0% found this document useful (0 votes)
22 views7 pages

Giri Est.

Uploaded by

pathlothusai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views7 pages

Giri Est.

Uploaded by

pathlothusai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

HOUSE CONSTRUCTION ESTIMATION

PROP. ESTIMATION OF R.C.C GROUND FLOOR WITH HOUSE H.NO: ,SITUATED AT


THIRUMALAGIRI,UNDER THIRUMALAGIRI MUNCIPAL LIMITS,SURYAPET (DIST).

DATE: 18/08/2025
CLIENT NAME: KANDUKURI GIRI S/o.YADAGIRI
ESTIMATE VALUE: 25,20,459

S.NO ITEM TOTAL AMOUNT REMARKS

A Earthwork 39,936

B PCC 21,750

C RCC 1,40,833

D Labour Charges for Construction 3,95,107

E Reinforcement Steel 2,44,037

F Structural Steel 41,276

G Masonry 1,86,178

H Plastering 2,44,746

I Joinery Works 1,06,500

J Flooring Works 1,61,797

K Painting 5,56,149

L Water Proofing 11,224

M Miscellaneous Works 23,277

N Electrical Works 1,73,825

O Plumbing & Sanitery works 1,73,825

TOTAL BUDGET 25,20,459 INR

Rupees Twenty Five Lakhs Twenty Thousand Four Hundred Fifty And Nine Only

Prepared By
HOUSE ESTIMATION

CLIENT NAME: KANDUKURI GIRI S/o.YADAGIRI


RATE/ UNIT MATERIAL AMOUNT LABOR AMOUNT
Sno Description UOM Total Quantity Total Amount Remarks
Material Labor Material (d) Labor (e)
A EARTHWORK
Excavation in all types of soil including dense soil, for mass
excavation, footings of columns, retaining walls, core walls,
catch pits, lift pits, trenches for drains, etc., by mechanical
means (using JCB, Pocliane etc.,) including leveling dressing /
trimming the edges, with all lead and lifts. Rate to include
disposing excess earth to designated dumping yards outside
site and or spreading in layers to the required levels within the
site wherever specified.
Loose Murrum Soil Excavation Cum 526.32 62.26 - 32,769.47 32,769.47
Earth filling wherever specifically directed with approved soil in
150mm thick layers including watering, compacting etc., - - -
complete with earth brought from out side at all levels.
Back Filling Cum 200.00 35.83 - 7,166.55 7,166.55
TOTAL FOR EXCAVATION - 39,936 39,936
B CONCRETE WORKS
P C C CONCRETE
Providing and laying M10 Grade PCC of min. 100mm thick
below the raft / grade slab, below footing, foundations and
wherever specified using M.sand, 20mm and downsize
aggregate including base preparation, Compaction, leveling, all
leads and lifts,etc., complete.
PCC - Material Cum 2,000.00 - 10.88 21,750.34 - 21,750.34
TOTAL FOR PLAIN CEMENT CONCRETING 21,750.34 - 21,750.34
RCC CONCRETE
Providing and laying Ready mix cement concrete conforming to
specified grade (IS 456-2000) at the levels given below using M
sand with 12mm & 20mm and down graded aggregate, as per
specifications at all levels and places wherever needed and
compacting (but excluding steel reinforcement) with vibrators
etc., complete as per drawing and specifications of the following
items.
All the R.C.C Elements Cum 4,000.00 - 35.21 1,40,833.20 - 1,40,833.20
TOTAL FOR RCC CONCRETING WORKS 1,40,833 - 1,40,833
Labour charges for Concrete, Shuttering & Steel works,
C
Brick work, plastering works etc..,
Slab Area Sqm 3,658.40 108.00 - 3,95,107.20 3,95,107.20
TOTAL FOR LABOUR WORKS - 3,95,107 3,95,107
D REINFORCEMENT STEEL
Providing, fabricating and placing in position the "Reinforcement
Steel" of high yield strength ribbed bars of various diameters
and grade Fe 415/ Fe 500 confoRMing to IS 1786 for reinforced
concrete work. The work includes cutting, bending,
fabricating,and placing in position according to drawings.
Footing
Miscellaneous Reinforcement Kgs 70.00 - 3,486.24 2,44,036.80 - 2,44,036.80
TOTAL FOR REINFORCEMENT STEEL WORKS 2,44,037 - 2,44,037
F STRUCTURAL STEEL
Staircase Railing & Window Grills Kgs 70.00 40.00 102.51 7,175.70 4,100.40 11,276.10
Compound Wall Gate Nos 30,000.00 - 1.00 30,000.00 - 30,000.00
TOTAL FOR STRUCTURAL STEEL WORKS 37,175.70 4,100.40 41,276.10

G MASONRY WORKS
RED BRICKS
Providing and constructing 200mm thick noRMal density Solid
block masonry wall set in CM 1:5, using pre-cast blocks of
225mm x 100mm x 100mm size with minimum compressive
strength of 12 kg/sq.cm, true to plumb, line and level, including
racking out joints, scaffolding, watering, curing, including lead,
lift, wastage etc.complete.
Total Area Sqm 402.26 452.83 1,82,154.91 - 1,82,154.91
Other Misc. Areas Sqm 402.26 10.00 4,022.59 - 4,022.59
TOTAL FOR MASONRY WORKS 1,86,177.51 - 1,86,177.51

H PLASTERING WORKS
INTERNAL WALLS

Same as in Item No PLW - 001, but for "Internal Walls" of


block / RCC etc., CM 1:5 - 18m standard Arpitha / GI Mesh for
concrete and masonry joints both vertical and horizontal.
Internal Plastering Sqm 288.11 261.80 75,429.30 - 75,429.30
Ceiling Plastering Sqm 288.11 105.78 30,476.95 - 30,476.95
External Painting Sqm 288.11 454.95 1,31,077.54 - 1,31,077.54
MISCELLANEOUS PLASTERING
Miscellaneous Plastering and Touchup Works including Internal
Sqm 388.11 20.00 7,762.28 - 7,762.28
and external works
TOTAL FOR PLASTERING WORKS 2,44,746.06 - 2,44,746.06
I JOINERY WORKS
JOINERY WORKS
Providing & Fixing in position of Wooden Door Frames,
Flush Door, Hardware fittings.. etc As per Specification
D1 (1.2 X 2.135 m) - Main Door - Material Nos 30,000.00 5,000.00 1.00 30,000.00 5,000.00 35,000.00
D2 (0.915 X 2.135 m) - Bed Room Door Material Nos 10,000.00 2,000.00 2.00 20,000.00 4,000.00 24,000.00
D3 (0.915 X 2.135 m) - Toilet Room Door Material Nos 5,000.00 1,500.00 1.00 5,000.00 1,500.00 6,500.00
Windows - 1.2 x 1.5 Nos 5,000.00 1,500.00 4.00 20,000.00 6,000.00 26,000.00
Ventilaters - 0.45 x 0.3 Nos 3,000.00 2,000.00 3.00 9,000.00 6,000.00 15,000.00
TOTAL FOR JOINERY WORKS 84,000.00 22,500.00 1,06,500.00
J FLOORING WORKS
TILES & GRANITE WORKS
RATE/ UNIT MATERIAL AMOUNT LABOR AMOUNT
Sno Description UOM Total Quantity Total Amount Remarks
Material Labor Material (d) Labor (e)

Providing & laying in position 800X800 prime quality, standard


make, approved colour and shade. "Vitrified Tiles" for Floors as
per design, set in Tile adhesive over bed of Screed Concrete
M10 Grade, 40mm thick to a total thickness ( bed + tile ) of 53
mm. Laid to proper level. Joints shall be filled with self matching
colour pigment of Roff / Fosroc or equivalent make. Curing &
cleaning etc complete as per manufacturers instruction, for
Flooring, as directed by the Architect / PMC. For Living,
Dining,Kitchen and Bed Rooms, at all heights and levels.
"Screed Concreting Rate Taken in PCC"
"Vitrified Tiles" Sqm 601.34 1,022.20 58.05 34,906.89 59,336.77 94,243.66
Same as Item No : FLR - 9.01 but for Skirting. Rm 50.00 213.20 60.45 3,022.50 12,887.94 15,910.44
Providing & laying in position, Prime quality "Antiskid Ceramic
Tiles" for "Toilets Flooring" using 300x300mm Somany /
Kajaria make of approved colour and shade, as per design, set
in cement slurry over 1:4 cement mortar bed, to a total
thickness (bed + tile) of 43mm. Laid to proper level. Joints
shall be filled with self matching colour pigment of Roff/ Fosrock
or equivalent make.Curing & cleaning etc,. complete
Antiskid Ceramic Tiles for "Toilets Flooring" Sqm 538.71 807.00 1.66 893.02 1,337.76 2,230.78
Providing and laying in position 300x600mm "Ceramic Tiles"
for "Toilet Dadoing" of Bell / Kajaria make and ivory/pastel
colour, of 1st quality as per design, set in tile adhesive to proper
slope and level. Joints shall be filled with specified colour
pigment, of Roff, Fosrock or equivalent make. including cost of
PVC corner and Spacers, curing, polishing and cleaning with
mild oxalic acid etc. complete as per manufacturers
specification, or as directed by Architect.
Ceramic Tiles for "Toilet Dadoing" WALLS Sqm 538.71 807.00 10.71 5,769.58 8,642.97 14,412.55
Providing and laying in position 300x450mm Tiles for "Kitchen
Dadoing" of Bell / Kajaria make and ivory/pastel colour, of 1st
quality as per design, set in tile adhesive. Joints shall be filled
with specified colour pigment, of Roff, Fosrock or equivalent
make. including cost of PVC corner and Spacers, curing,
polishing and cleaning with mild oxalic acid etc. complete as
per manufacturers specification, or as directed by Architect.
Kitchen Dadoing Sqm 538.71 807.00 6.60 3,555.49 5,326.20 8,881.69
KITCHEN GRANITE
Providing & laying approved quality "Polished Sadarahalli
Granite" for "Staircase Treads & Landings etc." as per
design and in required sizes and shapes, including backing in
cement mortar 1:5 - 25mm thick, including filling all joints with
matching pigment from ROFF or equivalent make as per
Architects / PMC instructions including cutting fitting , groove
making, nosing, polishing.etc.
Kitchen Counter Sqm 379.93 215.20 3.64 1,382.96 783.33 2,166.29
Miscellaneous Tiling - Maintenance Works Sqm 1,879.93 515.20 10.00 18,799.34 5,152.00 23,951.34
TOTAL FOR TILING AND GRANITE WORKS 68,330 93,467 1,61,797
K PAINTING AND POLISHING
Internal Ceiling Painting - 1 coat coarse putty, 2 coat fine
putty, 1 coat primer & 2 coat plastic emulsion paint
"Internal Walls Sqm 288.68 129.12 261.80 75,576.52 33,804.07 1,09,380.59
"Internal Ceiling Sqm 288.68 129.12 105.78 30,536.43 13,658.42 44,194.85
Providing & applying Texture Paint & 2 coats of Apex Ultima
Paint, of approved equivalent on "Exterior surfaces" at all
heights to give an even shade, including thoroughly brushing
the surface free from mortor droppings and other foreing matter
and over a coat of exterior primer, with necessary scaffolding,
cleaning of all glass surfaces of paint droppings etc.as per
manufacturers instruction.
"EXTERNAL WALL PAINTING - MATERIAL" Sqm 102.75 236.72 454.95 46,748.27 1,07,695.76 1,54,444.04
INTERNAL DOOR POLISHING - - -
Providing & applying two coats Door Paint of with Spray
Machine, of approved equivalent on "Internal Doors" at all
heights to give an even shade, including thoroughly brushing
the surface free from mortor droppings and other foreign matter,
cleaning of all surfaces of paint droppings etc.as per
manufacturers instruction.
Sqm 75.32 215.20 6.30 474.52 1,355.76 1,830.28
"ENAMEL PAINTING FOR MS ITEMS"
Providing & applying two coats Enamel Paint with Brush, of
approved equivalent on "Window Grills" at all heights to give
an even shade, including thoroughly brushing the surface free
from mortor droppings and other foreign matter, cleaning of all
surfaces of paint droppings etc.as per manufacturers
instruction.
Sqm 75.45 32.28 12.06 909.93 389.30 1,299.23
MISCELLANEOUS PAINTING
Compound Wall Grills, Terrace Doors etc., LS 1.20 1.25 1,00,000.00 1,20,000.00 1,25,000.00 2,45,000.00
TOTAL FOR PAINTING WORKS 2,74,246 2,81,903 5,56,149
L WATER PROOFING WORKS
Toilet, Utility & Balcony Water Proofing - Material
Providing waterproofing for the "Toilet" by Surface method as
per the specifications with a minimum guarantee period of 10
years and testing of treatment at intervals as specified.
Toilet Water Proofing - Material Sqm 453.20 2.70 1,223.64 - 1,223.64
Toilet Water Proofing - Labour Nos 5,000.00 2.00 - 10,000.00 10,000.00
TOTAL FOR WATER PROOFING WORKS 1,223.64 10,000.00 11,223.64
M MISCELLANEOUS WORKS
FALSE CEILING
Providing and fixing "Gypsum Board false ceiling In
Corridor" for Lobby Ceiling using Standard GI Channels of
600mm interval on both side and one coat painting including all
necessary fittings,scaffolding as per architectural design and
details etc.,complete.
GYPSUM BOARD FALSE CEILING Sqm 308.88 215.20 44.41 13,718.72 9,557.98 23,276.70
TOTAL FOR MISCELLANEOUS WORKS 13,718.72 9,557.98 23,276.70
RATE/ UNIT MATERIAL AMOUNT LABOR AMOUNT
Sno Description UOM Total Quantity Total Amount Remarks
Material Labor Material (d) Labor (e)

Total Amount 13,16,237.42 8,56,571.88 21,72,809.30


N Adding Electrical Items -8% 1,73,824.74
O Adding Plumbing & Sanitery Works - 8% 1,73,824.74
TOTAL AMOUNT FOR CONSTRUCTION 25,20,458.79

Prepared By:
MEASUREMENT SHEET
CLIENT NAME: KANDUKURI GIRI S/o.YADAGIRI
NET
SNO DESCRIPTION UOM NOS LENGTH BREADTH DEPTH QUANTITY DEDUCTIONS
QUANTITY
EXC - A EXCAVATION
1 Number of Footings Cum 9 1.20 1.20 1.20 15.55
2 Long walls for CRS work Cum 2 16.81 1.00 0.90 30.26
3 Short walls for CRS work Cum 2 9.14 1.00 0.90 16.45
Total Quantity 62.26 0.00 62.26
EXC-B BACK FILLING
1 Total Quantity Cum 62.26
Deductions:
1 PCC Quantity Cum 5.53
2 Footing Quantity Cum 4.05
3 Columns upto Plinth Level Cum 0.39
4 CRS Quantity Cum 16.45
TOTAL QUANTITY Cum 62.26 26.43 35.83
SM -A STONE MASONRY
1 Long Walls @ 750mm Cum 2 15.91 0.75 0.45 10.74
2 Long Walls @ 550mm Cum 2 15.91 0.55 0.45 7.88
3 Long Walls @ 300mm Cum 2 15.91 0.30 0.45 4.30
4 Short Walls @ 750mm Cum 2 8.47 0.75 0.45 5.71
5 Short Walls @ 550mm Cum 2 8.47 0.55 0.45 4.19
6 Short Walls @ 300mm Cum 2 8.47 0.30 0.45 2.29
Total Quantity 35.10 0.00 35.10
CON CONCRETE WORKS
CON - A P:C:C GROUND FLOOR
1 Number of Footings Cum 9 1.00 1.00 0.10 0.90
2 Long Walls PCC for CRS Cum 2 15.91 0.95 0.10 3.02
3 Short Walls PCC for CRS Cum 2 8.47 0.95 0.10 1.61
4 PCC for Staircase bed Cum 1 1.22 0.45 0.10 0.05
5 PCC for Hall Cum 1 7.31 3.04 0.10 2.22
6 PCC for Bed Room-1 Cum 1 3.04 3.35 0.10 1.02
7 PCC for Bed Room-2 Cum 1 3.04 3.35 0.10 1.02
8 PCC for Kitchen Cum 1 3.04 2.50 0.10 0.76
9 PCC for Toilet Cum 1 1.80 1.50 0.10 0.27
Total Quantity 10.88 0 10.88
CON - B R.C.C Works
1 Footings Cum 9 1.00 1.00 0.45 4.05
Columns
2 Up to Plinth Length level Cum 9 0.30 0.23 0.65 0.39
3 From Plinth level to Slab Level Cum 9 0.30 0.23 4.00 2.43
Plinth Beams
4 Long Beams Cum 3 15.91 0.23 0.30 3.22
5 Short Beams Cum 5 8.47 0.23 0.30 2.86
Roof Beams
6 Long Beams Cum 2 17.41 0.23 0.20 1.57
7 Short Beams Cum 4 10.27 0.23 0.20 1.85
8 Stair Case Beam Cum 1 2.00 0.23 0.20 0.09
Chejjas
9 Bed Room Cum 1 4.11 0.45 0.08 0.14
10 Other side Cum 1 2.04 0.45 0.08 0.07
11 Hall Cum 1 4.11 0.45 0.08 0.14
12 Other side Cum 1 2.81 0.45 0.08 0.09
Roof Slab
Slab Area Cum 1 12.00 9.00 0.15 16.42
Stair Case
14 Rises Cum 22 1.00 0.15 0.15 0.50
15 Treads Cum 22 1.00 0.30 0.15 0.99
16 Mid Land Landing Cum 1 2.00 1.00 0.15 0.30
Lintels
17 For Doors Cum 2 1.20 0.15 0.10 0.04
18 For Windows Cum 4 1.20 0.15 0.10 0.07
Total Quantity 35.21 0.00 35.21
STL - A STEEL/REINFORCEMENT
1 Slab Area kgs 108.00 32.28 3486.24
STL - B M.S. WORKS
1 Staircase Railing Sqm 1 5.4 0.9 4.86
NET
SNO DESCRIPTION UOM NOS LENGTH BREADTH DEPTH QUANTITY DEDUCTIONS
QUANTITY
2 Window Grills Sqm 4 1.2 1.5 7.20
Total Quantity 12.06 0.00 12.06
Per Sqm @8.5 Kgs 102.51
MAS - A MASONRY WORK
1 Long Walls Sqm 6 15.91 2.80 267.29
2 Short Walls Sqm 6 8.47 2.80 142.21
3 Parapet Wall - Long Wall Sqm 2 18.31 0.90 32.96
4 Parapet wall - Short Wall Sqm 2 10.64 0.90 19.15
5 Toilet Wall Sqm 2 1.82 1.21 4.40
Deductions
1 Doors - Main Door Sqm 1 1.20 2.10 2.52
2 Doors - Bed Room Doors Sqm 1 0.90 2.10 1.89
3 Toilet Doors Sqm 1 0.75 2.10 1.58
4 Windows Sqm 4 1.2 1.5 7.20
Total Quantity 466.01 13.19 452.83
JOI - A JOINERY WORKS
1 Doors - Main Door Nos 1 1.00
2 Doors - Bed Room Doors Nos 2 2.00
3 Toilet Doors Nos 1 1.00
4 Windows Nos 4 4.00
5 Ventilater Nos 3 3.00
PLA PLASTERING WORK
PLA - A Ground Floor
1 Hall Sqm 2 7.31 2.98 43.49
2 " Sqm 2 3.04 2.98 18.09
3 Bed Room-1 Sqm 2 3.04 2.98 18.09
4 " Sqm 2 3.35 2.98 19.93
5 Bed Room-2 Sqm 2 4.57 2.98 27.19
6 " Sqm 2 3.50 2.98 20.83
7 Kitchen Sqm 2 2.13 2.98 12.67
8 " Sqm 2 1.52 2.98 9.04
9 Toilet-1 Sqm 2 2.74 2.98 16.30
10 " Sqm 2 2.43 2.98 14.46
11 Staircase Risers Sqm 22 1.00 2.98 65.45
12 Staircase Treads Sqm 22 1.00 0.30 6.60
13 Other Mis. Areas Sqm 2 5.00
Deductions
1 Doors - Main Door Sqm 1 1.20 2.10 2.52
2 Doors - Bed Room Doors Sqm 2 0.90 2.10 3.78
3 Toilet Doors Sqm 1 0.75 2.10 1.58
4 Windows Sqm 4 1.2 1.5 7.20
5 Ventilater Sqm 2 0.45 0.3 0.27
Total Quantity 277.15 15.35 261.80
PLA - B Ceiling Plastering Ground Floor
1 Hall Sqm 2 7.31 3.04 44.44
2 Bed Room-1 Sqm 2 3.35 3.04 20.37
3 Bed Room-2 Sqm 2 3.35 3.04 20.37
4 Kitchen Sqm 2 3.04 2.5 15.20
5 Toilet Sqm 2 1.8 1.5 5.40
Total Quantity 105.78 0.00 105.78
PLA - C External Plastering
1 Basement Plastering - long Walls Sqm 4 18.31 4.1 300.28
2 Basement Plastering - short walls Sqm 4 10.04 4.1 164.66
Deductions
1 Main Door Sqm 1 1.2 2.1 2.52
2 Windows Sqm 4 1.2 1.5 7.20
3 Ventilater Sqm 2 0.45 0.3 0.27
Total Quantity 464.94 9.99 454.95
FLR TILING WORK & GRANITE WORK
FLR - A Main Flooring Ground Floor
1 Hall Sqm 1 4.57 3.96 18.10
2 Bed Room-1 Sqm 1 4.57 3.65 16.68
3 Bed Room-2 Sqm 1 4.57 3.5 16.00
4 Kitchen Sqm 1 2 1.98 3.96
5 Toilet-1 Sqm 2 1.21 1.37 3.32
Total Quantity 58.05 0.00 58.05
NET
SNO DESCRIPTION UOM NOS LENGTH BREADTH DEPTH QUANTITY DEDUCTIONS
QUANTITY
FLR - B Skirting Work
1 Hall Rm 1 13.42 13.42
2 Bed Room-1 Rm 1 14.32 14.32
3 Bed Room-2 Rm 1 14.62 14.62
4 Kitchen Rm 1 7.47 7.47
5 Toilet Rm 2 5.31 10.62
Total Quantity 60.45 0.00 60.45
FLR - C Toilet Flooring
1 Toilet Sqm 1 1.21 1.37 1.66
Total Quantity 1.66 0.00 1.66
FLR - D Toilet Dado
1 Toilet Sqm 2 1.8 2.1 7.56
2 " Sqm 2 1.5 2.1 6.30
Deductions
1 Doors Sqm 2 0.75 2.1 3.15
Total Quantity 13.86 3.15 10.71
FLR - E KITCHEN DADO
1 Total Length Sqm 2 1.5 2.2 6.60
Total Quantity 6.60 0.00 6.60
GRA - A KITCHEN GRANITE
Total Length Sqm 2 1.82 1 3.64
3.64 0.00 3.64
PTN - D Doors Painting
1 Main Door Sqm 1 1.2 2.1 2.52
2 Bed Room Doors Sqm 2 0.9 2.1 3.78
Total Quantity 6.30 0.00 6.30
PTN - E Enamel Painting
1 Staircase Railing Sqm 1 5.4 0.9 4.86
2 Window Grills Sqm 4 1.2 1.5 7.20
Total Quantity 12.06 0.00 12.06
WTR - A WATER PROOFING
1 Toilet Sqm 1 1.8 1.5 2.70
Total Quantity 2.70 0.00 2.70
MIS MISCELLANEOUS ITEMS
MIS - A FALSE CEILING WORKS
1 Hall Sqm 1 7.31 3.04 22.22
2 Bed Room Sqm 2 3.04 3.65 22.19
Total Quantity 44.41 0.00 44.41