This document is a Request for Inspection (RFI) related to the Surat Metro Rail Project, specifically for the design and installation of ballastless track. It outlines various inspection items and activities required for the project, including site clearance, utility diversion, and track parameter checks. The document also includes sections for scheduling, signatures, and comments from representatives of the contractor and client.

Uploaded by

Bishakto Manus
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views3 pages

1.rfi Dahisar Bhayandar

This document is a Request for Inspection (RFI) related to the Surat Metro Rail Project, specifically for the design and installation of ballastless track. It outlines various inspection items and activities required for the project, including site clearance, utility diversion, and track parameter checks. The document also includes sections for scheduling, signatures, and comments from representatives of the contractor and client.

Uploaded by

Bishakto Manus
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Request for Inspection

Project: Design, Supply, Installation, Testing and Commissioning of Ballastless Track from Bhesan to Saroli in
Job: Elevated Section Including Connecting Lines to Depot along with Ballasted / Ballastless / Embedded Standard
Gauge Track For Corridor-II, Surat Metro Rail Project, Phase 1.

Client: GUJARAT METRO RAIL CORPORATION LIMITED


Contractor: Rahee Infratech Ltd
RFI No: GMRC/RIL/SURAT/TRACK-2/RFI/ Date:
Inspection requested for item ( Tick the items/specify in the blank)

Site Clearance &


BLT Plinth Grouting Activity FBW/ATW
Handover

Utility Diversion Form Work Fastening Components/P.Way Lab/Test/Mix design

Survey Rebar Work Third Rail Pedestal USFD Test

Drainage Concreting Work Track Parameter (initial) Final Track Parameter

Handling,
Shear Connector Cutting Track Parameter (final) Turn Out
Transportation, Lifting

Rear work Rails Drilling & Cutting Cable Duct Repair Work

Rail Painting Supply Material Inspection Batching Plant Calibration Fouling Marks

Ballasted Track
Ballast Packing DeStressing Activity Embedded Track Work
Installations

Chainage (in m):


Location:

……………………………………………………………………………………………………………………………………………
Work Description: ……………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………….

Programme/Inspection
Date: Time:
Schedule:

Requested By: Received By:

Date & Time : Date & Time :

Comments by GC/GMRCL (if any):

RFI Closed By:


Signature RIL Representative GC/GMRCL Representative: