Sun 8 KSG 04 LP 3
Sun 8 KSG 04 LP 3
Hybrid Inverter
SUN-8K-SG04LP3
SUN-10K-SG04LP3
SUN-12K-SG04LP3
User Manual
Contents
1. Safety Introductions 01
2. Product instructions 01-04
3. Installation 05-22
4. OPERATION 23
6. Mode 35-36
7. Limitation of Liability 36-40
8. Datasheet 41-42
9. Appendix I 43
10. Appendix II 44
About This Manual
The manual mainly describes the product informa�on, guidelines for installa�on, opera�on and
maintenance. The manual cannot include complete informa�on about the photovoltaic (PV)
system.
1. Safety Introduc�ons
· This chapter contains important safety and opera�ng instruc�ons. Read and keep this manual
for future reference.
· Before using the inverter, please read the instruc�ons and warning signs of the ba�ery and
corresponding sec�ons in the instruc�on manual.
· Do not disassemble the inverter. If you need maintenance or repair, take it to a professional
service center.
· Improper reassembly may result in electric shock or fire.
· To reduce risk of electric shock, disconnect all wires before a�emp�ng any maintenance or
cleaning. Turning off the unit will not reduce this risk.
· Cau�on: Only qualified personnel can install this device with ba�ery.
· Never charge a frozen ba�ery.
· For op�mum opera�on of this inverter, please follow required specifica�on to select appropriate
cable size. It is very important to correctly operate this inverter.
· Be very cau�ous when working with metal tools on or around ba�eries. Dropping a tool may
cause a spark or short circuit in ba�eries or other electrical parts, even cause an explosion.
· Please strictly follow installa�on procedure when you want to disconnect AC or DC terminals.
Please refer to "Installa�on" sec�on of this manual for the details.
· Grounding instruc�ons - this inverter should be connected to a permanent grounded wiring
system. Be sure to comply with local requirements and regula�on to install this inverter.
· Never cause AC output and DC input short circuited. Do not connect to the mains when DC
input short circuits.
2. Product Introduc�on
This is a mul�func�onal inverter, combining func�ons of inverter, solar charger and ba�ery
charger to offer uninterrup�ble power support with portable size. Its comprehensive LCD display
offers user configurable and easy accessible bu�on opera�on such as ba�ery charging, AC/solar
charging, and acceptable input voltage based on different applica�ons.
2.1 Product Overview
1
2
3
4 6
5 7
10
11
8
9
16
13
14
15
12
Inverter Size
Moun�ng bracket
2.3 Product Features
- 230V/400V Three phase Pure sine wave inverter.
- Self-consump�on and feed-in to the grid.
- Auto restart while AC is recovering.
- Programmable supply priority for ba�ery or grid.
- Programmable mul�ple opera�on modes: On grid, off grid and UPS.
- Configurable ba�ery charging current/voltage based on applica�ons by LCD se�ng.
- Configurable AC/Solar/Generator Charger priority by LCD se�ng.
- Compa�ble with mains voltage or generator power.
- Overload/over temperature/short circuit protec�on.
- Smart ba�ery charger design for op�mized ba�ery performance
- With limit func�on, prevent excess power overflow to the grid.
- Suppor�ng WIFI monitoring and build-in 2 strings for 1 MPP tracker, 1 string for 1 MPP tracker.
- Smart se�able three stages MPPT charging for op�mized ba�ery performance.
- Time of use func�on.
- Smart Load Func�on.
AC cable DC cable
WiFI
GPRS
CT
User
manual
Sensor Clamp
x3
3.2 Moun�ng instruc�ons
Installa�on Precau�on
This Hybrid inverter is designed for outdoor use(IP65), Please make sure the installa�on site
meets below condi�ons:
· Not in direct sunlight
· Not in areas where highly flammable materials are stored.
· Not in poten�al explosive areas.
· Not in the cool air directly.
· Not near the television Antenna or antenna cable.
· Not higher than al�tude of about 2000 meters above sea level.
· Not in environment of precipita�on or humidity(>95%)
Please AVOID direct sunlight, rain exposure, snow laying up during installa�on and
opera�on. Before connec�ng all wires, please take off the metal cover by removing
screws as shown below:
5 00mm
For proper air circula�on to dissipate heat, allow a clearance of approx. 50cm to the side and
approx. 50cm above and below the unit. And 100cm to the front.
Connec�ng the ba�ery with a suitable cable is important for safe and efficient
opera�on of the system. To reduce the risk of injury, refer to Chart 3-2 for
recommended cables.
3. In case of children touch or insects go into the inverter, Please make sure the inverter
connector is fasten to waterproof posi�on by twist it clockwise.
CN2:
G-start (1,2): dry contact signal for startup the
diesel generator.
When the "GEN signal" is ac�ve, the open contact
(GS) will switch on (no voltage output).
G-valve (3,4): reserved.
Grid_Ry(5,6): 230V output port when inverter is on
RSD (7,8): provide 12Vdc output when inverter is on.
3.3.3 Temperature sensor connec�on for lead-acid ba�ery
3.4 Grid connec�on and backup load connec�on
· Before connec�ng to grid, please install a separate AC breaker between inverter and grid. Also,
it is recommended that installs an AC breaker between backup load and inverter.This will ensure
the inverter can be securely disconnected during maintenance and fully protected from over
current.The recommended of AC breaker is 20A for 8kw, 20A for 10kw and 20A for 12KW.
· There are three terminal blocks with "Grid" "Load"and "GEN" markings. Please do not misconnect
input and output connectors.
Please follow below steps to implement Grid, load and Gen port connec�on:
1. Before making Grid, load and Gen port connec�on, be sure to turn off AC baeaker or
disconnector first.
2. Remove insula�on sleeve 10mm length, unscrew the bolts, insert the wires according to
polari�es indicated on the terminal block and �ghten the terminal screws. Make sure the
connec�on is complete.
PE
T(L3)
S(L2) GRID LOAD GEN PORT
N R(L1)
GRID
PE
T(L3) PE
S(L2) T(L3)
N R(L1) S(L2)
LOAD N R(L1) GEN PORT
Be sure that AC power source is disconnected before a�emp�ng to wire it to the
unit.
3. Then, insert AC output wires according to polari�es indicated on the terminal block and �ghten
terminal. Be sure to connect corresponding N wires and PE wires to related terminals as well.
4. Make sure the wires are securely connected.
5. Appliances such as air condi�oner are required at least 2-3 minutes to restart because it is
required to have enough �me to balance refrigerant gas inside of circuit. If a power shortage
occurs and recovers in short �me, it will cause damage to your connected appliances. To
prevent this kind of damage, please check manufacturer of air condi�oner if it is equipped with
�me-delay func�on before installa�on. Otherwise, this inverter will trigger overload fault and
cut off output to protect your appliance but some�mes it s�ll causes internal damage to the air
condi�oner
3.5 PV Connec�on
Before connec�ng to PV modules, please install a separately DC circuit breaker between
inverter and PV modules. It is very important for system safety and efficient opera�on to
use appropriate cable for PV module connec�on. To reduce risk of injury, please use the
proper recommended cable size as below.
8/10/12KW 12AWG 4
To avoid any malfunc�on, do not connect any PV modules with possible current
leakage to the inverter. For example, grounded PV modules will cause current
leakage to the inverter. When using PV modules, please be sure NO grounding.
Chart 3-5
Safety Hint:
Please don’t connect PV array posi�ve or nega�ve pole to the ground, it could
cause serious damages to the inverter.
Safety Hint:
Before connec�on, please make sure the polarity of the output voltage of PV
array matches the “DC+” and “DC-” symbols.
Safety Hint:
Before connec�ng inverter, please make sure the PV array open circuit voltage is
within the 1000V of the inverter.
Cross section
Cable type
Range Recommended value
Industry generic PV cable 4.0~6.0
4.0(12AWG)
(model: PV1-F) (12~10AWG)
Chart 3-6
c) Insert the contact pin to the top part of the connector and screw up the cap nut to the top
part of the connector. (as shown in picture 5.5).
Pic 3.5 connector with cap nut screwed on
d) Finally insert the DC connector into the posi�ve and nega�ve input of the inverter, shown as
picture 5.6
Warning:
Sunlight shines on the panel will generate voltage, high voltage in series may
cause danger to life. Therefore, before connec�ng the DC input line, the solar
panel needs to be blocked by the opaque material and the DC switch should
be 'OFF', otherwise, the high voltage of the inverter may lead to life-
threatening condi�ons.
3.6 CT Connec�on
Note:
When the inverter is in the off-grid state, the N line needs to be connected to the
earth.
BMS
N N
R R
S RCD S
Load
T T
Battery AC Breaker
PE or
DC Breaker
3.9 Wiring System for Inverter
Load
Hybrid Inverter
CT
N N
N
R R
CT1
R S S Grid
GEN S CT2
T T T
CT3
PORT
PE AC Breaker AC Breaker
AC Breaker PE
Grid
PE
N-BAR
RCD
E-N
Link
E-BAR E-BAR
N R S T PE
Home Loads
3.10 Wiring diagram
3.11 Typical applica�on diagram of diesel generator
EX_Meter For CT Meter Select EX_Meter For CT Meter Select EX_Meter For CT Meter Select
No Meter 0/3 No Meter 0/3 No Meter 0/3
4. OPERATION
4.1 Power ON/OFF
Once the unit has been properly installed and the ba�eries are connected well, simply press
On/Off bu�on(located on the le� side of the case) to turn on the unit. When system without
ba�ery connected, but connect with either PV or grid, and ON/OFF bu�on is switched off, LCD
will s�ll light up(Display will show OFF), In this condi�on, when switch on ON/OFF bu�on and
select NO ba�ery,system can s�ll working.
Up To go to previous selec�on
05/28/2019 15:34:40
0 8.30 12 0 -3.00 8
KW KW
ON
25%
0 -2.00
KW
8 0 3.00
KW
8
1.The icon in the center of the home screen indicates that the system is Normal opera�on. If it
turns into "comm./F01~F64" , it means the inverter has communica�on errors or other errors,
the error message will display under this icon(F01-F64 errors, detail error info can be viewed in
the System Alarms menu).
3.System Setup Icon, Press this set bu�on,you can enter into the system setup screen which
including Basic Setup, Ba�ery Setup, Grid Setup, System Work Mode, Generator port use,
Advanced func�on and Li-Ba� info.
4.The main screen showing the info including Solar, Grid, Load and Ba�ery. Its also displaying the
energy flow direc�on by arrow. When the power is approximate to high level, the color on the
panels will changing from green to red so system info showing vividly on the main screen.
Energy Press the “Energy “bu�on will enter into the power
curve page.
1166w
1244w
50Hz
-81w
50Hz
① This is Inverter detail page.
222v 0.8w 222v 0.1A ① Inverter Genera�on.
221v 0w 229v 5.0w 230v 0.1A
229v 1166w 229v 0.9w 223v 0.1A Voltage, Current, Power for each Phase.
225v 0w HM: LD: INV_P:
AC-T: mean Heat-sink temperature.
-10W 28W -30W
Load 5W 1192W -26W AC_T:
0W 24W -25W 38.8C
SOC:99%
-21w Grid Inverter
BAT_V:53.65V
DC_P1: 0W DC_P2: 0W
BAT_I: -0.41A DC_V1: 0V DC_V2: 0V
BAT_T: 27.0C DC_I1: 0.0A DC_I2: 0.0A
Battery PV1 PV2
Energy
U:49.58V
I:2.04A
Li-BMS
Power: 101W Volt Curr Temp SOC Energy Charge Fault
Volt Curr
1 50.38V 19.70A 30.6C 52.0% 26.0Ah 0.0V 0.0A 0|0|0
Temp:25.0C
Energy 2
3
4
50.33V
50.30V
0.00V
19.10A
16.90A
0.00A
31.0C
30.2C
0.0C
51.0%
12.0%
0.0%
25.5Ah
6.0Ah
0.0Ah
53.2V
53.2V
0.0V
25.0A
25.0A
0.0A
0|0|0
0|0|0
0|0|0
Sum
Data
5 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
6 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
7 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
8 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
This is Ba�ery detail page. 9 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
10 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0 Details
11 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0 Data
if you use Lithium Ba�ery, you can enter BMS page. 12 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
13 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
14 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
15 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
CANCEL Day Month Year Total CANCEL Day Month Year Total
CANCEL Day Month Year Total CANCEL Day Month Year Total
Solar power curve for daily, monthly, yearly and total can be roughly checked on the LCD, for more
accuracy power genera�on, pls check on the monitoring system. Click the up and down arrow to
check power curve of different period.
5.4 System Setup Menu
System Setup
This is System Setup page.
Basic Advanced
Setting Function Device Info.
Basic Setting
Factory Reset: Reset all parameters of the inverter.
Time Syncs Beep Auto Dim Lock out all changes: Enable this menu for se�ng
Year Month Day Basic parameters that require locking and cannot be set up.
2019 03 17
Set Before performing a successful factory reset and locking
the systems, to keep all changes you need to type in a
Hour Minute password to enable the se�ng.
24-Hour 09 15 The password for factory se�ngs is 9999 and for lock
out is 7777.
Factory Reset Lock out all changes
PassWord
Factory Reset PassWork: 9999
X--X--X--X DEL Lock out all changes PassWork: 7777
1 2 3
4 5 6
7 8 9
CANCEL 0 OK
5.6 Ba�ery Setup Menu
Battery Setting
Ba�ery capacity: it tells Deye hybrid inverter to know
Batt Mode your ba�ery bank size.
Lithium Batt Capacity 400Ah
Batt
Use Ba� V: Use Ba�ery Voltage for all the se�ngs (V).
Use Batt V Max A Charge 40A
Mode Use Ba� %: Use Ba�ery SOC for all the se�ngs (%).
Use Batt % Max A Discharge 40A Max. A charge/discharge: Max ba�ery charge/discharge
No Batt
current(0-115A for 5KW model, 0-90A for 3.6KW model).
Activate Battery
For AGM and Flooded, we recommend Ah ba�ery
size x 20%= Charge/Discharge amps.
. For Lithium, we recommend Ah ba�ery size x 50% =
Charge/Discharge amps.
. For Gel, follow manufacturer' s instruc�ons.
No Ba�: �ck this item if no ba�ery is connected to the system.
Ac�ve ba�ery: This feature will help recover a ba�ery that is over discharged by slowly charging from
the solar array or grid.
Zero Export To Load: Hybrid inverter will only provide power to the backup load connected. The hybrid
inverter will neither provide power to the home load nor sell power to grid. The built-in CT will detect
power flowing back to the grid and will reduce the power of the inverter only to supply the local load and
charge the ba�ery.
Battery
Zero Export To CT: Hybrid inverter will not only provide power to the backup load connected but also give
power to the home load connected. If PV power and ba�ery power is insufficient, it will take grid energy
as supplement. The hybrid inverter will not sell power to grid. In this mode, a CT is needed. The installa�on
method of the CT please refer to chapter 3.6 CT Connec�on. The external CT will detect power flowing back
to the grid and will reduce the power of the inverter only to supply the local load, charge ba�ery and home
load.
CT
Battery
Solar Sell: “Solar sell” is for Zero export to load or Zero export to CT: when this item is ac�ve, the surplus
energy can be sold back to grid. When it is ac�ve, PV Power source priority usage is as follows: load
consump�on and charge ba�ery and feed into grid.
Max. sell power: Allowed the maximum output power to flow to grid
Zero-export Power: for zero-export mode, it tells the grid output power. Recommend to set it as 20-100W
to ensure the hybrid inverter won' t feed power to grid.
Energy Pa�ern: PV Power source priority.
Ba� First: PV power is firstly used to charge the ba�ery and then used to power the load. If PV power is
insufficient, grid will make supplement for ba�ery and load simultaneously.
Load First: PV power is firstly used to power the load and then used to charge the ba�ery. If PV power is
insufficient, Grid will provide power to load.
Max Solar Power: allowed the maximum DC input power
Grid Peak-shaving: when it is ac�ve, grid output power will be limited within the set value. If the load
power exceeds the allowed value, it will take PV energy and ba�ery as supplement. If s�ll can’t meet the
load requirement, grid power will increase to meet the load needs.
System Work Mode Time of use: it is used to program when to use grid or
Grid
generator to charge the ba�ery, and when to discharge
Time Of Use
Charge Gen
the ba�ery to power the load. Only �ck "Time Of Use"
Time Power Batt
Work then the follow items (Grid, charge, �me, power etc.)
01:00 5:00 12000 49.0V Mode2 will take effect.
05:00 9:00 12000 50.2V Note: when in selling first mode and click �me of use,
the ba�ery power can be sold into grid.
09:00 13:00 12000 50.9V Grid charge: u�lize grid to charge the ba�ery in a �me
13:00 17:00 12000 51.4V period.
17:00 21:00 12000 47.1V
Gen charge: u�lize diesel generator to charge the ba�ery
in a �me period.
21:00 01:00 12000 49.0V Time: real �me, range of 01:00-24:00.
Power: Max. discharge power of ba�ery allowed.
Ba�(V or SOC %): ba�ery SOC % or voltage at when the
ac�on is to happen.
For example:
System Work Mode
During 01:00-05:00, when ba�ery SOC is lower than 80%, it will
Grid Time Of Use
use grid to charge the ba�ery un�l ba�ery SOC reaches 80%.
Charge Gen Time Power Batt During 05:00-08:00 and 08:00-10:00, when ba�ery SOC is higher
Work
01:00 5:00 12000 80% Mode2
than 40%, hybrid inverter will discharge the ba�ery un�l the SOC
reaches 40%.
05:00 8:00 12000 40%
During 10:00-15:00, when ba�ery SOC is higher than 80%, hybrid
08:00 10:00 12000 40% inverter will discharge the ba�ery un�l the SOC reaches 80%.
10:00 15:00 12000 80% During 15:00-18:00, when ba�ery SOC is higher than 40%, hybrid
15:00 18:00 12000 40% inverter will discharge the ba�ery un�l the SOC reaches 40%.
18:00 01:00 12000 35% During 18:00-01:00, when ba�ery SOC is higher than 35%, hybrid
inverter will discharge the ba�ery un�l the SOC reaches 35%.
5.8 Grid Setup Menu
Grid Setting
Please select the correct Grid Mode in your local area.
Grid Mode General Standard
If you are not sure, please choose General Standard.
UL1741& IEEE1547
Grid
CPUC RULE21 Set1 Please select the correct Grid Type in your local area,
SRD-UL-1741 otherwise the machine will not work or be damaged.
Phase Type
Grid Level 220V-3P
230V-3P
0/120/240
240V-3P
133V-3P 0/240/120
120V-3P
Grid Setting
For California only.
Q(V) FW VW
Grid Setting
For California only.
L/HVRT L/HFRT
Advanced Function
Ex_Meter For CT: when using zero-export to CT mode,
Parallel Modbus SN the hybrid inverter can select EX_Meter For CT func�on
Master 00 and use the different meters.e.g.CHNT and Eastron.
Paral.
Slave Set3
Li-BMS
Device Info.
SUN-12K Inverter
Volt Curr Temp SOCID: 2102199870
Energy Charge Flash
Fault
This page show Inverter ID, Inverter version and alarm
HMI: Ver 1001-8010 MAIN:Ver2002-1046-1707
Volt Curr codes.
1 50.38V 19.70A 30.6C 52.0% 26.0Ah 0.0V 0.0A 0|0|0
Alarms Code31.0C 51.0% Occurred
2 50.33V 19.10A 25.5Ah 53.2V 25.0A 0|0|0 Device
Sum
3 F13 Grid_Mode_changed
50.30V 16.90A 30.2C 12.0% 6.0Ah2021-06-11 13:17
53.2V 25.0A 0|0|0
4 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
Info
Data
5 F23 Tz_GFCI_OC_Fault 0.0Ah2021-06-11
0.0A 08:23
0.00V 0.00A
6 0.00V 0.00A
0.0C
0.0C
0.0%
0.0%
0.0V
0.0Ah2021-06-11
0.0V
0|0|0
0.0A 08:21
0|0|0 HMI: LCD version
F13 Grid_Mode_changed
7 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
8 F56 DC_VoltLow_Fault
0.00V 0.00A
9 0.00V 0.00A
0.0C
0.0C
0.0%
0.0%
0.0Ah2021-06-10
0.0Ah
0.0V
0.0V
0.0A 13:05
0|0|0
0.0A 0|0|0
MAIN: Control board FW version
10 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0 Details
11 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0 Data
12 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
13 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
14 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
15 0.00V 0.00A 0.0C 0.0% 0.0Ah 0.0V 0.0A 0|0|0
6. Mode
Mode I:Basic
AC cable DC cable COM cable
Solar
CT
Battery
Grid
AC cable DC cable
Grid
CT
Battery
Generator
Mode III: With Smart-Load
AC cable DC cable
Grid
CT
Battery
Smart Load
AC cable DC cable
Grid
CT
Battery
On-Grid Inverter
The 1st priority power of the system is always the PV power, then 2nd and
3rd priority power will be the ba�ery bank or grid according to the se�ngs.
The last power backup will be the Generator if it is available.
7. Limita�on of Liability
In addi�on to the product warranty described above, the state and local laws and regula�ons
provide financial compensa�on for the product's power connec�on (including viola�on of implied
terms and warran�es). The company hereby declares that the terms and condi�ons of the
product and the policy cannot and can only legally exclude all liability within a limited scope.
Error code Description Solutions
Error code Description Solutions
Error code Description Solutions
BMS Port
Meter-485 Port
1
8
10. Appendix II
1. Split Core Current Transformer (CT) dimension: (mm)
2. Seconddary output cable length is 4m.
Lead Outside
502012860 Ver: 2.2, 2021-6