TAISEI – DMCI JOINT VENTURE
North – South Commuter Railway Project (CP01)
Elevated Structures 6 Stations and Depot
Location: West Valenzuela Station, GL C-D/4 Date: 27-Jan-23
Work Description: Reinforcement Inspection Structure: Step 2 Beam and Wall
ITEM PUNCHLIST
Beam
1 Provide cleaning on rebars
2 Rebar arrangement for beam not as per detail. Congested areas needs to be rectified. Filler bar to be provided.
3 Arrange stirrup spacing as per details.
4 Roughening and cleaning of CJ to be provided
5 Provide sufficient tie wires on stirrups.
6 Verify expansion/isolation joint material between beam and column.
7 Maintain sufficient concrete cover on all areas as per detail.
8 Housekeeping
Wall
1 Cranking of horizontal bar for W20 not accepted. Follow the detail in the drawing.
2 Missing filler horizontal bar 12mm dia. for W20.
3 Missing B3 stair dowel bar 12mm dia. for W20.
4 Missing horizontal bar 12mm dia. for W15 lap splice.
5 Provide roughening and cleaning of CJ at W15.
6 Provide sufficient tie wires.
7 Maintain sufficient concrete cover on all areas as per detail.
8 Housekeeping
****Nothing follows***