Work Plan

The document lists the method statements for various activities related to the STT MAA20 project by Crescon Projects & Services Pvt Ltd. It includes categories for Civil, HVAC, and Electrical works, detailing specific tasks such as concrete block works, HVAC installations, and electrical wiring. Each activity is associated with a submission date and approval status, indicating a structured approach to project management.

Uploaded by

Vikram
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views2 pages

Work Plan

The document lists the method statements for various activities related to the STT MAA20 project by Crescon Projects & Services Pvt Ltd. It includes categories for Civil, HVAC, and Electrical works, detailing specific tasks such as concrete block works, HVAC installations, and electrical wiring. Each activity is associated with a submission date and approval status, indicating a structured approach to project management.

Uploaded by

Vikram
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

CRESCON PROJECTS & SERVICES PVT LTD

LIST OF METHOD STATEMENT - STT MAA20 PROJECT

swms HIRA DATE OF APPROVED


S.No Activity SUBMISSION

Civil
1 Concrete Block works & slapwork
2 Painting works
3 Plastering work
4 gypsum partitions & puff panel partitions
5 plumbing works
6 False ceiling work
7 Frames & door installations
8 Epoxy work
9 False floor work
10 Excavation work
11 Civil foundations work

HVAC
1 Underdeck Insulation
Chilled Water Pipe Fabrication, Erection, Painting
2
and Installation
3 CRAH & CSU and VRF units Installation
4 Installation of Ventilation fans
5 Copper piping work
6 Duct installation with Grills & Diffusers
7 Chilled water pumps installation

8 Chiller& Pumps Testing and Commissioning

9 CRAH & CSU and VRF units Commissioning

ELECTRICAL
1 Jika Ceiling work
2 Conduits installation work
3 Cable tray and support installation work
4 Earthing work
5 Cable laying-PDB A& SOCKETS
6 DB installation
7 Wiring work
8 Switch sockets fixing work
9 Cable termination work
10 UPS- Panel and Rack assembly Work
11 Battery installation work
12 LT & HT Panels installation work
13 Busduct & Connections work
14 Light fixing work
15 Transformer installation
16 Cable laying work
18 DG-Installation work
19 Accoustic insulation works
22 HSD tank installation
23 Street light poles installation work