Bill 2.2 - Standby Genset System: DATE: 24-Jul-25 Progressive Claim No.2

The document outlines the proposed internal renovation and cleanroom fit-up for SOP Research Services Sdn at a specific location in Kuching, Sarawak, detailing the second progressive claim for the standby genset system. It includes a breakdown of items, descriptions, total prices, and work completion percentages for various components of the low voltage system installation. The total claim amount for Bill 2.2 is RM 147,790.00, with RM 39,798.00 already accomplished.

Uploaded by

cRi Society
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views2 pages

Bill 2.2 - Standby Genset System: DATE: 24-Jul-25 Progressive Claim No.2

The document outlines the proposed internal renovation and cleanroom fit-up for SOP Research Services Sdn at a specific location in Kuching, Sarawak, detailing the second progressive claim for the standby genset system. It includes a breakdown of items, descriptions, total prices, and work completion percentages for various components of the low voltage system installation. The total claim amount for Bill 2.2 is RM 147,790.00, with RM 39,798.00 already accomplished.

Uploaded by

cRi Society
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

PROPOSED INTERNAL RENOVATION AND CLEANROOM FIT-UP TO EXISTING BUILDING ON LOT 2196, SECTION 66,

PENDING INDUSTRIAL ESTATE, K.T.L.D, JALAN TENAGA, KUCHING, SARAWAK FOR SOP RESEARCH SERVICES SDN.
DATE: 24-Jul-25
PROGRESSIVE CLAIM NO.2

BILL 2.2 – STANDBY GENSET SYSTEM

Item Description T. Price (MYR) AMOUNT


WORK DONE CLAIM
ACCOMPLISHMENT (RM)

Previous Current To Date Previous


(%) (%) (%) (RM)

LOW VOLTAGE SYSTEM INSTALLATION

1 Supply and Installation shall not be limited to of the following


Essential Supply System as per tender drawings &
specifications :-

a) One (1) complete no 150 KVA generator set c/w shall not 66,330.00 0% 60% 60% 39,798.00
limited to the following major equipment:-
- A complete alternator set
- Radiator c/w necessary coolant
- All necessary engine instruments and all associated
accessories
- Complete spring isolator for engine support and all
necessary associated accessories for the complete
installation.
- All necessary, control equipment, all mounting accessories
and all the necessary associated accessories for the
complete installation.

b) One (1) complete generator AMF board c/w but shall not 16,130.00 0% 0% 0% -
limited to the following major equipment:-
- ACB, contactors and all the necessary protection/ isolation
devices.
- Earth Fault & Over Current protection relay and all the
necessar protection relays.
- All necessary alarm sensing signal to all the lift control
panel, fire alarm panel, under voltage relay and other control
panel.
- KWH meter, Hour running meter, Power factor meter,
Voltmeter and Ammeter c/w selector switch, Frequency
meter and all necessary measuring devices.

c) Storage fuel tanks c/w but shall not limited to the following 26,540.00 0% 0% 0% -
major equipment:-
- One (1) complete mild steel storage fuel tanks with min. 8
hours continuous running capacity c/w fuel strainer drain
pan, bund wall.
- One (1) no of motor fuel pump to pump diesel into the
storage tank from diesel tank or barrel.
- Fuel level indicators, sensor, sensing cables & accessories
and all the necessary devices and accessories.
- The complete Schedule 40 piping system c/w synthetic
rubber hose check valve, shut off valve with pad lock
provision, etc for the complete installation.

Balance C/F (RM): 109,000.00 39,798.00

Page 1 of 2
PROPOSED INTERNAL RENOVATION AND CLEANROOM FIT-UP TO EXISTING BUILDING ON LOT 2196, SECTION 66,
PENDING INDUSTRIAL ESTATE, K.T.L.D, JALAN TENAGA, KUCHING, SARAWAK FOR SOP RESEARCH SERVICES SDN.
DATE: 24-Jul-25
PROGRESSIVE CLAIM NO.2

BILL 2.2 – STANDBY GENSET SYSTEM

Item Description T. Price (MYR) AMOUNT


WORK DONE CLAIM
ACCOMPLISHMENT (RM)

Balance B/F (RM): 109,000.00 39,798.00

d) Acoustic doors for the generator room.

e) Acoustic air intake silencer and louvers for the generator


room.
16,330.00 0% 0% 0% -
f) Acoustic air exhaust silencer and louvres system for radiator
for the generator room.

g) Primary and secondary exhaust pipe extended outside the


building c/w insulation and mounting accessories.

h) Flexi FR MI cables (between alternators & AMF), control 6,130.00 0% 0% 0% -


cables inclusive of all accessories.

One (1) complete fill of diesel for full tank before handing 2,050.00 0% 0% 0% -
i)
over.

To provide all the necessary Fire Stop to specification and 2,050.00 0% 0% 0% -


j)
Bomba requirements.

Complete earthing system c/w but shall not limited to the 2,050.00 0% 0% 0% -
k)
following major equipment:-
a) Earth continuity conductors, earthing lead, earth
electrodes, earthing rods, pits and all other associated
accessories for switchgears, etc. for complete installation to
TNB, Suruhanjaya Tenaga requirements and IEE regulations.

b) Earthing including Frame and Neutral PVC copper cable


and neutral PVC copper tape from the following equipment to
the earth bars c/w all the necessary accessories for the
complete installation for Generator Set

Testing and Commissioning of the entire Essential Supply 2,000.00 0% 0% 0% -


l) System to relevant standards, specifications, Authority
requirements and to the satisfaction of S.O.

Items not included in the above but shown in the drawings


m) or specification or necessary for the successful completion
and efficient operation of the installation (tenderer to list)

a. 24V Nickel Cadmium Battery (20AH) 6,130.00 0% 0% 0% -

b. Concrete plinth for the genset, including excavation, 2,050.00 0% 0% 0% -


formwork, reinforcement, and pouring of concrete

C. _________________________________

39,798.00
Total Bill 2.2 (RM) 147,790.00