0% found this document useful (0 votes)
16 views9 pages

Maint Plan PV351D

The document outlines the maintenance plan for the Atlas Copco PV-351D drilling machine, emphasizing the importance of using Atlas Copco lubricants for optimal performance. It includes a detailed schedule of maintenance tasks at various hour intervals, along with specific service kits and task descriptions for each maintenance phase. The document also highlights the commitment to sustainable productivity and provides contact information for further assistance.

Uploaded by

edwar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views9 pages

Maint Plan PV351D

The document outlines the maintenance plan for the Atlas Copco PV-351D drilling machine, emphasizing the importance of using Atlas Copco lubricants for optimal performance. It includes a detailed schedule of maintenance tasks at various hour intervals, along with specific service kits and task descriptions for each maintenance phase. The document also highlights the commitment to sustainable productivity and provides contact information for further assistance.

Uploaded by

edwar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

Atlas Copco Drilling Solutions

Parts and Services

Maintenance Plan
MODEL : PV-351D
Serial Number : US080188
Atlas Copco Fluids

Optimizes the machine performance.


Atlas Copco machines have been built to last. Day in, day out, they deliver
performance in the most efficient and cost effective manner. They provide a driving
force in your business, allowing no margin for error.

To safeguard the high operating standards for which we designed this equipment
and to benefit fully from its high reliability and long service life, it is essential to use
only the most appropriate lubricants. No one is better placed than Atlas Copco to
formulate the exact oil specifications for its equipment. No other lubricant is a better
match for our precision mechanics and no other oil or grease can guarantee the
optimal performance of every Atlas Copco component. For Atlas Copco machines,
Atlas Copco lubricants are the only real choice.
Maintenance Plan
MODEL: PV-351D
Serial Number: US080188
Visit Hours PM Kit PM Description Technician Date
1 250 A 250 Hour Maintenance ___________ _________
2 500 B 500 Hour Maintenance ___________ _________
3 750 A 250 Hour Maintenance ___________ _________
4 1000 C 1000 Hour Maintenance ___________ _________
5 1250 A 250 Hour Maintenance ___________ _________
6 1500 B 500 Hour Maintenance ___________ _________
7 1750 A 250 Hour Maintenance ___________ _________
8 2000 D 2000 Hour Maintenance ___________ _________
9 2250 A 250 Hour Maintenance ___________ _________
10 2500 B 500 Hour Maintenance ___________ _________
11 2750 A 250 Hour Maintenance ___________ _________
12 3000 C 1000 Hour Maintenance ___________ _________
13 3250 A 250 Hour Maintenance ___________ _________
14 3500 B 500 Hour Maintenance ___________ _________
15 3750 A 250 Hour Maintenance ___________ _________
16 4000 D 2000 Hour Maintenance ___________ _________
17 4250 A 250 Hour Maintenance ___________ _________
18 4500 B 500 Hour Maintenance ___________ _________
19 4750 A 250 Hour Maintenance ___________ _________
20 5000 E 5000 Hour Maintenance ___________ _________
250 Hours Maintenance Service and Task List
PM Kit A Part Number: 2658003336 Qty = 1

Task Description Verify Task Description Verify


Change Engine Oil ______ Lube Tower Central Bank ______
Change Engine Oil Filters ______ Lube Frame Central Bank ______
Change Engine Fuel Filters ______ Lube Carousel and Cups ______
Change Primary Fuel/Water Separators ______ Check Feed Cable-Sag ______
Change Engine Coolant Filter ______ Feed Cable and Wire Rope-Clean and Lube ______
Check Engine DCA/SCA Level ______ Auxiliary Hoist-Periodic Inspection ______
Check Radiator Coolant Level ______ Jib Hoist-Check Cable Condition ______
Clean Cooling Fins ______ Track Gearbox: Check Oil Level ______
Check Engine Belts and Tensioner ______ Track Gearbox: Check for Oil Leaks ______
Battery, Check Electrolyte Level ______ Track Gearbox: Check for Unusual Noises ______
Battery, Check Terminals-Clean and Tighten ______ Check Track Tension ______
Empty Dust Cups ______ Track Gearbox: Check Torque Bolts/Nuts ______
Clean Compressor Oil Strainer ______ Perform Hydraulic Oil Sample ______
Check Compressor Oil Level ______ Perform Compressor Oil Sample ______
Comp Air Hose/Clamps-Inspect and Tighten ______
Pump Drive Gearbox: Check for Oil Leaks ______
Pump Drive Gearbox: Check Oil Level ______
Fuel Tank-Check Fuel Level ______
Hyd. Reservoir-Check Oil Level ______
Check Main Return Oil Filter Indicator ______
Check Case Drain Oil Filter Indicator ______
Check Rotary Head Oil Level ______
500 Hours Maintenance Service and Task List
PM Kit B Part Number: 2658003351 Qty = 1

Task Description Verify Task Description Verify


Change Engine Oil ______ Check Case Drain Oil Filter Indicator ______
Change Engine Oil Filters ______ Check Rotary Head Oil Level ______
Change Engine Fuel Filters ______ Lube Upper Rotary Head Bearing ______
Change Primary Fuel/Water Separators ______ Lube Tower Central Bank ______
Change Engine Coolant Filter ______ Lube Frame Central Bank ______
Check Engine DCA/SCA Level ______ Lube Carousel and Cups ______
Check Radiator Coolant Level ______ Check Feed Cable-Sag ______
Clean Cooling Fins ______ Feed Cable and Wire Rope-Clean and Lube ______
Check Engine Belts and Tensioner ______ Auxiliary Hoist-Periodic Inspection ______
Battery, Check Electrolyte Level ______ Auxiliary Hoist-Check Oil Level ______
Battery, Check Terminals-Clean and Tighten ______ Jib Hoist-Check Cable Condition ______
Change Air Primary and Safety Elements ______ Track Gearbox: Check Oil Level ______
Check Connections and Ducts for Leaks ______ Track Gearbox: Check for Oil Leaks ______
Empty Dust Cups ______ Track Gearbox: Check for Unusual Noises ______
Check Compressor Oil Level ______ Check Track Tension ______
Comp Air Hose/Clamps-Inspect and Tighten ______ Track Gearbox: Check Torque Bolts/Nuts ______
Pump Drive Gearbox: Check for Oil Leaks ______ Perform Hydraulic Oil Sample ______
Pump Drive Gearbox: Check Oil Level ______ Perform Compressor Oil Sample ______
Change Fuel Tank Breather ______
Fuel Tank-Check Fuel Level ______
Hyd. Reservoir-Check Oil Level ______
Check Main Return Oil Filter Indicator ______
Change Cab Air Filters ______
1000 Hours Maintenance Service and Task List
PM Kit C Part Number: 2658003377 Qty = 1

Task Description Verify Task Description Verify


Change Engine Oil ______ Change Rotary Head Oil ______
Change Engine Oil Filters ______ Rod Changer-Change Gear Oil ______
Change Engine Fuel Filters ______ Fuel Tank-Check Fuel Level ______
Change Primary Fuel/Water Separators ______ Hyd. Reservoir-Check Oil Level ______
Change Engine Coolant Filter ______ Lube Tower Central Bank ______
Check Engine DCA/SCA Level ______ Lube Frame Central Bank ______
Check Radiator Coolant Level ______ Lube Carousel and Cups ______
Clean Cooling Fins ______ Check Feed Cable-Sag ______
Check Engine Belts and Tensioner ______ Feed Cable and Wire Rope-Clean and Lube ______
Battery, Check Electrolyte Level ______ Auxiliary Hoist-Periodic Inspection ______
Battery, Check Terminals-Clean and Tighten ______ Auxiliary Hoist-Change Oil ______
Change Air Primary and Safety Elements ______ Jib Hoist-Check Cable Condition ______
Check Connections and Ducts for Leaks ______ Track Gearbox: Check Oil Level ______
Empty Dust Cups ______ Track Gearbox: Check for Oil Leaks ______
Clean Compressor Oil Strainer ______ Track Gearbox: Check for Unusual Noises ______
Change Compressor Oil Filters ______ Check Track Tension ______
Change Compressor Oil ______ Track Gearbox: Check Torque Bolts/Nuts ______
Comp Air Hose/Clamps-Inspect and Tighten ______ Perform Hydraulic Oil Sample ______
Pump Drive Gearbox: Change Oil ______ Perform Compressor Oil Sample ______
Pump Drive Gearbox: Check for Oil Leaks ______
Change Fuel Tank Breather ______
2000 Hours Maintenance Service and Task List
PM Kit D Part Number: 2658003393 Qty = 1

Task Description Verify Task Description Verify


Change Engine Oil ______ Change Rotary Head Oil ______
Change Engine Oil Filters ______ Rod Changer-Change Gear Oil ______
Change Engine Fuel Filters ______ Fuel Tank-Check Fuel Level ______
Change Primary Fuel/Water Separators ______ Hyd. Reservoir-Check Oil Level ______
Change Engine Coolant Filter ______ Lube Tower Central Bank ______
Check Engine DCA/SCA Level ______ Lube Frame Central Bank ______
Check Radiator Coolant Level ______ Lube Carousel and Cups ______
Clean Cooling Fins ______ Check Feed Cable-Sag ______
Check Engine Belts and Tensioner ______ Feed Cable and Wire Rope-Clean and Lube ______
Battery, Check Electrolyte Level ______ Auxiliary Hoist-Periodic Inspection ______
Battery, Check Terminals-Clean and Tighten ______ Auxiliary Hoist-Change Oil ______
Change Air Primary and Safety Elements ______ Jib Hoist-Check Cable Condition ______
Check Connections and Ducts for Leaks ______ Track Gearbox: Check Oil Level ______
Empty Dust Cups ______ Track Gearbox: Check for Oil Leaks ______
Clean Compressor Oil Strainer ______ Track Gearbox: Check for Unusual Noises ______
Change Compressor Oil Filters ______ Check Track Tension ______
Change Compressor Oil ______ Track Gearbox: Check Torque Bolts/Nuts ______
Comp Air Hose/Clamps-Inspect and Tighten ______ Perform Hydraulic Oil Sample ______
Pump Drive Gearbox: Change Oil ______ Perform Compressor Oil Sample ______
Pump Drive Gearbox: Check for Oil Leaks ______
Change Fuel Tank Breather ______
Change Hyd. Tank Breather ______
Change Separator Element in Receiver Tank ______
Service Notes:
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
Committed to
sustainable productivity.

www.atlascopco.com/drillingsolutions
www.acdsgarland.com

Copyright © 2013 Atlas Copco Drilling Solutions, LLC

You might also like