0% found this document useful (0 votes)
9 views3 pages

Furnishing of Projects - PMC

The document consists of correspondence from the Municipal Planning & Development Coordinator and the Project Monitoring Committee to Engr. Amalia L. Francisco, requesting detailed lists of implemented, completed, and ongoing projects for an upcoming seminar. Additionally, it includes a Punch List for the drainage canal system and an Accomplishment Report for various construction projects. The letters emphasize the importance of cooperation for the success of the municipality's development initiatives.

Uploaded by

kazer.perez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views3 pages

Furnishing of Projects - PMC

The document consists of correspondence from the Municipal Planning & Development Coordinator and the Project Monitoring Committee to Engr. Amalia L. Francisco, requesting detailed lists of implemented, completed, and ongoing projects for an upcoming seminar. Additionally, it includes a Punch List for the drainage canal system and an Accomplishment Report for various construction projects. The letters emphasize the importance of cooperation for the success of the municipality's development initiatives.

Uploaded by

kazer.perez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Republic of the Philippines

Province of Aklan
Ati-atihan Town of Kalibo

OFFICE OF THE MUNICIPAL PLANNING &


DEVELOPMENT COORDINATOR
October 24, 2024

ENGR. AMALIA L. FRANCISCO


Municipal Engineer/Building Official
Municipal Engineering’s Office
This Municipality

Dear Engr. Francisco,

Warmest greetings!

In preparation for the upcoming Barangay Development Plan Seminar/Workshop scheduled on


October 28-30, 2024, we are in the process of creating a video presentation to showcase the
various development projects in the municipality. To ensure the accuracy and completeness of
the presentation, we would like to request a detailed list of the following:

1. Implemented Projects: Projects that have been initiated or are ongoing.

2. Completed Projects: Projects that have been fully completed, including their timelines and key
achievements.

3. Ongoing Projects: Projects that are currently in progress and their expected completion dates.

Your cooperation in this matter is highly appreciated as it will greatly contribute to the success of
the event. Thank you for your attention and continued cooperation.

Sincerely,

ENGR. MARLO B. VILLANUEVA


Municipal Planning & Development Coordinator
Republic of the Philippines
Province of Aklan
Ati-atihan Town of Kalibo

PROJECT MONITORING COMMITTEE


October 21, 2024

ENGR. AMALIA L. FRANCISCO


Municipal Engineer/Building Official
Municipal Engineering’s Office
This Municipality

Dear Engr. Francisco,

Warmest greetings!

Furnishing you herewith is the copy of the Punch List for the Construct/Rehabilitation of
Drainage Canal System at Brgy. Briones, Kalibo, Aklan.

Thank you for your attention and continued cooperation.

Sincerely,

SBM PHILLIP Y. KIMPO, JR.


SBM/PMC-Chairperson

Republic of the Philippines


Province of Aklan
Ati-atihan Town of Kalibo

PROJECT MONITORING COMMITTEE


October 17, 2024

ENGR. AMALIA L. FRANCISCO


Municipal Engineer/Building Official
Municipal Engineering’s Office
This Municipality

Dear Engr. Francisco,

Warmest greetings!

Furnishing you herewith is the copy of the Accomplishment Report, Punch List, and the Final
Inspection Sign-off for the following projects:

1. Construction of Flood Control Project (Revetment wall)


2. Rehabilitation/Improvement of 3rd Floor New Building
3. Construction of Polyclinic/Satellite Health Center
4. Construction/Improvement of LGU Canteen
5. Construction/ Improvement of School Building (New Buswang)
6. Construction/Completion of Rural Health Center II
7. Improvement of Pastrana Park (Fountain)
8. Construction of Drainage (Tinigaw)
9. Construction of Drainage (Tigayon)
10. Construction of Retaining Wall
11. Concreting of Road (Gumamela Rd., Pook)
12. Concreting of Road (Acevedo Rd., Old Buswang)
13. Concreting of Road (Purok-1, Mobo)
14. Installation of 109 Units Solar Street Lights w/ Concrete Pedestral
15. Concreting of Road (Spanish Rd., New Buswang)
16. Concreting/Opening of Road (Mercedes, New Buswang)
17. Road Widening (Bayanihan Rd.,Pook)

Thank you for your attention and continued cooperation.