0% found this document useful (0 votes)
37 views7 pages

Aconex 6103

The document outlines a series of transmittals related to the NEOM Green Hydrogen Element project, detailing various submissions and reviews of structural drawings and documents by Air Products EPC and Nesma United Industries. Key individuals involved include Joel Culla, Saroj Baidya, and Hendrix Eusebio, with specific codes and revision numbers assigned to each document. The communication emphasizes the need for revisions based on comments provided in the reviewed documents.

Uploaded by

Partha Sundar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views7 pages

Aconex 6103

The document outlines a series of transmittals related to the NEOM Green Hydrogen Element project, detailing various submissions and reviews of structural drawings and documents by Air Products EPC and Nesma United Industries. Key individuals involved include Joel Culla, Saroj Baidya, and Hendrix Eusebio, with specific codes and revision numbers assigned to each document. The communication emphasizes the need for revisions based on comments provided in the reviewed documents.

Uploaded by

Partha Sundar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

9/5/23, 3:00 PM Aconex

Wilfredo Villaflor ISSUED FOR REVIEW (IFR) : NUI-60% (100-B101) OP… 21/03/2023
NESMA UNITED INDUSTRIES TRANSMITTAL NUI-TRANSMIT-000132

Saroj Baidya AP REVIEWED DOCUMENTS (CODE 1): NUI-60% (1… 28/03/2023


AIR PRODUCTS EPC TRANSMITTAL APEPC-TRANSMIT-001340

Hendrix Eusebio ISSUED FOR REVIEW (IFR) 100% DRAWINGS SUB… 05/07/2023
NESMA UNITED INDUSTRIES TRANSMITTAL NUI-TRANSMIT-000648

Joel Culla AP REVIEWED DOCUMENT (CODE 2): DRAWINGS S… 25/07/2023


AIR PRODUCTS EPC TRANSMITTAL APEPC-TRANSMIT-004322

Hendrix Eusebio ISSUED FOR REVIEW (IFR) STRUCTURAL IFC DRA… 21/08/2023
NESMA UNITED INDUSTRIES TRANSMITTAL NUI-TRANSMIT-000925

Joel Culla AP REVIEWED DOCUMENT (CODE 2): STRUCTURAL… 2:13 PM


AIR PRODUCTS EPC TRANSMITTAL APEPC-TRANSMIT-006098

Joel Culla AP REVIEWED DOCUMENT (CODE 4): STRUCTURAL… 2:25 PM


AIR PRODUCTS EPC TRANSMITTAL APEPC-TRANSMIT-006103

Joel Culla AP REVIEWED DOCUMENT (CODE 2): DRAWINGS S… 25/07/2023


AIR PRODUCTS EPC TRANSMITTAL APEPC-TRANSMIT-004325

Saroj Baidya AP REVIEWED DOCUMENTS (CODE 2): NUI-60% (1… 04/04/2023


AIR PRODUCTS EPC TRANSMITTAL APEPC-TRANSMIT-001463

Hendrix Eusebio ISSUED FOR REVIEW (IFR) - 100% DRAWINGS SUB… 06/06/2023
NESMA UNITED INDUSTRIES TRANSMITTAL NUI-TRANSMIT-000532

Joel Culla AP REVIEWED DOCUMENT (CODE 2): 100% DRAWI… 23/06/2023


AIR PRODUCTS EPC TRANSMITTAL APEPC-TRANSMIT-003414

Saroj Baidya AP REVIEWED DOCUMENTS (CODE 2): (100-B101) … 24/06/2023


AIR PRODUCTS EPC TRANSMITTAL APEPC-TRANSMIT-003436

Saroj Baidya AP REVIEWED DOCUMENTS (CODE 2): 100-B101 O… 24/06/2023


AIR PRODUCTS EPC TRANSMITTAL APEPC-TRANSMIT-003441

Saroj Baidya AP REVIEWED DOCUMENT (CODE 4): SCHEDULE … 25/06/2023


AIR PRODUCTS EPC TRANSMITTAL APEPC-TRANSMIT-003477

Hendrix Eusebio ISSUED FOR REVIEW (IFR) 100% DRAWINGS SUB… 17/07/2023
NESMA UNITED INDUSTRIES TRANSMITTAL NUI-TRANSMIT-000711

Joel Culla AP REVIEWED DOCUMENT (CODE 2): DRAWINGS S… 01/08/2023


AIR PRODUCTS EPC TRANSMITTAL APEPC-TRANSMIT-004597

Hendrix Eusebio ISSUED FOR REVIEW (IFR) - 100% DRAWINGS SUB… 06/06/2023
NESMA UNITED INDUSTRIES TRANSMITTAL DRAFT-000736

Saroj Baidya AP REVIEWED DOCUMENTS (CODE 2): (100-B101) … 05/04/2023


AIR PRODUCTS EPC TRANSMITTAL APEPC-TRANSMIT-001473

https://ksa1.aconex.com/hub/index.html?mainTarget=%2FViewCorrespondence%3FCorrespondence_ID%3D1364027734%26CORRESPONDENCE_… 1/7
9/5/23, 3:00 PM Aconex

Hendrix Eusebio ISSUED FOR REVIEW (IFR) REV.01 100% DRAWING… 11/07/2023
NESMA UNITED INDUSTRIES TRANSMITTAL NUI-TRANSMIT-000675

Joel Culla AP REVIEWED DOCUMENT (CODE 2): 100% DRAWI… 24/07/2023


AIR PRODUCTS EPC TRANSMITTAL APEPC-TRANSMIT-004306

Joel Culla AP REVIEWED DOCUMENT (CODE 2): 100% DRAWI… 26/08/2023


AIR PRODUCTS EPC TRANSMITTAL APEPC-TRANSMIT-005681

Saroj Baidya AP REVIEWED DOCUMENTS (CODE 1): NUI-60% (1… 05/04/2023


AIR PRODUCTS EPC TRANSMITTAL APEPC-TRANSMIT-001478

MAIL TYPE MAIL NUMBER REFERENCE NUMBER


Transmittal APEPC-TRANSMIT-006103 NUI-TRANSMIT-000132

AP REVIEWED DOCUMENT (CODE 4): STRUCTURAL IFC DRAWINGS


SUBMISSION (100-B101) OPERATOR BUILDING (ASU)

From Mr Joel Culla - Air Products EPC

To (5) Mr Hendrix Eusebio - Nesma United Industries (+4 more...)

Cc (8) Mr Zaidoon Shatnawi - Air Products EPC (+7 more...)

Sent Tuesday, 5 September 2023 2:25:41 PM AST (GMT +03:00)

Reason Issued for Information

Status N/A

DETAILS

Element PM210011: NGHP-GHE

Unit 900 - Common Buildings

Area 90 - Common Buildings

Discipline Code STR - Structural

DOCUMENT ATTACHMENTS (10)

(0 selected)

https://ksa1.aconex.com/hub/index.html?mainTarget=%2FViewCorrespondence%3FCorrespondence_ID%3D1364027734%26CORRESPONDENCE_… 2/7
9/5/23, 3:00 PM Aconex

Revision
File Document No Revision Title Status
Date

PM210011-NUI900- RAFT FOUNDATION SECTION, COLUMN & WALL Code


02 21/08/2023
RD2-00019 DETAILS (100-B101) OPERATOR BUILDING (ASU) 4

PM210011-NUI900- RAFT FOUNDATION SECTION, COLUMN & WALL Code


02 21/08/2023
RD2-00019-NATIVE DETAILS (100-B101) OPERATOR BUILDING (ASU) 4

PM210011-NUI900- ROOF FRAMING/ROOF BEAM SCH, SEC & DETAILS Code


02 21/08/2023
RD2-00021 (100-B101) OPERATOR BUILDING (ASU) 4

PM210011-NUI900- ROOF FRAMING/ROOF BEAM SCH, SEC & DETAILS Code


02 21/08/2023
RD2-00021-NATIVE (100-B101) OPERATOR BUILDING (ASU) 4

PM210011-NUI900- RAFT FOUNDATION LAYOUT (100-B101) Code


02 21/08/2023
RF2-00003 OPERATOR BUILDING (ASU) 4

PM210011-NUI900- RAFT FOUNDATION LAYOUT (100-B101) Code


02 21/08/2023
RF2-00003-NATIVE OPERATOR BUILDING (ASU) 4

PM210011-NUI900- ROOF FRAMING PLAN (100-B101) OPERATOR Code


02 21/08/2023
RL5-00009 BUILDING (ASU) 4

PM210011-NUI900- ROOF FRAMING PLAN (100-B101) OPERATOR Code


02 21/08/2023
RL5-00009-NATIVE BUILDING (ASU) 4

PM210011-NUI900- COLUMN AND AXIS PLAN (100-B101) OPERATORS Code


02 21/08/2023
RL5-00010 BUILDING (FOR ASU) 4

PM210011-NUI900- COLUMN AND AXIS PLAN (100-B101) OPERATORS Code


02 21/08/2023
RL5-00010-NATIVE BUILDING (FOR ASU) 4

MESSAGE

Dear NUI Team,

Please refer to the attached AP Reviewed document for your information and reference.

Please feel free to let us know should you need any additional guidance or clarifications so we can help/support you further.

Regards,
Joel Culla
Document Controller
NEOM Green Hydrogen Element (NGHE) Project
E-Mail: cullaj@airproducts.com
Mobile No.: (+966) 552693761

https://ksa1.aconex.com/hub/index.html?mainTarget=%2FViewCorrespondence%3FCorrespondence_ID%3D1364027734%26CORRESPONDENCE_… 3/7
9/5/23, 3:00 PM Aconex

This communication is intended solely for the person addressed and is confidential, and may be privileged. If you receive
this communication incorrectly, please return it immediately to the sender and destroy all copies in your files. If you have
any questions, please contact the sender of this message.

From: H Eusebio
Sent: 21/08/2023 9:50:13 AM AST (GMT +03:00)
To: Ali Hassan Alabdrabalnabi, Saroj Baidya, Joel Culla, Eric Payumo
Cc: Ali Almahfoudh, Aamir Wahab, Sami AlSheikh, Bency Nair, Wilfredo Villaflor
Mail Number: NUI-TRANSMIT-000925
Subject: ISSUED FOR REVIEW (IFR) STRUCTURAL IFC DRAWINGS SUBMISSION (100-B101) OPERATOR BUILDING (ASU)

Element: PM210011: NGHP-GHE


Unit: 900 - Common Buildings
Area: 90 - Common Buildings
Discipline Code: STR - Structural

Dear Gentlemen,

Please find attached "Structural IFC Drawings submission (100-B101) Operator Building - ASU" for your review.

Thank you and Best Regards,

Hendrix Mendoza Eusebio


Nesma United Industries
A.P.O Box: 3402, Khobar 31952 Kingdom of Saudi Arabia
www.nesmaunitedindustries.com

From: J Culla
Sent: 25/07/2023 8:33:01 AM AST (GMT +03:00)
To: Wael Alamari, Sami AlSheikh, Hendrix Eusebio, Bency Nair, Wilfredo Villaflor
Cc: Ali Hassan Alabdrabalnabi, Ali Almahfoudh, Saroj Baidya, Domingo Paulo, Eric Payumo, Zaidoon Shatnawi, Aamir Wahab
Mail Number: APEPC-TRANSMIT-004322
Subject: AP REVIEWED DOCUMENT (CODE 2): DRAWINGS SUBMISSION (100-B101) OPERATOR BUILDING (ASU)

Element: PM210011: NGHP-GHE


Unit: 900 - Common Buildings
Area: 90 - Common Buildings
Discipline Code: STR - Structural

Dear NUI Team,

Please refer to the attached AP Reviewed document(s) for your info, reference and appropriate action.

Notes:

Code 2 Documents:

https://ksa1.aconex.com/hub/index.html?mainTarget=%2FViewCorrespondence%3FCorrespondence_ID%3D1364027734%26CORRESPONDENCE_… 4/7
9/5/23, 3:00 PM Aconex

Should be re-submitted in its/their next revision (Rev. 02) incorporating AP’s comments.
Comments Resolution Sheet (CRS) should be provided on the next submission.

Regards,
Joel Culla
Document Controller
NEOM Green Hydrogen Element (NGHE) Project
E-Mail: cullaj@airproducts.com
Mobile No.: (+966) 552693761

This communication is intended solely for the person addressed and is confidential, and may be privileged. If you receive
this communication incorrectly, please return it immediately to the sender and destroy all copies in your files. If you have
any questions, please contact the sender of this message.

From: H Eusebio
Sent: 05/07/2023 4:34:50 PM AST (GMT +03:00)
To: Saroj Baidya, Joel Culla, Domingo Paulo, Eric Payumo
Cc: Ali Almahfoudh, Aamir Wahab, Sami AlSheikh, Bency Nair, Wilfredo Villaflor
Mail Number: NUI-TRANSMIT-000648
Subject: ISSUED FOR REVIEW (IFR) 100% DRAWINGS SUBMISSION (100-B101) OPERATOR BUILDING (ASU)

Element: PM210011: NGHP-GHE


Unit: 900 - Common Buildings
Area: 90 - Common Buildings
Discipline Code: STR - Structural

Dear Gentlemen,

Please find attached (Rev.01) 100% Drawings Submittal (100-B101) Operators Building ASU - for your review.

Thank you and Best Regards,

Hendrix Mendoza Eusebio


Nesma United Industries
A.P.O. Box: 3402, Khobar 31952 Kingdom of Saudi Arabia
www.nesmaunitedindustries.com

From: S Baidya
Sent: 28/03/2023 4:33:41 PM AST (GMT +03:00)
To: Elias Aad, Sami AlSheikh, Mohammed Aslam, Hendrix Eusebio, Bency Nair, Wilfredo Villaflor
Cc: Ali Almahfoudh, Joel Culla, Georgina Mole, Domingo Paulo, Zaidoon Shatnawi, Aamir Wahab
Mail Number: APEPC-TRANSMIT-001340
Subject: AP REVIEWED DOCUMENTS (CODE 1): NUI-60% (100-B101) OPERATOR BUILDING FOR ASU DRAWINGS- (CABLE ROUTING DIAGRAM,
DETAIL DRAWINGS, LOCATION PLAN,SCHEDULE & FOUNDATION DRAWINGS)

Element: PM210011: NGHP-GHE


Unit: 900 - Common Buildings
Area: 90 - Common Buildings
Discipline Code: HVA - Heating, Ventilation & Air Conditioning (HVAC), STR - Structural, TEL - Telecommunications

https://ksa1.aconex.com/hub/index.html?mainTarget=%2FViewCorrespondence%3FCorrespondence_ID%3D1364027734%26CORRESPONDENCE_… 5/7
9/5/23, 3:00 PM Aconex

Dear NUI Team,

Please refer to the attached AP Reviewed document(s) for your info, reference and appropriate action.

Notes:

Code 1 Documents:

Should be re-submitted in its/their next revision (Rev. 01) incorporating AP’s comments.
Comments Resolution Sheet (CRS) should be provided on the next submission.

NOTE: Comments has been identified the pdf file same comment applicable to the native files
please do the necessary amendment.

Thanks and regards,

Saroj Baidya
Document Controller
Neom Green Hydrogen Element (NGHE) Project
Air Products Middle East Industrial Gases LLC
Email: baidyas1@airproducts.com
Contact # 966 550280781

From: W Villaflor
Sent: 21/03/2023 5:18:15 PM AST (GMT +03:00)
To: Saroj Baidya, Joel Culla, Georgina Mole, Domingo Paulo
Cc: Ali Almahfoudh, Aamir Wahab, Elias Aad, Sami AlSheikh, Hendrix Eusebio, Bency Nair
Mail Number: NUI-TRANSMIT-000132
Subject: ISSUED FOR REVIEW (IFR) : NUI-60% (100-B101) OPERATOR BUILDING FOR ASU DRAWINGS- (CABLE ROUTING DIAGRAM, DETAIL
DRAWINGS, LOCATION PLAN,SCHEDULE & FOUNDATION DRAWINGS)

Element: PM210011: NGHP-GHE


Unit: 900 - Common Buildings
Area: 90 - Common Buildings
Discipline Code: CIS - Civil, ELE - Electrical, HVA - Heating, Ventilation & Air Conditioning (HVAC), STR - Structural, TEL - Telecommunications

Dear Gentlemen,
Please find the attached 60% (100-B101)OPERATORS BUILDING (FOR ASU) DRAWINGS- (CABLE ROUTING DIAGRAM,
DETAIL
DRAWINGS, LOCATION PLAN, SCHEDULE & FOUNDATION DRAWINGS) for your review.

https://ksa1.aconex.com/hub/index.html?mainTarget=%2FViewCorrespondence%3FCorrespondence_ID%3D1364027734%26CORRESPONDENCE_… 6/7
9/5/23, 3:00 PM Aconex

Wilfredo Villaflor
QA/QC Document Controller
Nesma United Industries Co. Ltd
NGHE /QAQC/Construction and Contracting Division
A: P.O.Box : 3402, Khobar 31952 Kingdom of Saudi Arabia
M:+966 568713346
Email: wilfredov@nesma.com

https://ksa1.aconex.com/hub/index.html?mainTarget=%2FViewCorrespondence%3FCorrespondence_ID%3D1364027734%26CORRESPONDENCE_… 7/7

You might also like