
9. DETAIL ARMATUR 1 ME - 09 NTS
10. DETAIL KABEL TRAY ME - 10 NTS
11. DETAIL PRINSIP PLUMBING 1 ME - 11 NTS
12. DETAIL PRINSIP PLUMBING 2 ME - 12 NTS
13. DETAIL FLOOR DRAIN ME - 13 NTS
GD. ICU
±0.000
KORIDOR
EXISTING

DENAH INSTALASI PENERANGAN


GD. ICU
±0.000
KORIDOR
EXISTING

DENAH INSTALASI KOTAK KONTAK


GD. ICU
±0.000
KORIDOR
EXISTING

DENAH INSTALASI DATA,TELEPON,CCTV DAN APW


GD. ICU
±0.000
KORIDOR
EXISTING

DENAH INSTALASI TATA UDARA


GD. ICU
±0.000
KORIDOR
EXISTING

DENAH INSTALASI GAS MEDIS


GD. ICU
±0.000
KORIDOR
EXISTING

DENAH INSTALASI AIR BERSIH


GD. ICU
±0.000
KORIDOR
EXISTING

DENAH INSTALASI AIR KOTOR


EXIT

H
ITC
B/SW
HU

2
1 3

HUB/SWITCH
r
ove
yC
Tra

2500/3000
2500/3000 2500/3000

H
H H

W
W W
COVER LIGHT DUTY HEAVY DUTY
(H.D.) (H.D.)

2500/3000

35
10

20
40
W W

W
C

H
H

20x10mm
33

(L.D.) (H.D.)

20
H

10
41

20x10mm
33

20
H1

10
32
41

COVER FOR PERFORATED CABLE TRAY STANDARDS :-


W
MATERIAL :- MILD STEEL SHEET AS PER IS 1079
16 41 66 41 16 16 41 66 41 16 TRAY W H T (SAIL,ESSAR,BHUSHAN/UTTAM,ISPAT)
H2

COVER - K
L.D. 50 TO 750 25 TO 50 1.6 TO 3.0
FINISH :- HOT DIP GALVANISED AS PER IS : 2629
25-50
5
50/100

T
65 MICRON AVERAGE OR 460 GSM
32

10

20
FOR NORMAL APPLICATIONS.
86 MICRON AVERAGE OF 610 GSM FOR
H2 40

TRAY W H T C CORROSIVE ENVIRONMENT.


COVER - L
6 Coupler Plate for 50-100mm Coupler Plate for 25-50mm W H.D. 50 TO 800 50 TO 100 1.6 TO 3.0 15
Height Cable Tray Height Cable Tray T
ALTERNATIVE:- POWER COATED (4 COLORS CHOICE)
BLUE, ORANGE, DA-GREY,
SEIMENS-GREY
W TRAY W H2 T
LENGTH :- 2500mm & 3000mm LONG
T

COVER - M L.D. W+5 10 TO 25 1.6 TO 3.0


BT