Term                   Condition
Sr.
                             Item code:- 1001010100
1     Item Nomenclature      ACETONE PURE TO SPECN.IS:170-76 (2ND REVISION).(UNIT:-LITER)
                             OTE in Two Bid System on GeM Portal.
                             NOTE:-
                                1) FIRM     MUST    COMPLY      OFAJ BID TECHNICAL
                                    SPECIFICATION WITH DULY SIGN & STAMP
1A    Type of TE                2) BID OFFER WITHOUT SUBMISSION OF SUPPLY ORDER
                                    COPY OF SAME/SIMILAR ITEM SUPPLIED IN PAST FIVE
                                    YEAR & OFAJ BID TECHNICAL SPECIFICATION WITH
                                    DULY SIGN & STAMP WILL BE IGNORED.
2     Option Clause          Not Applicable
                             FOR – OFAJ (transportation/post parcel/ loading &
      a) Delivery Terms      unloading/dispatch of material at consignee place will be done by
                             supplier itself)
3
                             100% of the S.O. quantity to be supplied within 90 days from the
      b) Delivery Schedule   date of placement of the Supply Order
                             a) ADDITIONAL DOC 01: VENDOR SHOULD HAVE SUPPLY
                                ORDER FOR THE SUPPLY OF SIMILAR ITEMS IN PAST FIVE
                                YEARS TO ANY ORDNANCE FACTORIES/PSU/PRIVATE FIRM ,
                                COPY OF SUCH SUPPLY ORDER TO BE ENCLOSED
                             b) ADDITIONAL DOC 02: FIRM IS REQUESTED TO COMPLY &
4     Eligibility Criteria      SUBMIT UDYAM CERTIFICATE OF CURRENT FINANCIAL YEAR
                                FOR MSE PURCHASE PREFERENCE, IF FIRM IS UDYAM
                                REGISTERED.
                             c) ADDITIONAL DOC 02: FIRM MUST COMPLY OFAJ BID
                                TECHNICAL SPECIFICATION WITH DULY SIGN & STAMP WITH
                                MAKE MENTIONED IN BUYER DOCUMENT
      Quality Monitoring     As per products specification
4A
      instruction (QMI)
                             If the material supplied by the vendors is rejected at the factory
                             premises, the vendor is required to lift the rejected material within
                             30 days of issue of rejection I-Note. The OFs have right to recover a
                             charge for the storage space at @1% of the cost of material un-
                             cleared, per week or part thereof, with maximum ceiling of 10% of
                             value of the items. After lapse of 10 weeks, if it is found that firm
                             has not taken any action for lifting of items, the goods may be
                             confiscated and disposed off as per disposal procedure in vogue
4C    Ground Rent
                             after sending a notice and giving 30 working days time to the firm.
                             Ground rent shall be calculated from the date of expiry of the
                             period of removal of item. No ground rent should be charged from
                             Central/State Govt. /Central PSUs. When the firm fails to pay the
                             applicable ground rent within the prescribed period, factory is
                             entitled to recover the ground rent due and all incidental expenses
                             from EMD/PSD
                             Representative of ED/OFAJ. ED Reserves the right to change the
5     Inspection Authority   inspection agency to suit the convenience of the factory and in the
                             interest of the State.
                             a) EMD for a value of Rs.Nil /- to be submitted in the form of
      EMD / Bid Security
6                            Account Payee Demand Draft / Fixed Deposit Receipt /Banker’s
      Declaration
                             Cheque / Bank Guarantee (in prescribed format) from any of
                                Page | 1
                            the Commercial banks / payment online (to be specified, on
                            implementation). EMD should be valid for 90 days beyond the
                            validity of the bid. Bank details are as follows
                            b) Offers not accompanied with requisite amount of EMD or
                            EMD not submitted in the specified form in original shall be
                            summarily rejected.
                            c) EMD will not carry any interest for the period it is retained
                            with Buyer. EMD will be forfeited if a Seller withdraws, amends,
                            impairs and/or derogates within validity period.
                            d) EMD is to be submitted by the bidders except Micro and
                            Small Enterprises (MSEs) having UAM number as defined in
                            MSE Procurement Policy 2012 issued by Department of Micro,
                            Small and Medium Enterprises (MSME) or are registered with
                            the Central Purchase Organisation or the concerned Ministry or
                            Department (including OFs) or Start-ups as recognised by
                            Department of Industrial Policy and Promotion (DIPP),
                            irrespective of the store for which they are registered. EMD is
                            also not required from Central PSUs. Bidders/Sellers exempted
                            from submission of EMD must submit certified copy of Govt of
                            India authority for such exemption in lieu of EMD.
                            e) EMD of the technically rejected bidder shall be returned
                            immediately after technical evaluation. EMD of balance
                            unsuccessful bidders will be returned to them at the earliest
                            after expiry of the final bid validity and latest on or before the
                            30th day after award of contract/ finalization of the tender. The
                            EMD of the successful bidder would be returned, without any
                            interest whatsoever, after the receipt of PSD from them as called
                            for in the consequent Contract.224
                            f) In case of two bid system EMD in original form should be
                            enclosed along with the technical bid. Technical bid without
                            EMD in original will be rejected.
                            g) EMD remittance document, either in Indian currency or any
                            other convertible currency of the specified amount, can be
                            arranged by the Indian subsidiary / branch office in India of a
                            foreign Seller which shall be submitted along with a certificate
                            confirming the relationship of subsidiary / branch office in the
                            Seller’s offer.
                            h) EMD Shall be submitted in favor of YANTRA INDIA LIMITED,
                            ORDNANCE FACTORY AMBAJHARI, NAGPUR. The Seller
                            should send original copy of PSD to Factory /Unit. Bank Details
                            are as follows:
                              1   BENEFICIARY         :   YANTRA INDIA LIMITED
                                  NAME                    ORDNANCE FACTORY
                                                          AMBAJHARI
6A   BANK DETAILS
                              2   Account No          :   40429114389
                              3   IFSC CODE           :   SBIN0010314
                              4   BANK NAME           :   STATE BANK OF INDIA
                              5   BANK ADDRESS        :   AMBAJHARI ORDNANCE
                                                          FACTORY
     Performance Security   PSD is necessary if contracts valuing up above than Rs.10
7
     Deposit                lakhs.(as per YILSPM 2024
                               Page | 2
8      Payment Terms            Within 30 days after receipt & acceptance of material at OFAJ
                                Applicable, Minimum 25% of TE qty. will be offered to MSE firm,
       Public Procurement for   quoting in range of L1 + 15% at L1 rate. Note: If L-1 is NON-MSEs
9
       MSEs, Order 2012         (Further if the minimum quantity comes in fraction then the
                                Quantity will be round off to nearest whole no)
       Public Procurement
10     (Preference to Make in   Applicable or as per GeM portal
       India), Order 2017
       Liquidated Damages       Applicable: The time for and the date of delivery of the stores
       (LD):                    stipulated in the Purchase Order shall be deemed to be the essence
                                of the contract, and delivery must be completed not later than the
                                dates specified therein. Should the Seller fail to deliver the material
                                to our premises or any consignment thereof within the period
                                prescribed for such delivery, Buyer shall be entitled to recover from
                                the Seller agreed liquidated damages, and not by way of penalty a
                                sum of 0.5% per week of delay or part thereof, subject to a
10A                             maximum of 10% as our claim towards liquidated damages on the
                                undelivered part of the order. The LD will be charged on the basic
                                cost excluding taxes and duties. Imposition, recovery or settlement
                                of this LD shall not affect Buyer’s right to performance,
                                compensation and termination of the agreement. Liquidated
                                Damages in contracts with Price Variation formula shall be levied
                                on the price as varied by the operation of the Price Variation
                                clause.
       GST DETAILS (BUYER)      27AABCY4214A2ZS
                                ADD: C/O GENERAL MANAGER, ORDNANCE FACTORY, P O
10B
                                AMBAZARI, DEFENCE PROJECT NAGPUR, AMBAZARI, Nagpur,
                                Maharashtra, 440021
       Arbitration &            No, applicable as per YILSPM 2024 and GeM GTC , all
1O C   Mediation Clause         other terms & conditions shall be governed.
       All other general terms and condition shall applicable as per provisions of YILSPM 2024 and
11
       Quality Monitoring Instructions to Vendors. OR as per GeM Portal
                                    Page | 3