0% found this document useful (0 votes)
21 views1 page

GL C-D (4) Step 2 Wall and Beam

The document outlines a punch list for reinforcement inspection of the North-South Commuter Railway Project's elevated structures, specifically focusing on beams and walls. It details necessary corrections such as rebar cleaning, arrangement, and spacing, as well as ensuring proper concrete cover and housekeeping. The list highlights specific missing components and required adjustments to meet project specifications.

Uploaded by

Gilbert Timog
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views1 page

GL C-D (4) Step 2 Wall and Beam

The document outlines a punch list for reinforcement inspection of the North-South Commuter Railway Project's elevated structures, specifically focusing on beams and walls. It details necessary corrections such as rebar cleaning, arrangement, and spacing, as well as ensuring proper concrete cover and housekeeping. The list highlights specific missing components and required adjustments to meet project specifications.

Uploaded by

Gilbert Timog
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

TAISEI – DMCI JOINT VENTURE

North – South Commuter Railway Project (CP01)


Elevated Structures 6 Stations and Depot

Location: West Valenzuela Station, GL C-D/4 Date: 27-Jan-23

Work Description: Reinforcement Inspection Structure: Step 2 Beam and Wall

ITEM PUNCHLIST

Beam

1 Provide cleaning on rebars

2 Rebar arrangement for beam not as per detail. Congested areas needs to be rectified. Filler bar to be provided.

3 Arrange stirrup spacing as per details.

4 Roughening and cleaning of CJ to be provided

5 Provide sufficient tie wires on stirrups.

6 Verify expansion/isolation joint material between beam and column.

7 Maintain sufficient concrete cover on all areas as per detail.

8 Housekeeping

Wall

1 Cranking of horizontal bar for W20 not accepted. Follow the detail in the drawing.

2 Missing filler horizontal bar 12mm dia. for W20.

3 Missing B3 stair dowel bar 12mm dia. for W20.

4 Missing horizontal bar 12mm dia. for W15 lap splice.

5 Provide roughening and cleaning of CJ at W15.

6 Provide sufficient tie wires.

7 Maintain sufficient concrete cover on all areas as per detail.

8 Housekeeping