Construction Details

The document lists various construction materials and their quantities required over specific dates in 2025, including items such as cement, bricks, and labor costs. It provides a detailed breakdown of the total units needed and the distribution of these units across different dates. Additionally, it includes financial figures related to labor and other expenses associated with the project.

Uploaded by

storesmgg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views13 pages

Construction Details

The document lists various construction materials and their quantities required over specific dates in 2025, including items such as cement, bricks, and labor costs. It provides a detailed breakdown of the total units needed and the distribution of these units across different dates. Additionally, it includes financial figures related to labor and other expenses associated with the project.

Uploaded by

storesmgg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 13

Material

Sr No. Unit Total 2/7/2025 2/8/2025 2/10/2025 2/11/2025 2/12/2025 2/14/2025 2/15/2025 2/16/2025 2/19/2025 2/22/2025 2/24/2025 3/2/2025 3/5/2025 06.03.2025 10.03.2025 11.03.2025
Description
1 Cement Bag 342 5 10 0 5 10 10 0 10 0 10 30 0 10 10 20 0
2 Morang Troli 15 1 0 0 0 0 1 0 0 0 1 1 0 1 0 0 0
3 Ret (Balu) Troli 9 1 0 1 0 0 0 1 0 0 0 1 0 0 1 0 0
4 Gitti (Rodi),Badi Troli 3 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5 Gitti (Rodi),Choti Nos 3 1 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0
6 Sariya Kg. 1920.3 49 0 0 0 0 0 0 0 99.35 296.25 150 0 0 0 149.2 0
7 Bricks Nos. 26200 4000 0 0 2000 2000 0 0 2000 0 4000 2000 4000 0 2000 0
8 Mitti Troli 48 0 0 0 0 0 0 30 0 0 14 0 0 0 0 1 0
9 Dr.Fixit Composil Ltr. 5 0 0 0 0 0 0 0 0 5 0 0 0 0 0 0 0
10 Tank of trench Nos. 1 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0
11 Ring Nos. 545 0 0 0 0 0 0 0 0 0 0 360 0 0 0 15 50
12 1/2 Bricks Troli 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12.03.2025 17.03.2025 20.03.2025 27.03.2025 06.04.2025 12.04.2025 14.04.2025 01.05.2025 07.05.2025 10.05.2025 17.05.2025 21.05.2025 26.05.2025 28.05.2025 29.05.2025 31.05.2025 06.06.2025 12.06.2025 21.06.2025

0 10 4 71 10 0 8 1 10 5 10 20 0 10 0 0 1 10 7
1 0 0 3 1 0 0 0 1 0 0 1 0 0 0 0 0 0 1
0 1 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 1
0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
18.2 0 0 1001.65 50 0 6.85 0 99.8 0 0 0 0 0 0 0 0 0 0
0 0 2000 0 0 2000 0 0 0 0 0 0 0 0 200 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 50 70 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0
24.06.2025 29.06.2025 03.07.2025

10 15 10
0 1 1
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Sr. No. Material Description Unit Total 2/7/2025 2/8/2025 2/11/2025
1 Mistri Rs. 260960 0 10000 20000
2 Bilinding Material Rs. 380000 10000 0 0
3 Motor & Fitting,Nul Rs. 13200 8900 0 3800
4 Wire Rs. 1880 0 0 1880
5 Bricks Rs. 199550 30000 0 14050
6 Other Expense Rs. 5950 0 0 320
7 Mitti Rs. 33800 0 0 0
8 Trench for Water Tank Rs. 950 0 0 0
9 Choukhat + Bhada,Gate Rs. 111100 0 0 0
10 Labour for Mitti Rs. 2100 0 0 0
11 Taar,Tirpal,Pipe,Light Rs. 6944 0 0 0
12 Plumber Material (Chandrapal) Rs. 30000 0 0 0
13 Plumber Charge Rs. 19200 0 0 0
14 Wiring Material Rs. 6000 0 0 0
15 Electrician Mourya Rs. 10800 0 0 0
16 KHUSHAAL FEES Rs. 5000 0 0 0
17 Tiles Mistri Rs. 20000 0 0 0
18 Tiles Shopkeeper Rs. 20000
0
Total Rs. 1127434
2/12/2025 2/13/2025 2/15/2025 2/16/2025 2/19/2025 2/22/2025 2/24/2025 3/2/2025
0 20000 0 0 0 0 50000 0
30000 0 0 0 0 0 60000 0
500 0 0 0 0 0 0 0
0 0 0 0 0 0 0
14050 0 0 14050 0 0 28000 14500
1650 350 160 0 0 600 0 0
0 0 20700 0 0 9500 0 0
0 0 0 0 950 0 0
0 0 0 0 0 30000 0 35300
0 0 0 0 0 1300 0 0
0 0 0 0 184 180 1000 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
3/5/2025 3/10/2025 11.03.2025 12.03.2025 29.03.2025 06.04.2025 09.04.2025 11.04.2025
0 0 0 10000 38460 0 10000 0
0 45000 0 0 85000 50000 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
28000 0 14000 0 14000 0 0 14000
0 0 0 0 2170 0 0 0
0 1500 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 20000
0 0 0 0 0 0 0 0
0 0 0 80 5500 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
30.04.2025 for
14.04.2025 24.04.2025 07.05.2025 09.05.2025 19.05.2025 22.05.2025 28.05.2025
saitring roof
10000 0 2500 30000 0 0 20000 0
0 0 0 0 0 50000 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 25800 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 20000 0 0 0 0
0 0 10000 0 7000 0 500 1000
0 0 0 0 5600 0 0 0
0 0 0 0 10000 0 0 0
0 0 0 0 0 5000 0 0
0 0 0 0 0 0 0 0
29.05.2025 31.05.2025 21.06.2025 25.06.2025 29.06.2025 01.07.2025 07.07.2025
0 10000 20000 0 10000 0 0
0 0 0 0 0 50000 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
14900 0 0 0 0 0 0
0 0 700 0 0 0 0
0 2100 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 800 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 10000 0 0 0
0 700 0 0 0 0 0
0 0 400 0 0 0 0
0 0 800 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 10000 0 10000
20000
Sr No. Material Decription Unit Qty.
1 Bathroom wall tiles Box 46
2 Bathroom floor tiles Box 10
3 Tiles Charges Rs.
4 Shukla Tiles Rs.