Rimon Vai Civil Boq

The document outlines a Bill of Quantity (BOQ) for civil construction work, detailing various items, quantities, units, prices, and total amounts. The total amount for all listed works sums up to 1,142,685.0. Key items include earthwork, concrete works, brick works, and finishing tasks.

Uploaded by

ietbd.office
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views1 page

Rimon Vai Civil Boq

The document outlines a Bill of Quantity (BOQ) for civil construction work, detailing various items, quantities, units, prices, and total amounts. The total amount for all listed works sums up to 1,142,685.0. Key items include earthwork, concrete works, brick works, and finishing tasks.

Uploaded by

ietbd.office
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Civil Construction- Bill of Quantity (BOQ) with Price :

S.L Description of Item Qty. Unit Price Amount


01 Site Mobilization Work: L.T ----
02 Layout and Marking: 600.0 sft 5.0 3000.0
03 Earthwork in excavation: 1512.0 cft 15.50 23436.0
04 Side Earth filling: 504.0 cft 6.0 3024.0
05 Under Sand Filling: 300.0 cft 28.0 8400.0
06 One layer of brick flat soling: 600.0 sft 56.0 33600.0
07 Mass concrete work: 00.0 sft 95.0 0.0
08 Polythene sheet: 650.0 sft 4.5 2925.0
09 Reinforced Cement Concrete (RCC) Works: 1044.0 cft 225.0 234900.0
10 5” Brick works: 1320.0 sft 125.0 165000.0
11 Chemical/Admixture: 40.0 ltr 175.0 7000.0
12 Reinforcement Fabrication Work: 3700.0 Kg 92.0 340400.0
13 Cement Plaster works: 2640.0 sft 30.0 79200.0
14 Neat cement finishing: 350.0 sft 7.0 2450.0
15 Tiles Work: 755.0 sft 95.0 26425.0
16 Door Work (as per requirement): 7 Pcs 4000.0 28000.0
17 Weather coat & Inner Paint: 2650.0 sft 32.0 84800.0
18 Form Work /Shuttering work: 975.0 sft 35.0 92625.0
19 Scaffolding Work: 750.0 sft 10.0 7500.0
Amount = 1142685.0