PRESENTED BY:
SULTANTO HERMAWAN PUTRA
ELECTRICAL
CALCULATIONS
PART OF: ELECTRICAL
ENGINEERING IN OIL & GAS:
DESIGN, CALCULATIONS, AND
MATERIAL PLANNING
SULTANTO HERMAWAN
PUTRA
EDUCATION
Bachelor of Electrical Engineering, Sepuluh Nopember Institute of Technology (2015-2020)
Master of Technology Management, Sepuluh Nopember Institute of Technology (2023-Now)
WORK EXPERIENCE
1 years at PT. Forisa Nusapersada as a Management Trainee
2 years at PT. Meindo Elang Indah as a Electrical Engineer
2 years at PT. Tri Panji Puring as a Electrical Engineer
Currently at PT. Tripatra Engineering as a Electrical Engineer
SULTANTO HERMAWAN
PUTRA
PROJECT EXPERIENCE
EPCI of South Sembakung Gas Development - JOB Pertamina - Medco E&P Simenggaris
EPCI of Wellhead Platforms and Pipeline for Forel-Bronang Project - Medco E&P Natuna
EPCI of Wellhead Platforms and Pipeline for West Belut Project - Medco E&P Natuna
FEED of Peciko 8C LLP Compressor Project - Pertamina Hulu Mahakam
FEED of OPL MRA - Pertamina Hulu Energi ONWJ
FEED of PRP ESA-EPRO - Pertamina Hulu Energi ONWJ
FEED of UWJ-B1C - Pertamina Hulu Energi ONWJ
FEED of ZULU INFILL Phase 3 - Pertamina Hulu Energi ONWJ
REVAMP AMONIA PLANT 2 - Pupuk Kaltim
SOFTWARE                                 CONTACT
ETAP
Digsilent                                       Sultanto Hermawan Putra
Dialux
PVsyst                                          sultantohp
OUTLINE
 Load List Calculations
 Cable Sizing & Voltage Drop
 Calculations
 Earthing Calculations
LOAD LIST
CALCULATION
PURPOSE
     Untuk menentukan beban yang termasuk ke dalam beban continuous, intermittent dan
     standby
     Untuk mengetahui total kebutuhan beban
     Sebagai dasar untuk memilih rating dari peralatan (busbar, generator, transformer, etc.)
INPUT DATA
  ELECTRICAL        Lighting Transformer
                                                            Lighting Calculation
     LOAD           Lighting
NON ELECTRICAL      Electrical Motor -> Mechanical
     LOAD           Instrument Load
DEFINITIONS AND FORMULAS
DEFINITIONS AND FORMULAS
DEFINITIONS AND FORMULAS
DEFINITIONS AND FORMULAS
DEFINITIONS AND FORMULAS
LOAD LIST
CALCULATION
(SIMULATION)
ELECTRICAL OVERVIEW
 Sumber pembangkitan berasal dari 2 Gas Turbine Generator (Size: Tentukan), dengan 1
 sebagai main power supply dan 1 sebagai backup power supply
 2 Gas Turbine Generator dihubungkan ke 6.6 kV MV Switchgear yang dilengkapi dengan
 sistem ATS
 Terdapat 2 beban motor MV yang dihubungkan ke 6.6 kV MV Switchgear
 Terdapat 1 Transformer (Size: Tentukan) untuk menurunkan tegangan dari 6.6 kV ke 0.4 kV
 menuju 400V LV Switchgear
 Dibutuhkan 1 Diesel Engine Generator (DEG) (Size: Tentukan) yang dihubungkan pada 400 LV
 Switchgear
 400 LV Switchgear digunakan untuk mensupply beban-beban LV seperti motor, lighting
 system, HVAC system, control panel dan UPS load
 Beban dibedakan menjadi continuous, intermittent dan standby
 Beban dibedakan menjadi normal load dan critical load, beban critical adalah beban yang
 tidak boleh mati ketika kondisi normal dan emergency
     BEBAN MV                                    Keterangan:
                                                 Type ; F (Feeder); M (Motor)
                                                 Duty : C (Continuous), I (Intermittent), S (Standby)
                                                 Load : N (Normal), C (Critical)
                                         Load    Phas     Voltag        Power         Power        Efficie
No    Equipment    Duty   Type   Load
                                        Factor    e         e            (kW)         Factor        ncy
1     Compressor    C      M      N     0.95      3       6600 V          500          0.85         0.95
2       Crane       I      M      N     0.80      3       6600 V          350          0.85             0.93
     BEBAN LV                                         Keterangan:
                                                      Type ; F (Feeder); M (Motor)
                                                      Duty : C (Continuous), I (Intermittent), S (Standby)
                                                      Load : N (Normal), C (Critical)
                                              Load    Phas     Voltag        Power         Power        Efficie
No      Equipment       Duty   Type   Load
                                             Factor    e         e            (kW)         Factor        ncy
1     Lighting System    C      F      C     0.95      3        400 V          200          0.85         0.90
2      HVAC System       C      F      N     0.80      3        400 V          150          0.85         0.90
3      Control Panel     C      F      C     0.90      3        400 V          100          0.85         0.90
4     Fire Water Pump    S      M      C     0.88      3        400 V          80           0.85         0.90
5      Water Pump        I      M      N     0.90      3        400 V           55          0.85         0.90
6      Oil Mist Pump     C      M      N     0.92      3        400 V           75          0.85         0.90
7          UPS           C      F      C     0.88      3        400 V           40          0.85         0.90
LET'S
TAKE A
BREAK
CABLE SIZING
& VOLTAGE
DROP
CALCULATION
PURPOSE
 Untuk menentukan rating kabel (size, jumlah tarikan, etc.)
 Untuk mengetahui voltage drop pada saluran
INPUT DATA
 Load List Calculation
 Cable Data
 Cable Condition (installation, temperature, soil resistivity, etc.)
 Layout/Plot Plan
 Allowable Cable Voltage Drop (from Specification)
DESIGN REQUIREMENT
DERATING FACTOR
DESIGN REQUIREMENT
DERATING FACTOR
   Depend on project specification, usually 1.1-1.2 times
DESIGN REQUIREMENT
DERATING FACTOR
DESIGN REQUIREMENT
DERATING FACTOR
DESIGN REQUIREMENT
DERATING FACTOR
DESIGN REQUIREMENT
CONTINUOUS CURRENT CARRING CAPACITY
 Generator               Motor/Feeder   Transformer
DESIGN REQUIREMENT
   VOLTAGE DROP CALCULATION
DESIGN REQUIREMENT
   VOLTAGE DROP CALCULATION
DESIGN REQUIREMENT
   VOLTAGE DROP CALCULATION
CABLE SIZING
& VOLTAGE
DROP
CALCULATION
(SIMULATION)
CABLE INSTALLATION
   Margin untuk future = 110%
   Fireproofing material = No
   Seluruh kabel diinstal di Ladder/Tray
   Kabel konstruksi = Cu/XLPE/GSFA/PVC
   Ambient temperature = 40 Celcius
   Jumlah kabel per tray/ladder = 4
   Jumlah maksimal tray = 2 tingkat
Fa = 0.9
Ff = 1
Ft = 0.91
Fth = 1
Fg = 0.78
F = 0.63
VOLTAGE DROP CRITERIA