0% found this document useful (0 votes)
9 views1 page

4th FLR

The document outlines the layout of a training room, including details on wall and floor finishes, wall types, and various functional areas such as stairs, a common toilet, and a roof deck area. It appears to be a visual representation or plan for a specific space. The document is structured with numbered sections indicating different components of the room.

Uploaded by

Arny De Pedro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views1 page

4th FLR

The document outlines the layout of a training room, including details on wall and floor finishes, wall types, and various functional areas such as stairs, a common toilet, and a roof deck area. It appears to be a visual representation or plan for a specific space. The document is structured with numbered sections indicating different components of the room.

Uploaded by

Arny De Pedro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

OPEN

BELOW

TRAINING ROOM
WALL AND FLOOR FINISHES:

ROOM NAME

WALL TYPES:

1 STAIRS

FUNCTION AREA
2

DUMB COMMON
TOILET
WAITER

1 2
1
1

ROOF DECK AREA


1

You might also like