Bandivandlapalli
Bandivandlapalli
Recoveries
IT 1% - No. of the bill: Final Bill PRT
GST TDS 2% -
Seigniorage chargess -
NAC No. of date of his last bill
SEIGNIORAGE for the work:
FSD
Pscharges
Water & Curent charges
Net payable 7,35,000 Reference to Agreement:
a) Footings
Cum 1.81 1278 17 8590.00 15,547.90
b) Plinth Beam
Cum 1.62 1278 17 10839.00 17,559.18
c)Coloumns
Cum 0.28 1278 17 11113.00 3,111.64
d) Roof Beam
Cum 1.35 1278 32 10717.00 14,467.95
e) Roof slab 115 mm thick
Smt 27.90 1278 33 1237.10 34,515.09
f) Bell Type Sunshade
Smt 22.30 1278 33 1206.00 26,893.80
Page 2 of 14
Amount
Sl., Upto date
unit Quantity Items of work Rate Remarks
No. previous
Bill Since last bill
Providing HYSD steel bars (Fe 415 grade as per IS
1786-1979) of different diameters for cutting ,bending to
required sizes and shapes, placing in position with
cover blocks of approved size and binding wire of 20
SWG, forming grills for reinforcement work as per
approved designs and drawings, including cost and
conveyance of bars from approved source to site of work
including cost and conveyance of binding wire, cover
blocks and all incidental, operational, labour charges
such as cutting, bending, placing in position, tying
including sales and other taxes on all materials etc.,
complete for finished item of work
a) Up to roof level
SMT 37.18 1278 34 9362.00 34,807.90
10 Sqm.
Smt 32.35 1278 35 3086.00 9,983.20 0 0
Plastering to even surface of walls with 20mm thick in
single coat in CM (1:5) finished smooth including cost
and conveyance of all materials to site, Cost of all
materials, all taxes, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including
cutting grooves where ever necessary etc., complete for
finished item of work. (As per SS 903.) per 10 Sqm.
Page 3 of 14
Recoveries
Ps charges Rs. -
The measurements were taken by Sri K.Ravi Teja, AE, Srivani trust,
Annamayya Dist and recorded in page no's 29-36 of M.Book No':1278
1
1.00 1197.30
cum., 968.00 1158986.4 1158986.40
914.13 968.00 884877.84 884877.84
Earthwork excavation in
hard desintigrated rock or
soft rock requiring blasting
and convey the debris to al
ead of 8 KM out skirts of the
city including all labour
charges etc., complete
2
1.00 1380.31 216.10
cum., 298284.99 298284.99
b) First Floor
1.00 115.770 MB page 7302.40 845398.85 845398.85
cum.,
d)Third Floor
MB page
112.230 782 17,41,55 7581.00 850815.63 850815.63 0.00
e)Fourth Floor
MB page
99.280 7785.40 772934.51 772934.51
19.090 782 66 148623.29 148623.29
e) Fifth Floor
MB page
88.750 782 89 7879.80 699332.25 0.00 699332.25
Roof Beams
a) Ground Floor
1.00 181.350 MB Page 8088.40
cum., 1466831.34 1466831.34
b) First Floor
1.00 174.860 MB Page 8088.40
cum., 1414337.62 1414337.62
c) Second Floor
1.00 187.210 MB Page 8203.20
cum., 1535721.07 1535721.07
d)Third Floor
1.00 158.910 MB Page 8367.00
cum., 1329599.97 1329599.97
7.250 782 65,86 60660.75 0.00 60660.75
d) Fourth Floor
1.00 158.600 MB Page 8571.40
cum., 1359424.04 0.00 1359424.04
782 71
b) First Floor
1.00 1624.190 MB Page 10845.60
sqmt.,
1761531.51 1761531.51
c) Second Floor
MB Page
1.00 1802.510 11017.80
sqmt.,
1985969.47 1985969.47 0.00
d)Third Floor
MB Page
1.00 1620.400 11263.50
sqmt.,
1825137.54 1825137.54
53.120 782 65,87 59831.71 59831.71
d)Fourth Floor
MB Page
1.00 1595.560 782 72 11570.10
sqmt.,
1846078.88 1846078.88
c) Third Floor
MB Page
1.00 65.090 12982.10
sqmt.,
84500.49 84546.05 -45.56
c) Fourth Floor
MB Page
Lintels
a) First Floor
1.00 5.520 MB Page 5940.40
cum., 32791.01 0.00 32791.01
782 78
b) Second Floor
1.00 7.330 MB Page 6055.20
cum., 44384.62 0.00 44384.62
782 83
c) Third Floor
1.00 0.850 MB Page 6219.00
cum., 5286.15 0.00 5286.15
782 85
Bed Blocks
a) First Floor
1.00 1.100 MB Page 5940.40
cum., 6534.44 0.00 6534.44
782 75
b) Second Floor
1.00 1.400 MB Page 6055.20
cum., 8477.28 0.00 8477.28
782 79
c) Third Floor
1.00 1.920 MB Page 6219.00
cum., 11940.48 0.00 11940.48
782 85
a) Ground Floor
1.00 219.201 MB Page 5507.40 1207227.59 1207227.59
cum., 196.900 782, 92 5507.40 1084407.06 0.00 1084407.06
b) First Floor
1.00 17.780 5507.40
cum., 97921.57 97921.57
c) Second Floor
1.00 25.410 MB Page 5507.40
cum., 139943.03 139943.03
d) Third Floor
1.00 7.700 MB Page 5507.40 42406.98 42406.98
cum., 782 90
a) Ground Floor
1.00 7.620 MB PAGE 3014.60
cum., 22971.25 22971.25
19.000 849 3 57277.4 57277.40
a) First Floor
1.00 214.350 MB PAGE 3054.60
cum., 654753.51 0.00 654753.51
850 18
a) Second Floor
1.00 220.520 MB PAGE 3167.00
cum., 698386.84 0.00 698386.84
851 19
a) Third Floor
1.00 83.230 MB PAGE 3258.60
cum., 271213.28 0.00 271213.28
852 8
a) Ground Floor
1.00 51.260 1115.00
cum., 57154.90 57154.90
Plastering in CM (1:3)
12mm thick with dubara
sponge finishing, including
cost and conveyance of all
materials like cement, sand,
water etc., to site, and all
operational, incidental
charges on materials and all
labour charges, for mixing
mortar, finishing,
scaffoldlding, lift charges,
curing, including etc.,
complete.
a) Ground Floor
1.00 2003.860 1013.60 203111.25 203111.25
sqmt.,
b) First Floor
1.00 2024.710 1073.00 217251.38 217251.38
sqmt.,
c) Second Floor
1.00 2369.680 MB PAGE 1128.20 267347.30 267347.30
sqmt.,
729 28
d) Third Floor
1.00 2372.340 MB PAGE 1186.20 281406.97 281406.97
sqmt.,
729 36
a) Ground Floor
1.00 948.970 38.10 36155.76 36155.76
rmt.,
b) First Floor
1.00 935.250 38.10 35633.03 35633.03
rmt.,
c) Second Floor
MB PAGE
995.200 735 18 38.10 37917.12 37917.12 0.00
d) Third Floor
MB PAGE
1313.650 735 24 38.10 50050.065 50050.07 0.00
e) Fourth Floor
MB PAGE
1312.500 735 30 38.10 50006.25 0.00 50006.25
a) Ground Floor
1.00 9.000 50.00 450.00 450.00
rmt.,
b) First Floor
1.00 7.000 50.00 350.00 350.00
rmt.,
c) Second Floor
MB PAGE
1.00 7.000 735 19 50.00 350 350.00 0.00
rmt.,
d) Third Floor
MB PAGE
1.00 7.000 735 25 50.00 350 350.00 0.00
rmt.,
e) Fourth Floor
MB PAGE
1.00 7.000 735 31 50.00 350 0.00 350.00
rmt.,
d) Third Floor
MB PAGE
1.00 52.000 735 25 150.00 7800 7800.00 0.00
No.,
e) Fourth Floor
MB PAGE
1.00 54.000 735 31 150.00 8100 0.00 8100.00
No.,