The document outlines a General Work Permit for electrical panel, cable tray, and fire line installation works at the Vizag site, scheduled for 06 August 2025. It includes details on the work description, personnel involved, tools and equipment to be used, and safety risk assessments. The permit is currently live and requires a method statement, with no integrity test needed.

Uploaded by

vrathour95
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views3 pages

Download

The document outlines a General Work Permit for electrical panel, cable tray, and fire line installation works at the Vizag site, scheduled for 06 August 2025. It includes details on the work description, personnel involved, tools and equipment to be used, and safety risk assessments. The permit is currently live and requires a method statement, with no integrity test needed.

Uploaded by

vrathour95
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Type : General Work Permit

Number : 0-VIZ#705366

State : Live
Shift Validity : 06 Aug 08:55 - 06 Aug 18:00

Title: TS WH - Electrical panel/cable tray and fire line installation works

Work Description: panel installation works


installation of panels in low bay/highbay mezzanine floor in panel room
installation of DDC and LCS panels high bay and low bay areas
installation of hvac distribution board at high bay mezzanine floor

cable tray cable laying works


Drilling activity for Cable tray
Cabling & Cable tray preparation at ground floor area.
spray painting for the cable tray and earth strips at warehouse
conduiting cutting and threading

fire line works


Low bay area Fire fighting pipe assembling works,
segregation and erection of fire hydrant pipe lines in low bay area
pipe grooving and hole saw cutting activites

Permit Details

Site: Vizag

Company: Sterling & Wilson

Work Supervisor:
Naveen kumar/dinesh kumar

EHS:
sandeep
santosh
ananta kumar

Boom Lift Operator: Nitesh Kumar,/Chandan kumar

flagman: sriram

cable tray team/mechanical


Fitter/ Grinder:
Naveen kumar
sunil paswan

Helper:
Jitendra kumar,
Anannd kumar,
Md,Suraj kumar,
Kisan mahto,
Pradeep,
Jithesh, Rakesh,
sandeep kumar,
Sunil paswan
Ramnayan sigh
Chandrabhan
Sree ram das

cable laying team


dalvir
jogendhar
manoj kumar
mukesh
Nandalal sharma
rajesh kumar
sukdev
sunil

rigger:
chandra bhanu

YMSCE-Bharat/Ramesh/Hari/Mahesh
Planned Start Date: 06 Aug 2025

Planned End Date: 06 Aug 2025

Location(s): TS WARE HOUSE EXPANSION AREA

Equipment: NA

0-VIZ#705366 08/06/2025 09:04 Page 1 of 3


Type : General Work Permit

Number : 0-VIZ#705366

State : Live
Shift Validity : 06 Aug 08:55 - 06 Aug 18:00

Tools/Equipment to be used: Signal Flags


Web slings 3Ton 6Mtr Due date:09-03-2026
Web slings 5Ton 5Mtr Due date:09-03-2026
Web slings 5Ton 5Mtr Due date:09-03-2026

Tag line ropes -2 No


Hand Tools
Spine Board Location: Expansion project area

chain block: 3 TON


validity: 28-01-2026

1. Drilling machine due date:25-08-2025


2. Drilling machine due date:26-08-2025

grooving machine
due date: 01-09-2025

hole saw cutting machine


due date; 1-09-2025
Number of Persons: 10

Work Order: CCF-8514411

Lead Discipline: Electrical

Integrity Test Required: No

Method Statement Required: Yes

Required Documents: Other

LOTO Requirement: No

Permit Requester Contact sagar bandaru


Details: 9396669393
Permit Authoriser Contact 9063688628
Details:
Person Responsible for Worksite Permit Issuer
Inspection:

Integrity Test Table

Equipment Tag (PR) Integrity Test Equipment has been If unable to complete Integrity Test has Comments
required? (PR) secured and double Integrity Test, been performed and
checked after task Equipment must be passed (PAc or PI)
completed (PAc) identified in the field
"For Test" (PAc)

Attached Certificates

Signature History
Signature Signee Date Company: Remarks

Accept by Permit Accepter Sagar Bandaru 06 Aug 2025 09:01 YMSCE


Sudheer Devireddy Sudheer
Issue by Permit Issuer 06 Aug 2025 08:55 Pfizer
Devireddy
Sudheer Devireddy Sudheer
Authorise by Permit Authoriser 06 Aug 2025 08:55 Pfizer
Devireddy
Request by Permit Requester Sagar Bandaru 06 Aug 2025 08:29 YMSCE

0-VIZ#705366 08/06/2025 09:04 Page 2 of 3


Type : General Work Permit

Number : 0-VIZ#705366

State : Live
Shift Validity : 06 Aug 08:55 - 06 Aug 18:00

Risk Assessments

Risk Assessment Level RA

Hazard (Group) Control Measure Prereq.

General Access (ACCESS) Construction Helmet, Safety Footwear, Hi- Visibility vest, Safety No
Glasses, Long sleves/armlets, and Gloves cut level 3 to be worn
No access to restricted rooms/areas unless specified in the permit No
description.
Using hand tools (EQUIPMENT) All non Ex-rated and non-certified electrical tools to be inspected by No
competent Electrical person.
Kevlar gloves to be worn when using knives No

Non spark tools must be used in designated areas. No

Only insulated tools to be used in designated areas. No

Well designed and maintained power tools, with low vibration No


characteristics shall be used.
Lift Planning (Cranes) (MOVING LOADS) A Spotter* controls the load during transfer and ensures persons are No
not in direct line of the suspended load. Spotters must be identified
with orange printed vest / jacket.
A competent Rigger is required to rig load safely. No

All crane operators are trained and qualified to operate the lifting No
equipment.
All lifting appliances (shackles/slings/chains/lifting devices) certified No
for use and certification reviewed before commencing lifting activity.
All lifting machinery certified for use and certification reviewed before No
commencing lifting activity.
In addition to visual controls, 2-way radio communication is required No
for all lifts
Lift plan in place for the proposed lift, approved and reviewed by all No
involved.
Lifting over live / occupied areas should only be done as a last resort No
and should be subjected to a detailed risk assessment.
Transporting - Securing /Unloading All loads must be secured to the vehicle when transporting. No
(MOVING LOADS)
All suspended loads need to be attached by a trained rigger. A tagline No
must be used to control / guide movement of the load
When unloading from a trailer the rigger must be protected from No
potential falls from height.
Manual Transport. (MOVING LOADS) Any load over 2m in length must be carried by minimum of 2 people. No

Operatives must be trained in good manual handling practice. No

Where possible avoid manual lifting of loads. No

0-VIZ#705366 08/06/2025 09:04 Page 3 of 3