RISK ASSESSMENT
PROJECT: SITE: Ref No: Sl No :
JOB UNDER RISK ASSESSMENT: PAINTING WORKS AT SITE DATE OF ASSESSMENT:
NAME & POSITION OF THE
ASSESSOR:
INITIAL RISK FINAL RISK REMARK
RATING RATING S
EXISTING
CONTROL MEASURES &
PERSO WHEHER THE RISK IS
IDENTIFIED HAZARD
LIKELI HOOD
LIKELI HOOD
N(S) AT ACCEPTABLE
RISK RATE
RISK RATE
CONTROL MEASURES ADDED
SEVERITY
SEVERITY
NUMBER
NUMBER
HAZARD EFFECT RISK
(Painting Body contact 1 1 5 10 50 Strict supervisory control ensured 1 5 1 5 Risk is
work) while handling Take special care while MSDS to be referred\ accepta
Mixing the mixing of paints; Store all chemical in the temporary ble
paints , Toxic Skin Disease, avoid contact with skin; chemical storage area provided
gases, irritation, wear PVC or rubber hand No naked flames should be used near
Asbestos Dermatitis, gloves and coverall the painting area
Eye irritation. Use safety goggles to avoid No hot work shall be performed near to
Asbestos, the paint contact with eyes. the painting activity
silica ,fumes, Also Paints must be handled Ensure nearby working workers also
cement, mists properly to avoid any splash. wearing the Nose mask
and Dust of Vapor Ensure local Exhaust TBT shall be conducted prior to start the
Materials, inhalation Ventilation/General ventilation work and discuss RA/ Method statement
Spillage of prior to start of the painting points with involved personnel
Paints Asphyxiation, job. Fire Extinguisher shall be located near
Continuous Intoxication, While painting always wear to the painting area
work in hot acute and proper respirators (referred by Wash properly before consuming any
environment chronic chest manufacturer’s instructions). food.
Poor work pain, Refer MSDS (Material Safety Clean / dispose safely the paint soaked
posture Dizziness, Data Sheet). coverall / gloves.
Nausea, Display warning signs and
Slips, Fire, make others away from Ensure proper wind up & housekeeping
Environmenta inhaling the vapors. at worksite.
l hazards, Ensure proper segregation of
Dehydration/ Empty and full drums of
heat stress paints
leading to Mixing must be carried out on
fainting. concrete floor or use of
polythene sheet.
RISK ASSESSMENT
Clear spillage if any
immediately.
Follow safe clean up and
disposal procedures.
Give sufficient rest in between
the painting job.
Change persons as and when
required.
Ensure Provision of proper
platform.
Do not eat or smoke wearing
a paint soaked disposal
coverall / gloves
Do not leave unattended the
Paint containers in site.
Proper PPE should be provided to each and every worker (Safety shoes, helmet, safety glasses and hand
gloves) and face shield, full body harness to all the workers while working at height.
Proper Barrication/guarding is to be provided around work area.
Proper illumination, ventilation and housekeeping is to be maintained at all time.
First aid procedures are to be explained.
Fire extinguisher and Emergency evacuation map to be displayed.
Emergency contact no’s to be displayed.
All the materials and tools to be stored in a proper place without affecting the access and egress.