We-1023761 Ac & DC Calculation

The document outlines the base design and load calculations for the refurbishment of the 110/33/13.8kV Arafat Substation's 13.8kV switchgear. It includes detailed DC and AC load calculations for various panels, specifying continuous and momentary loads, and emphasizes that these calculations are subject to change based on client comments. The document is not to be used for construction or material ordering until certified and dated.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views8 pages

We-1023761 Ac & DC Calculation

The document outlines the base design and load calculations for the refurbishment of the 110/33/13.8kV Arafat Substation's 13.8kV switchgear. It includes detailed DC and AC load calculations for various panels, specifying continuous and momentary loads, and emphasizes that these calculations are subject to change based on client comments. The document is not to be used for construction or material ordering until certified and dated.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

CERT'D

NATIONAL GRID SA. ‫الشركة الوطنية لنقل الكهرباء‬


A.M

A.M
APPR'D

A.M

A.M
CHK'D

M.Q

M.Q
AS PER COMMENTS
DESCRIPTION

FIRST ISSUE

BASE DESIGN
AC & DC LOAD CALCULATION
13.8kV SWITCHGEAR
REFURBISHMENT OF 110/33/13.8kV ARAFAT SUBSTATION
U.K

U.K
BY

13.05.2025

19.06.2025
DATE
REV.

00

01

REVISIONS

DESIGNED

BY:

DATE:

CHECKED

BY:-

DATE:-

OPRG. DEPT

BY

DATE:-

ENG'G. DEPT.

BY:-

DATE:-

CERTIFIED.

BY:-

DATE:- AS BUILT BY: DATE:

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING/DOCUMENT IS
NOT TO BE USED FOR
AC/DC Calculation
CONSTRUCTION OR FOR A NG2085 WE-1023761 1 of 8 01
ORDERING MATERIALS UNTIL FOR 13.8kV SWITCHGEAR
CERTIFIED AND DATED

MAKKAH SAUDI ARABIA CONTRACT NO: 4400021841 DCS NO.: WE-1023321

# CLASSIFICATION: Public
DC LOAD CALCULATIONS, 13.8kV SWITCHGEAR TYPE ALFA12

THE LOADS PER PANEL


SR NO. PANEL DESCRIPTION QTY.
CONTINUOUS MOMENTARY

1 TRANSFORMER INCOMER FEEDER PANEL 1 50.4 799

2 BUS SECTION PANEL 1 43.8 663.1

3 BUS VT/ EARTHING PANEL 1 30.3 821.2

4 STATCOM OUTGOING FEEDER PANEL 2 43.1 599.5

5 PLAIN OUTGOING FEEDER PANEL 24 36.1 599.5

THE TOTAL ESTIMATION CONTINUOUS DC LOADS FOR ALL PANELS (W)= 1077.1
THE TOTAL ESTIMATION MOMENTARY DC LOADS FOR ALL PANELS (W)= 17870.3
TOTAL ESTIMATION WITH SAFETY FACTOR 10% FOR CONTINUOUS DC LOADS FOR ALL PANELS (W)= 1184.81
TOTAL ESTIMATION WITH SAFETY FACTOR 10% FOR MOMENTARY DC LOADS FOR ALL PANELS (W)= 19657.33

General Notes:
1. Vaccum Circuit Breaker (VCB) characteristics are as follows:
a) Breaker Motor Spring charging time = 12s
b) Breaker closing coil operating time = 45ms (Approximately)
c) Breaker shunt trip coil operating time = 45ms (Approximately)
2. This calculation is only a tabulation of the DC loads of the ALFA12 Switchgear only. It is the responsibility of the Main Contractor to consider the
appropriate loads which he belives affects his DC system sizing calculation.
3.The calulation / tabulation is subjected to change based on comments by our client on the switchgear DC components.
4.Total estimation with safety factor 10% for continuous and momentory DC loads has been considered.

DC LOAD CALCULATION FOR ALL PANELS

NATIONAL GRID SA. 13.8kV SWITCHGEAR

01 AS PER COMMENTS A.M 2025 25 U.K M.Q ‫الشركة الوطنية لنقل الكهرباء‬ REFURBISHMENT OF 110/33/13.8kV ARAFAT SUBSTATION

00 FIRST ISSUE A.M 2025 20 U.K M.Q CONTRACT NO. DCS NO. PLANT DRAWING NO. SHEET REV.

REV. DESCRIPTION APPD. YEAR WEEK BY CHKD 4400021841 WE-1023321 NG2085 WE-1023761 2 of 8 01

# CLASSIFICATION: Public
AC LOAD CALCULATIONS, 13.8kV SWITCHGEAR TYPE ALFA12

BURDEN TOTAL LOADS


SR NO. COMPONENT DESCRIPTION QTY.
(W) CONTINUOUS MOMENTARY

1 HEATER LOW VOLTAGE 150 29 4350

2 HEATER CABLE COMPARTMENT 25 29 725

3 230VAC OUTLET FOR INCOMERS 1000 1 1000

4 LAMP 9 51 459

5 FAN CONTROLLER RELAY ZELIO 7 6 42

6 UPPER FAN 180 12 2160

7 RXM AUX. RELAY FOR SCHEME PURPOSE 1 26 13 13

THE TOTAL ESTIMATION CONTINUOUS DC LOADS FOR ALL PANELS (W)= 514
THE TOTAL ESTIMATION MOMENTARY DC LOADS FOR ALL PANELS (W)= 8248

Notes:
1. This calculation is only a tabulation of the AC loads of ALFA12 Switchgear. It is the responsibility of the Main Contractor to consider the appropriate loads which he belives
affects his AC system.
2.This calulation is subjected to change based on comments by our client on the switchgear AC components.

AC LOAD CALCULATION, FOR ALL PANELS

NATIONAL GRID SA. 13.8kV SWITCHGEAR

01 AS PER COMMENTS A.M 2025 25 U.K M.Q ‫الشركة الوطنية لنقل الكهرباء‬ REFURBISHMENT OF 110/33/13.8kV ARAFAT SUBSTATION

00 FIRST ISSUE A.M 2025 20 U.K M.Q CONTRACT NO. DCS NO. PLANT DRAWING NO. SHEET REV.

REV. DESCRIPTION APPD. YEAR WEEK BY CHKD 4400021841 WE-1023321 NG2085 WE-1023761 3 of 8 01

# CLASSIFICATION: Public
DC LOAD CALCULATIONS, 13.8kV SWITCHGEAR TYPE ALFA12
TRANSFORMER INCOMER PANELS
TOTAL LOADS
SR NO. COMPONENT DESCRIPTION BURDEN (W) QTY.
CONTINUOUS MOMENTARY

1 CB CHARGING MOTOR (MCH) (12SEC) 125 0 0

2 CB SHUNTCOIL (TC)(45mSEC) 200 2 400

3 CB CLOSING COIL ©(45mSEC) 200 0 0

4 E.S BLOCKING COIL 66 2 132

5 INDICATION LAMPS 2.6 8 10.4 10.4

6 CONTROL IED 18 1 18

7 RXSF1 DC CIRCUIT SUPERVISION 1.3 2 2.6 2.6

8 RXMB1 AUX. RELAY TEST/SERV MULTIP. 2 3 6

9 VDF10 TRIP CIRCUIT SUPERVISION 1.35 2 2.7

10 RXSF1 TRIP CIRCUIT SUPERVISION 1.3 2 2.6

11 ALPHA-TR RELAY FOR 50BF 127 2 254

12 RXM AUX. RELAY FOR SCHEME PURPOSE 1 5 5

13 RXMVB2 , ON /OFF Contact Multi Relay ABB 3.1 1 3.1

TOTAL LOAD ESTIMATED(Watts): 50.4 799

NOTE:

- DC CALCULATION SUBJECT TO BE CHANGED , BASED ON SEC APPROVAL FOR BASE DESIGN SUBMISSION.

DC LOAD CALCULATION, FOR TRANSFORMER INCOMER PANELS

NATIONAL GRID SA. 13.8kV SWITCHGEAR

01 AS PER COMMENTS A.M 2025 25 U.K M.Q ‫الشركة الوطنية لنقل الكهرباء‬ REFURBISHMENT OF 110/33/13.8kV ARAFAT SUBSTATION

00 FIRST ISSUE A.M 2025 20 U.K M.Q CONTRACT NO. DCS NO. PLANT DRAWING NO. SHEET REV.

REV. DESCRIPTION APPD. YEAR WEEK BY CHKD 4400021841 WE-1023321 NG2085 WE-1023761 4 of 8 01

# CLASSIFICATION: Public
DC LOAD CALCULATIONS, 13.8kV SWITCHGEAR TYPE ALFA12
BUS SECTION PANEL
TOTAL LOADS
SR NO. COMPONENT DESCRIPTION BURDEN (W) QTY.
CONTINUOUS MOMENTARY

1 CB CHARGING MOTOR (MCH) (12SEC) 125 0 0

2 CB SHUNTCOIL (TC)(45mSEC) 200 2 400

3 CB CLOSING COIL ©(45mSEC) 200 0 0

4 INDICATION LAMPS 2.6 7 9.1 9.1

5 CONTROL IED 18 1 18

6 RXSF1 DC CIRCUIT SUPERVISION 1.3 2 2.6

7 RXMB1 AUX. RELAY TEST/SERV MULTIP. 2 3 6

9 RXM AUX. RELAY FOR SCHEME PURPOSE 1 5 5

10 RXMVB2 , ON /OFF Contact Multi Relay ABB 3.1 1 3.1

11 ALPHA-TR RELAY FOR 50BF & 50/51 127 2 254

TOTAL LOAD ESTIMATED(Watts): 43.8 663.1

NOTE:

- DC CALCULATION SUBJECT TO BE CHANGED , BASED ON SEC APPROVAL FOR BASE DESIGN SUBMISSION.

DC LOAD CALCULATION, FOR BUS SECTION PANEL

NATIONAL GRID SA. 13.8kV SWITCHGEAR

01 AS PER COMMENTS A.M 2025 25 U.K M.Q ‫الشركة الوطنية لنقل الكهرباء‬ REFURBISHMENT OF 110/33/13.8kV ARAFAT SUBSTATION

00 FIRST ISSUE A.M 2025 20 U.K M.Q CONTRACT NO DCS NO. PLANT DRAWING NO. SHEET REV.

REV. DESCRIPTION APPD. YEAR WEEK BY CHKD 4400021841 WE-1023321 NG2085 WE-1023761 5 of 8 01

# CLASSIFICATION: Public
DC LOAD CALCULATIONS, 13.8kV SWITCHGEAR TYPE ALFA12
BUS VT/ BUS RISER EARTHING PANELS
TOTAL LOADS
SR NO. COMPONENT DESCRIPTION BURDEN (W) QTY.
CONTINUOUS MOMENTARY

1 E.S BLOCKING COIL 66 1 66

2 INDICATION LAMPS 2.6 2 2.6 5.2

3 RXSF1 DC CIRCUIT SUPERVISION 1.3 2 2.6

4 ES MULTIPLICATION RELAY 6RJ25 150 1 150

5 DIGITAL VOLTMETER TYPE MC330 4 1 4

6 RXM AUX. RELAY FOR SCHEME PURPOSE 1 5 5

7 HIGH IMPEDANCE PROTECTION RELAY 7 1 7

8 7840FD LOCK-OUT RELAY TRIPPING TC-1 150 1 150

9 7840FD LOCK-OUT RELAY TRIPPING TC-2 150 1 150

10 7840FD LOCK-OUT RELAY CLOSE BLOCK/CBF INITIATION 150 1 150

11 7840FD LOCK-OUT RELAY TRIPPING / BLOCKING 150 1 150

12 RXMVB2 ,IN/OUT RELAY OF 87B 3.1 1 3.1

13 CT SUPERVISION RELAY 2V68-S 6 1 6

TOTAL LOAD ESTIMATED(Watts): 30.3 821.2

NOTE:

- DC CALCULATION SUBJECT TO BE CHANGED , BASED ON SEC APPROVAL FOR BASE DESIGN SUBMISSION.

DC LOAD CALCULATION, FOR BUSVT/ BUS RISER EARTHING PANELS

NATIONAL GRID SA. 13.8kV SWITCHGEAR

01 AS PER COMMENTS A.M 2025 25 U.K M.Q ‫الشركة الوطنية لنقل الكهرباء‬ REFURBISHMENT OF 110/33/13.8kV ARAFAT SUBSTATION

00 FIRST ISSUE A.M 2025 20 U.K M.Q CONTRACT NO DCS NO. PLANT DRAWING NO. SHEET REV.

REV. DESCRIPTION APPD. YEAR WEEK BY CHKD 4400021841 WE-1023321 NG2085 WE-1023761 6 of 8 01

# CLASSIFICATION: Public
DC LOAD CALCULATIONS, 13.8kV SWITCHGEAR TYPE ALFA12
STATCOM OUTGOING FEEDER PANELS
TOTAL LOADS
SR NO. COMPONENT DESCRIPTION BURDEN (W) QTY.
CONTINUOUS MOMENTARY

1 CB CHARGING MOTOR (MCH) (12SEC) 125 0 0

2 CB SHUNTCOIL (TC)(45mSEC) 200 2 400

3 CB CLOSING COIL ©(45mSEC) 200 0 0

4 E.S BLOCKING COIL 66 1 66

5 HIGH IMPEDANCE PROTECTION RELAY 7SL86D 7 1 7

6 INDICATION LAMPS 2.6 5 6.5 6.5

7 CONTROL IED 18 1 18

8 RXSF1 DC CIRCUIT SUPERVISION 1.3 2 2.6

9 ALPHA-TR RELAY FOR 50BF 127 1 127

10 RXMB1 AUX. RELAY TEST/SERV MULTIP. 2 2 4

11 RXM AUX. RELAY FOR SCHEME PURPOSE 1 5 5

TOTAL LOAD ESTIMATED(Watts): 43.1 599.5

NOTE:

- DC CALCULATION SUBJECT TO BE CHANGED , BASED ON SEC APPROVAL FOR BASE DESIGN SUBMISSION.

DC LOAD CALCULATION, FOR METERED OUTGOING FEEDER PANEL

NATIONAL GRID SA. 13.8kV SWITCHGEAR

01 AS PER COMMENTS A.M 2025 25 U.K M.Q ‫الشركة الوطنية لنقل الكهرباء‬ REFURBISHMENT OF 110/33/13.8kV ARAFAT SUBSTATION

00 FIRST ISSUE A.M 2025 20 U.K M.Q CONTRACT NO DCS NO. PLANT DRAWING NO. SHEET REV.

REV. DESCRIPTION APPD. YEAR WEEK BY CHKD 4400021841 WE-1023321 NG2085 WE-1023761 7 of 8 01

# CLASSIFICATION: Public
DC LOAD CALCULATIONS, 13.8kV SWITCHGEAR TYPE ALFA12
PLAIN OUTGOING FEEDER PANELS
TOTAL LOADS
SR NO. COMPONENT DESCRIPTION BURDEN (W) QTY.
CONTINUOUS MOMENTARY

1 CB CHARGING MOTOR (MCH) (12SEC) 125 0 0

2 CB SHUNTCOIL (TC)(45mSEC) 200 2 400

3 CB CLOSING COIL ©(45mSEC) 200 0 0

4 E.S BLOCKING COIL 66 1 66

5 INDICATION LAMPS 2.6 5 6.5 6.5

6 CONTROL IED 18 1 18

7 RXSF1 DC CIRCUIT SUPERVISION 1.3 2 2.6

8 ALPHA-TR RELAY FOR 50BF 127 1 127

9 RXMB1 AUX. RELAY TEST/SERV MULTIP. 2 2 4

10 RXM AUX. RELAY FOR SCHEME PURPOSE 1 5 5

TOTAL LOAD ESTIMATED(Watts): 36.1 599.5

NOTE:
- DC CALCULATION SUBJECT TO BE CHANGED , BASED ON SEC APPROVAL FOR BASE DESIGN SUBMISSION.

DC LOAD CALCULATION, FOR PLAIN OUTGOING FEEDER PANELS

NATIONAL GRID SA. 13.8kV SWITCHGEAR

01 AS PER COMMENTS A.M 2025 25 U.K M.Q ‫الشركة الوطنية لنقل الكهرباء‬ REFURBISHMENT OF 110/33/13.8kV ARAFAT SUBSTATION

00 FIRST ISSUE A.M 2025 20 U.K M.Q CONTRACT NO DCS NO. PLANT DRAWING NO. SHEET REV.

REV. DESCRIPTION APPD. YEAR WEEK BY CHKD 4400021841 WE-1023321 NG2085 WE-1023761 8 of 8 01

# CLASSIFICATION: Public

You might also like