This document transmits Revision 2 to Service Bulletin 60-32-1 for the installation of main landing gear lower torque arms with jacking provisions on Learjet 60 aircraft, now applicable to models 60-001 through 60-214. It includes updated labor hours, warranty information, and material costs, with no rework required for previously compliant aircraft. The bulletin provides detailed modification instructions and emphasizes the need for compliance with FAA regulations.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views5 pages

SB60 32 1

This document transmits Revision 2 to Service Bulletin 60-32-1 for the installation of main landing gear lower torque arms with jacking provisions on Learjet 60 aircraft, now applicable to models 60-001 through 60-214. It includes updated labor hours, warranty information, and material costs, with no rework required for previously compliant aircraft. The bulletin provides detailed modification instructions and emphasizes the need for compliance with FAA regulations.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

LEARJET 60

OPTIONAL
SBT 60-32-1

SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
This page transmits Revision 2 to Service Bulletin 60-32-1, “Installation of Main Landing Gear Lower Torque
Arms with Jacking Provision.”

Rework:

No rework is required for aircraft that have complied with previous issues of this Service Bulletin.

Reason:

Revised planning information as follows:


In paragraph 1.A., revised aircraft effectivity. Effectivity was 60-001 and Subsequent, now 60-001 thru
60-214.
In paragraph 1.F., revised labor hours.
In paragraph 1.G., added warranty statement.
In paragraph 1.H., updated kit pricing.

Revised material information as follows:


Updated Service Bulletin Instructions to reflect Revision 2.

Filing Instructions:

This is a COMPLETE revision. This bulletin has been reprinted in its entirety. Remove and discard all
pages of the prior issue and replace with pages of this revision.

LIST OF EFFECTIVE PAGES DATE

1 thru 4 Aug 30/01

Record of Revisions:

ISSUE DATE

Original Dec 13/93

Revision 1 Nov 10/95

SBT 60-32-1
Page 1 of 1
Aug 30/01
LEARJET 60
OPTIONAL
SB 60-32-1

SERVICE BULLETIN
To ensure proper compliance with this Service Bulletin, owners and operators of affected aircraft modified by
STC should contact the STC holder or their regional FAA office for additional information and disposition.

DISTRIBUTION REV. REVISION


CONTACT INFORMATION DOCUMENT DATE
DATE NO. DATE

Business Aircraft Dec 13, 1993 Oct 12, 2001 2 Aug 30, 2001
Learjet Inc.
MS 53
P.O. Box 7707
Wichita, Kansas
67277-7707
(316) 946-3135

LANDING GEAR - INSTALLATION OF MAIN LANDING GEAR LOWER TORQUE ARMS WITH
JACKING PROVISION

1. Planning Information

A. Effectivity
(1) Learjet 60-001 thru 60-214.

B. Reason
(1) To install main landing gear strut lower torque arms to accept main gear jacks. This will provide a
means to install jacks individually under landing gear strut.

C. Description
(1) Instructions are provided in this Service Bulletin to replace main landing gear strut lower torque
arms.

D. Compliance
(1) At the option of the aircraft owner.

E. Approval
(1) FAA approval has been obtained on technical data in this publication that affects airplane type
design.

SB 60-32-1
Page 1 of 4
Nov 10/01
Rev 2 Aug 30/01
LEARJET 60
SERVICE BULLETIN

F. Labor Hours - Estimated Accomplishment Time

LABOR
TASK
HOURS
3.0 Labor hours to gain access to affected area.

3.0 Labor hours to modify aircraft.

1.0 Labor hour to functional test/operational check.


3.0 Labor hours to restore aircraft to airworthy status.

10.0 Total Labor Hours

NOTE: The above labor hour estimate is for planning purposes only. Facility and/or personnel
capabilities may cause actual accomplishment time to vary significantly.

G. Warranty
(1) None

H. Material Cost and Availability

KIT PART NUMBER PRICING

2384034-2 $8,006.00K

NOTE: The above selling price is subject to change without notice.

You may place your order for (this kit or these kits) through your Learjet Authorized Ser-
vice Facility.

I. Tooling
(1) None

J. Weight and Balance


(1) Change in basic weight and moment

CHANGE IN BASIC WEIGHT CHANGE IN BASIC MOMENT

+ 2.18 inch-pounds + 867 inch-pounds

K. References
(1) Learjet Maintenance Manual, Chapters 7, 12, and 32.

L. Other Publications Affected


(1) Learjet Illustrated Parts Catalog, Chapter 32.

SB 60-32-1
Page 2 of 4
Nov 10/01
Rev 2 Aug 30/01
LEARJET 60
SERVICE BULLETIN

2. Accomplishment Instructions

A. Gain Access
(1) Set Battery Switch(es) off and disconnect aircraft batteries.

B. Modification of Aircraft

NOTE: The following instruction are applicable to both main landing gear struts.

(1) Replace main landing gear strut lower torque arms as follows: (See Figure 1.)
(a) Jack the aircraft. (Refer to Learjet Maintenance Manual, Chapter 7.)
(b) Remove main landing gear lower torque arm assembly (4). (Refer to Learjet Maintenance
Manual, Chapter 32.)
(c) Inspect the compounds for wear and corrosion. Replace components as required.
(d) Replace apex bushing (2) in upper torque arm (1) if beyond wear tolerance. (Refer to Learjet
Maintenance Manual, Chapter 32.)

NOTE: Replacement apex bushings for upper torque arm apex bushing in new lower
torque arm are reamed to final size during munufacture.

(e) Install lower torque arm (4) with shims (3) as required. (Refer to Learjet Maintenance Manual,
Chapter 32.)
(f) Deflate main landing gear strut and check for binding through full stroke of lower cylinder.
(g) Inflate main landing gear strut. (Refer to Learjet Maintenance Manual, Chapter 12.)
(h) Complete installation of brakes and wheels. (Refer to Learjet Maintenance Manual, Chapter
32.)

C. Restore Aircraft to Airworthy Status


(1) Connect aircraft batteries.

D. Complete the attached Compliance Response Form and return as soon as possible.

E. Complete aircraft maintenance records in accordance with FAR 43.9.

3. Material Information

A. Parts Required

NOTE: The 2384034-2 Kit contains the following parts.

PART NUMBER QTY NOMENCLATURE ALTERNATE PART NUMBER


3188857-004 2 Torque arm assembly 3188857-1

2341127-4 4 Bushing

2341124-1 8 Shim

SB 60-32-1 Rev 2 1 SB Instructions

SB 60-32-1
Page 3 of 4
Nov 10/01
Rev 2 Aug 30/01
LEARJET 60
SERVICE BULLETIN

Replacement of Main Landing Gear Strut Lower Torque Arm


Figure 1

SB 60-32-1
Page 4 of 4
Nov 10/01