Quotation

This document is a quotation for gypsum partition, grid ceiling, and gypsum ceiling work, detailing rates per square foot and material with labor. The rates are 125 for gypsum partition, 80 for grid ceiling, and 70 for gypsum ceiling, all using non-company materials. Payment terms include a 50% upfront payment, 40% upon 50% completion, and 10% upon final completion, with an 18% interest charge on overdue payments.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views2 pages

Quotation

This document is a quotation for gypsum partition, grid ceiling, and gypsum ceiling work, detailing rates per square foot and material with labor. The rates are 125 for gypsum partition, 80 for grid ceiling, and 70 for gypsum ceiling, all using non-company materials. Payment terms include a 50% upfront payment, 40% upon 50% completion, and 10% upon final completion, with an 18% interest charge on overdue payments.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

52, Ashirwad society

TO, mr. sanjay tivari


Kinjal interior B/H vikram park,krishnanagar,Ahm.

Site-ashram road, Devaliya suresh G. Email:-sureshdevaIiya2000@gmaiI.com


ahmedabad mo:-9824488912

QUOTATION OF GYPSUM PARTITiON & CEILING AND GRID CEILING

Rate per Sq. fit & R.fit


no. Description matierial with labour

Gypsum Partition
1 75 mm Thickness Gypsum Partition 125
[not company material]

Grid Ceiling
2 24 mm plain Grid & 8 mm Gypsum PVC 80
Tiles [not company meterial]

Gypsum Ceiling
(12 mm Gypsum Board & Ceiling
3 70
0.35 mm Section)
[Not company meterial]

Payment terms & condition will be as below


No. Discription Amount In percentage
1 this rate is without GST bill -
2 Payment to take when we start the work 50%
3 50% work completed 40%
4 Final work completion 10%
Payment with in a 7 days
5 Interest will be charged 18% per annum on
over due to payment
-