0% found this document useful (0 votes)
11 views2 pages

Fence

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views2 pages

Fence

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

PROJECT TITLE: PROPOSED L-TYPE CONCRETE FENCE

LOCATION: HH GREENBELT, ALAWIHAO, DAET, C.N


Prepared by: Gilbert A. Alcantara

Section Category Item Quantity Unit Total


Price Cost
I - EXCAVATION A. None - - -
(10m x 15m) MATERIALS
B. LABOR - - - -
II - CONCRETE A. Republic 120 bags 245.00 29,400.00
WORKS (10m x 15m) MATERIALS Cement
Sand 25 cu.m 850.00 21,250.00
Ord. Gravel 1 cu.m 1,200.00 1,200.00
Crushed 3 cu.m 1,300.00 3,900.00
Gravel
(3/4)
DSB 10mm 120 pcs 155.00 18,600.00
x 6m
G.I. Wire 1 roll 1,875.80 1,875.00
#16
Cutting 30 pcs 35.00 1,050.00
Disc #4
Total Materials 77,275.00
B. LABOR - - - 38,637.50
III - FORMS AND A. Plywood 8 pcs 750.00 6,000.00
SCAFFOLDINGS MATERIALS (3/4")
Coco 50 pcs 24.00 3,960.00
Lumber
2x2x10
Nails 4" 5 kg 75.00 375.00
Nails 3" 5 kg 75.00 375.00
Nails 2" 2 kg 70.00 140.00
Nails 1-1/2" 2 kg 70.00 140.00
Total Materials 10,990.00
B. LABOR - - - 5,495.00
Summary TOTAL 50,132.50
LABOR
TOTAL 88,265.00
MATERIALS
SUMMARY OF BREAKDOWN:

I - EXCAVATION
Category Item Amount
A. MATERIALS Non -
e
B. LABOR - -

II - CONCRETE WORKS
Category Item Amount
A. MATERIALS Cement 6,000.00
Concrete Works 77,275.00
Total Materials 77,275.00
B. LABOR Labor 38,637.50

III - FORMS AND SCAFFOLDINGS


Category Item Amount
A. MATERIALS Materials (Forms) 10,990.00
B. LABOR Labor 5,495.00

TOTAL:
Category Total Amount
TOTAL LABOR 50,132.50
TOTAL MATERIALS 88,265.00