0% found this document useful (0 votes)
23 views1 page

Wela

The document lists various cost items related to a project, including Study & Design, General Item, Head Work, Infrastructure, Electromechanical, and Pipe & Pipe fitting. Each item is associated with its cost without VAT. The details suggest a breakdown of expenses for budgeting or financial planning purposes.

Uploaded by

yitab17
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views1 page

Wela

The document lists various cost items related to a project, including Study & Design, General Item, Head Work, Infrastructure, Electromechanical, and Pipe & Pipe fitting. Each item is associated with its cost without VAT. The details suggest a breakdown of expenses for budgeting or financial planning purposes.

Uploaded by

yitab17
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Cost Item Cost Without Vat

Study & Design


General Item
Head Work
Infrastractere
Electromechanical
Pipe & Pipe fiting

You might also like