1 1
42" 42"
1'-6" 10" 1 5" 10" 5"
10" 5" 1 10" 1'-6"
4'-3" 3' 5' 4'-92" 2'-6" 1' 1' 2'-6" 4'-92" 5' 3' 4'-3"
1'-6" W1 H/W H/W W1 1'-6"
10" 10"
1'-4" V 1'-6" 1'-6" V 1'-4"
E E
R R
5' A W1 A 5'
M.Bed Room Toilet Toilet Bed Room W1 N
N
5'-0"x12'-8" 5'-0"x12'-8" 5" 5"
D 12'-2.5"x12'-8" 12'-2.5"x12'-8" D
1'-6" 2'-9" 40'-8" 4'-3"
A A
3'-10"X 3'-10"X
3' D4 D4 3'
12'-8" 12'-8"
2'-6" D4 D4 2'-6"
5" 5"
5"
1'-6"
B D2
10" 10"
D2 B' 1'-6"
5" 6" 6"
D3 D3 2'-6" 2'
6"
3'-6" 3'-6"
Dinning Room Kitchen 4'
W1 4'-6"
18'-3"x15'-0" 9'-3.5"x10'-1"
5' W1
Bed Room 5'
9'-3.5"x15'-0" 3' 2'-6"
6" 1 1 6"
2'-4" 1'-6" 9'-32" 3'-6" 11'-3" 3'-6" 9'-32" 3'-10"
Toilet 2'-6" 2'
4'-7" H/W 4'-7" 6"
9'-3.5"x4'-6"
5" D4 5"
5" D3 D3 5" 4' 4'-6"
2' D1 2'
2'-6" V D4 2'-6" D4 V 2'-6"
E E 3" B F S
1'-9" R R
1'-9" 3' 11" Sand filling 3" C C
1" Floor 2'-6"
A 6"
A Finishing
N W1 N 1'-6"
D Bed Room Drawing Room W1 D 1'-3"
2'-9"
5' A 14'-5"x12'-8" 10" 14'-5"x12'-8" A 5'
1'-8"
10"
3'-10"X 3'-10"X
2'-1"
3"
10" 6"
3"
12'-8" 12'-8" 2'-6" 2'-6"
3' 2'-3" 3'
5" 5"
5" 5"
1'-6" W1 W1 1'-6"
10"
Section B-B'
3'-6" Porch Parapet Line 3'-6" Name: Md Towfiqul Huda Tasin
Dept:WRE
1'-6" 3'-10" 3' 5' 5'-7" 8' 5'-7" 5' 3' 3'-10" 1'-6"
5" 10" 10" 10" 10" 5" Id:2316013