The Daily Attendance Report for the Moncello Crest project on July 18, 2025, indicates a total of 25 personnel, with 16 present and 9 absent. The report includes details on staff, OJT, and workers, highlighting specific attendance times and remarks. The weather was mostly cloudy with a temperature of 23°C.

Uploaded by

Wendelyn Garcia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views2 pages

Dar MCC 18jul25

The Daily Attendance Report for the Moncello Crest project on July 18, 2025, indicates a total of 25 personnel, with 16 present and 9 absent. The report includes details on staff, OJT, and workers, highlighting specific attendance times and remarks. The weather was mostly cloudy with a temperature of 23°C.

Uploaded by

Wendelyn Garcia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Overall Total Manpower Count

Reference No. 7ME-CON-MCC-DAR-2025-029 Workers Total Manpower


Status Staff OJT
Day & Date Friday, 18 July, 2025 Admin Subcon Staff Workers
Project Name Moncello Crest Present 7 0 9 0 7 9
Contract Package Fire Protection, Plumbing and Sanitary Absent 5 3 1 0 8 1
al Time Login 6:30 am
Weather & Temp. Mostly Cloudy 23°C Total Present: 16
* Including
Staff
Total Absent: 9
Overall Manpower 25
DAILY ATTENDANCE REPORT
STAFF
# Employee No. Name Position Scope Time Remarks
1 7ME-CON-0168 Culibra, Loida Quantity Surveyor PLU/FPR 6:25
2 7ME-CON-0378 Corpuz, Cateus John Project Engineer FPR 6:30
3 7ME-CAD-0521 Morales, Eduardo CAD Operator PLU/FPR Absent
4 7ME-PPL-0645 Jebulan, Edmundo Warehouseman PLU/FPR Absent
5 7ME-EHS-0761 Palacios, Rene Safety Officer III FPR 6:16
6 7ME-CON-0827 Santos, Elvin Project Manager PLU/FPR 7:00 WFH
7 7ME-CON-0831 Magante, Chard QA/QC FPR Absent
8 7ME-CON-0842 Lomocso, Ruben III QA/QC PLU 6:15
9 7ME-CON-0882 Villanueva, Shanne BIM Operator PLU/FPR Absent
10 7ME-EHS-0904 Rivera, Jhonica Safety Offier II PLU Absent
11 7ME-CON-0912 Rimando, Jason Rey Site Engineer III PLU 6:45
12 7ME-CON-0920 Fernandez, Kevin Site Engineer III FPR 6:28

OJT
# Employee No. Name Position Scope Time Remarks
1 7ME-OJT-0075 De Leon, Alyssa Mae OJT PLU/FPR Absent
2 7ME-OJT-0076 Magcamit, Angel Shane OJT PLU/FPR Absent
3 7ME-OJT-0077 Ranoco, Catherine Grace OJT PLU/FPR Absent

WORKERS (ADMIN)
# Employee No. Name Position Scope Time Remarks
1 7ME-CON-0036 Junio, Gerald Foreman FPR 6:15
2 7ME-CON-0040 Cartagena, Johnny Helper FPR 6:15
3 7ME-CON-0636 Bodoso, Ian Helper FPR 6:22
4 7ME-CON-0568 Obeso, Wilfredo Foreman PLU 6:14
5 7ME-CON-0457 Endaya, Reynente Helper PLU Absent
6 7ME-CON-0361 Reanias, Marlon Helper PLU 6:15
7 7ME-PRB-0914 Engles, Gary Cris Welder FPR 6:18
8 7ME-PRB-0915 Bugayong, El Jade Welder FPR 6:18
9 Venerable, Cegie Plumber PLU 6:24
10 Leonor, Oscar Plumber PLU 6:18

Workers Foreman Leadman Mason Pipe Fitter Plumber Helper Welder


ADMIN 2 0 0 0 2 3 2
SUBCON 0 0 0 0 0 0 0
Subtotal 2 0 0 0 2 3 2

Page 1 of 2
Overall Total Manpower Count
Reference No. 7ME-CON-MCC-DAR-2025-029 Workers Total Manpower
Status Staff OJT
Day & Date Friday, 18 July, 2025 Admin Subcon Staff Workers
Project Name Moncello Crest Present 7 0 9 0 7 9
Contract Package Fire Protection, Plumbing and Sanitary Absent 5 3 1 0 8 1
al Time Login 6:30 am
Weather & Temp. Mostly Cloudy 23°C Total Present: 16
* Including
Staff
Total Absent: 9
Overall Manpower 25
Overall Total 9

Page 2 of 2