0% found this document useful (0 votes)
11 views1 page

GF Concept03 Model

The document appears to contain a detailed layout or blueprint, including various sections labeled with dimensions and materials. It includes references to storage bins, offices, workshops, and control areas, along with specific weight and plot limits. The overall structure seems to be related to a facility or industrial site with multiple functional areas.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views1 page

GF Concept03 Model

The document appears to contain a detailed layout or blueprint, including various sections labeled with dimensions and materials. It includes references to storage bins, offices, workshops, and control areas, along with specific weight and plot limits. The overall structure seems to be related to a facility or industrial site with multiple functional areas.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

it

it
l im
PLOT LIMIT - 9000 lim
t

ot
350
400 350 350 350 350 350
o
pl
22.5 350 350 22.5 350 350 350 22.5 350 350 350 22.5 350 350 350 22.5 350 350 350 22.5 350 22.5 350 350 22.5 350

pl

100
350
350
1200 WEIGHT
7760 BRIDGE

MATERIAL

720
950
350

900
STORAGE BINS

350

77.5
350
350
CONTROL

260
22.5
OFFICE DRIVERS SECURITY

425
380

380
ROOM ROOM
350
350

TOIL. 300 300

MATERIAL
950
TRUCK

229
400
STORAGE BINS
WASHING
350

1000

300
1200

70°

70°

400
350

AREA

350
1000
22.5

FILTER FLANGE

°
70

400
350

MATERIAL

350
950

STORAGE BINS 1000

22.5
350

400

350
1200
1000
350

400

350

PLOT LIMIT - 7302


22.5

UNDER GROUND 1000


MATERIAL CONTROL
950

ICE PLANT WATER TANK


350
PLOT LIMIT - 7759

STORAGE BINS ROOM

350
400

22.5
1000
1200
350

350
400
1000
350

350
22.5

400
MATERIAL
950

STORAGE BINS
350

1000

350
EGNALF RETLIF

7
°0
1200

400

22.5
350

1000

°07

350
°07

400
350

350
MATERIAL
950

1000
22.5

STORAGE BINS

400
350

350
1200
1000
350

MATERIAL
950

935
01 02 03 04 05 06 07 08 09 10 11
350

STORAGE BINS
22.5

5191
600 600 600 600 600 600 600 280 345 366

1200
350

A A
100
500 585 585
300 TOIL. 246 300

OFFICE
PANTRY

330

353
OFFICE RECEPTION

363
2559
350

UNDER GROUND

523

523
545

630
RCC HOLDING
TANK STORAGE

WASTE RECLAIMER
22.5

OFFICE
LAB
1000

1000

1000

1000

1000

1000

1000

1000
A'

985
980

980
330
MATERIAL AREA

im 22
B B

it
350

PLOT LIMIT -
165

165
WORKSHOP 1 WORKSHOP 2 WORKSHOP 3 WORKSHOP 4 WORKSHOP 5

itPLOT LIMIT -

tl
STAIR
C 366 C

o
pl
457
OFFICE
270

270
250
LIFT
231.5

600 600 600 600 590

220
205

205
ELEC.RM TEL.RM
250
285 285
D D
it

im
lim

350 350 350 22.5 350 350 350 22.5 350 350 316.5

tl
PLOT LIMIT - 8634

o
ot

pl
pl

600 600 600 600 600 600 600 280 345 366

You might also like