The document provides a detailed report on various construction projects in Bangalore, including their current status, sub-status, and expected completion dates. Projects range from hospitals and educational institutions to residential quarters and railway infrastructure, with many under construction and some in pre-construction phases. The report also includes specific updates on ongoing work and contractor appointments for several projects as of May 2025.

Uploaded by

Sandeep V
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
267 views110 pages

Bil Trax

The document provides a detailed report on various construction projects in Bangalore, including their current status, sub-status, and expected completion dates. Projects range from hospitals and educational institutions to residential quarters and railway infrastructure, with many under construction and some in pre-construction phases. The report also includes specific updates on ongoing work and contractor appointments for several projects as of May 2025.

Uploaded by

Sandeep V
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 110

Biltrax Construction D

Projects Details
Report Generated : 15:23 IST, 29
User : Akash Parthe

Project Name Latest Status Latest Sub Status Latest Status Date

Brigade St John Hospital


(El Dorado), Bangalore Under Construction Substructure WIP 14/05/2025

Manipal Hospital,
Bangalore Under Construction Superstructure 75% 31/01/2025

Yashoda Hospital,
Bangalore Under Construction Substructure WIP 13/05/2025

Narayana Hospital,
Bangalore Under Construction Substructure WIP 14/05/2025

MES Deficient Children Site Development/


School, Bangalore Under Construction Initial Site Setup 15/05/2025
MES ASC Centre,
Bangalore Pre-Construction Contractor - Appointed 17/03/2025
CPWD Residential
Quarters, Bangalore Under Construction Substructure 100% 23/04/2025

KHB Karnataka
Examination Authority
Building Extension,
Malleshwaram Pre-Construction Contractor - Appointed 20/01/2025
KRIDE Bengaluru
Suburban Rail Project,
Bangalore
(Channasandra -
Rajankunte) Under Construction 23/05/2025

KHB Office Building,


Bengaluru Pre-Construction Contractor - Appointed 07/03/2025
MES JWO Married
Accommodation,
Yelahanka Under Construction Substructure WIP 29/04/2025

IISc Modern Indoor


Sports Complex,
Bangalore Under Construction Superstructure 25% 29/05/2025
CPWD Staff Quarters,
Bangalore Under Construction Substructure 100% 25/04/2025

MES Deficient Married


Accommodation,
Bangalore Under Construction Superstructure 25% 03/04/2025
CPWD IISC BTech
Building, Bangalore Under Construction Substructure WIP 02/05/2025

CPWD PNB Training


Centre, Bangalore Under Construction Substructure WIP 16/05/2025
CPWD ESIC Hospital, Site Development/
Bommasandra Under Construction Initial Site Setup 11/04/2025

CPWD CPRI Campus


Expansion, Bangalore Under Construction Superstructure 100% 13/05/2025
SWR Redevelopment of
Railway Station,
Yesvantpur Under Construction 13/02/2025
KRIDE Bengaluru
Suburban Rail Project,
Bangalore (Heelalige -
Benniganahalli) Under Construction 24/02/2025
SWR Redevelopment of
Railway Station,
Bangalore Cantt Under Construction 01/03/2025
Biltrax Construction Data
Projects Details
Report Generated : 15:23 IST, 29th May 2025
User : Akash Parthe

As per our
Latest conversation
Status Update Project Slug Latitude Longitude
with Mr. Gulam
Mohiuddin (Assistant
Vice President - MEP),
we were informed that
excavation work is in
progress. Note:
Procurement decisions
for finishing products
will be taken by St
Johns Hospitals. http://in.biltrax.com/project-profile/brigade-st-john-hospital-el-dorado-bangalore
13.145353 77.683211
As per our conversation
with Mr.Thiyagarajan N
(Chief Manager), we
were informed that 5th
floor RCC work is in
progress. http://in.biltrax.com/project-profile/manipal-hospital-bangalore
12.846769 77.654184
As per our conversation
with Mr. Suresh
(Purchase Head), we
As perinformed
were our conversation
with Mr. Gururaj
that excavation
Hebber (Purchase
work is in progress. http://in.biltrax.com/project-profile/yashoda-hospital-bangalore
Head), we were
informed that
basement work is in
progress.Note: Product
specification would be
done by their in- house
architect. http://in.biltrax.com/project-profile/narayana-hospital-bangalore

As of May 2025, as per


our conversation with
Mr. Ashish Singhal, we
were informed that the
initial site setup work is
in progress. http://in.biltrax.com/project-profile/mes-deficient-children-school-bangalore
As of March 2025, as
per our conversation
with contractor
representative Mr.
Trinevia, the contract
has been awarded to
CMK Projects Private
Limited on EPC Basis. http://in.biltrax.com/project-profile/mes-asc-centre-bangalore
As of April 2025, as per
our conversation with
Mr. Sunil Kumar Singh,
we were informed that
Foundation work is
completed. http://in.biltrax.com/project-profile/cpwd-residential-quarters-bangalore
12.988038 77.614858

As per our discussion


with Mr. Nagraj from
Santhosh Buildwel Infra
Private Limited in
January 2025, it was
confirmed that the
tender issued for the
selection of a Civil
Works Contractor has
been awarded to
Santhosh Buildwel Infra
Private Limited. http://in.biltrax.com/project-profile/khb-karnataka-examination-authority-building-extension-ma
13.008989 77.570771
As of May 2025, as per
our conversation with
Mr.Shant Kumar, we
were informed that the
tender floated for the
selection of a civil works
contractor to construct
the 9 stations, Elevated
(1) and at-grade (8)
BSRP stations of
Corridor-4B have been
awarded to NCC
Limited. http://in.biltrax.com/project-profile/kride-bengaluru-suburban-rail-project-bangalore-channasan

As of March 2025, as
per our conversation
with Mr. Shivakumar,
we have been informed
that construction
work is not yet started
due to internal issues
from the governing
body. http://in.biltrax.com/project-profile/khb-office-building-bengaluru
As of April 2025, as per
our conversation with
Mr. Umesh we are
informed that
foundation is in
progress. http://in.biltrax.com/project-profile/mes-jwo-married-accommodation-yelahanka
13.145306 77.624806

As of May 2025, as per


our conversation with
Mr. Raghuraman D, we
were informed that
the superstructur
e work is in progress. http://in.biltrax.com/project-profile/iisc-modern-indoor-sports-complex-bangalore
As of April 2025, as per
our conversation with
Mr. Ashok
Kumar(Director), we
were informed that the
foundation work is
completed and
superstructure work will
start in 15 days. http://in.biltrax.com/project-profile/cpwd-staff-quarters-bangalore

As of April 2025, as per


our conversation with
Mr. Ratna Gopal we are
informed that 30% of
the structural work is
complete. http://in.biltrax.com/project-profile/mes-deficient-married-accommodation-bangalore
As of May 2025, as per
our conversation with
contractor
representative Mr
Parvez Chaudhary, we
have been informed
that foundation work is
still in progress http://in.biltrax.com/project-profile/cpwd-iisc-btech-building-bangalore

As of May 2025, as per


our conversation with
Mr. Ranjit Kumar we
are informed that
excavation work is
completed and
foundation work is not
yet initiated. http://in.biltrax.com/project-profile/cpwd-pnb-training-centre-bangalore
As of April 2025, as per
our conversation with
Mr Sathish(Purchase
Manager) we have been
informed that initial site
set up work is in
progress. http://in.biltrax.com/project-profile/cpwd-esic-hospital-bommasandra
12.782389 77.702833

As per our conversation


with Mr. Satheesh T
(Purchase Manager-
Abirami Engineering
Construction and
Company), we were
informed that brickwork
is completed. http://in.biltrax.com/project-profile/cpwd-cpri-campus-expansion-bangalore
As of February
2025,Main Building
structural work is
completed and finishing
work is in
progress.MLCP Cum
Commercial West Side
superstructure work is
completed and
brickwork is in
progress.structure work
of the Arrival Cum
Departure Plaza is in
progress. http://in.biltrax.com/project-profile/swr-redevelopment-of-railway-station-yesvantpur
13.023641 77.551697
As of February
2025, The tender
floated for the selection
of a civil works
contractor for the
construction of 9
stations (1 Elevated and
8 at grade) has been
awarded to Rail Vikas
Nigam Limited &
Rithwik Projects Private
Limited (JV).As per our
conversation with Mr.
Prem-Rithwik Projects
Private Limited,
 we were
informed that a team
has not yet been
formed for the
procurement. http://in.biltrax.com/project-profile/kride-bengaluru-suburban-rail-project-bangalore-heelalige-b
As of March 2025, as
per our conversation
with Mr.Hasib Zaman -
VCL, we were informed
that more than 50% of
the work has been
completed. http://in.biltrax.com/project-profile/swr-redevelopment-of-railway-station-bangalore-cantt
12.993007 77.597827
Brigade Group & St
John's Hospitals are
collaborating for the
Address Building Use Category development of 100-
Description
bed hospital in Aero
Park, Bangalore,
Karnataka 560063. The
project consists of1
Manipal HealthFloor + 4
Block: Ground
Enterprises
Upper FloorsPrivate
Note: The
Near Jawahar Navodaya Limited has proposed
construction area range
Vidyalaya, Bangalore the development
& cost of
are estimated.
Urban,Bangalore,Bangal their Healthcare
Documentary evidence
ore Healthcare projects in Electronics
is not available.
City Phase 1, Bangalore,
Karnataka. The project
consists of:1 Building:
Near Bosch EC3 (360° Ground Floor + 7 Upper
Business Park), Floors.Note :Constructi
Electronics City Phase on cost and area range
1,Bangalore,Bangalore Healthcare Yashoda Hospitals has
is estimated.
proposed development
of their healthcare
project near silk board
Silk Board Junction, Ring junction, ring road,
Road, Bangalore.Note:Constru
Bangalore,Bangalore,Ba ction area range & cost
ngalore Healthcare Narayana Hrudayalaya
is estimated.
Limited has proposed
development of their
Hospital at Begur Hobli,
Bangalore - 560068. The
Begur Hobli, project consists of1
Bangalore,Bangalore,Ba Building: Ground Floor +
ngalore Healthcare 11 Upper Floors

The proposed project


consists the
Construction of
Deficient Class Rooms
for Children School at
Hqtc (u) Bangalore,
Karnataka.The Project
HQTC, Includes - School
Bangalore,Bangalore,Ba Building - Ground Floor
ngalore Educational +3 Upper Floors
The Proposed Project
Involves Engineering,
Procurement and
Construction (epc) for
Provn of Phase One of
Two Phases of Klp for
Asc Centre (north)
BangaloreBuilding :-
Single living
accommodation for OR
and course members(1
Block) - Ground + 2
Upper FloorsSingle
living accommodation
for Recruits (4 Blocks) -
Ground + 2 Upper
FloorsSingle living
accommodation for OR,
course members, HQ
Wing OR, CHQ OR, ASC
Records OR (2 Blocks) -
Ground + 2 Upper
BlocksSingle living
accommodation for
Recruits (1 Block) -
Ground + 2 Upper
FloorsOffice admin
accommodation,
storage, and education
building for Training BN
ASC North (1 Block) - Ground + 1
Campus,,Bangalore Educational Defence Upper Floor
The proposed project
consists of Construction
of Residential Quarters
Type-II, Type-III, Type-V,
including water supply,
sanitary installation,
drainage electrical
installations,
development and bulk
services for Defence
Estate Office,
Bengalulru,
Karnataka.Construction
Includes - Type II : Stilt
floor + Ground Floor +
3 Upper Floors : 10
Nos Type III : Ground
Floor + 3 Upper Floors:
9 Nos Type V : Ground
,Bangalore,Bangalore Residential Staff Quarters Floor + Terrace : 1 Nos

The proposed project


involves extension and
upgradation of
Karnataka Examination
Authority Building at
Malleshwaram, District
Bengaluru.1 Block -
Miscellaneous Public Ground Floor + 4 Upper
,Bangalore,Bangalore Buildings Expansion floors
construction of the
Railway stations
including the
development of rail
infrastructure.Channasa
ndra - Rajankunte (22
Km)KSR Bengaluru -
Devanahalli (41
km)Baiyappanahalli -
Chikkabanavara (25.14
km)Kengeri - Whitefield
(35.52 km)Heelalige -
Bemmiganahalli (24
km)The Railway
Stations are as
follows:ChannasandraH
oramavuHennurThanisa
ndraRK Hegde
NagarJakkurYelahanka
MuddenahalliRajankunt
eNote - L&T
Construction has been
appointed as an EPC
contractor to construct
the elevated viaduct
and at-grade formation,
including associated
Works between
Heelalige and
Rajanukunte of
Corridor-4.NCC Limited
has been appointed as a
civil works contractor to
construct the 9 stations,
Channasandra - Elevated (1) and at-
Rajankunte,Bangalore,B grade (8) BSRP stations
angalore Transport Infrastructure Railway Station of Corridor-4B.

The proposed project


consists of the
Construction of an
Office building for the
food & Civil Supply,
consumer affairs, and
legal metrology
Department (Aahara
Soudha) at Aliaskar
Road, Bengaluru.Office
Building - Basement +
Miscellaneous Public Ground Floor + 4 Upper
,Bangalore,Bangalore Buildings Floors
The Proposed Project
Involves the Provision
of Deficient MD Accn
for Officers Phase I and
for JWO and above at
AF Station
YelahankaConstruction
Yelahanka Air Force includesBuilding Block -
Station,Bangalore,Bang Ground Floor + 7 Upper
alore Residential Staff Quarters Floors.

The Proposed Project


Involves Construction of
Modern Indoor Sports
Complex at Gymkhana
IISc
Bangalore.Construction
Includes:-Modern
Indoor Sports
Gymkhana IISc Complex :- Lower
Bangalore,Bangalore,Ba Ground Floor + Ground
ngalore Sports Infrastructure Floor + 6 Upper Floor.
The Proposed Project
Consists Construction of
64 Nos. Type III
quarters including
internal water supply
Sanitary installations IEI
works fire fighting
system street lighting
emergency light and
signages and
development of sites
and bulk services for
Income Tax at Sanjay
Nagar Bengaluru
Karnataka in EPC mode
(Design and build
basis).The Construction
Income Tax, Sanjay includes:Building Block -
Nagar,Bangalore,Bangal Basement + Stilt + 8
ore Residential Staff Quarters Floors

The Proposed Project


Consists Construction of
Deficient Officers at
Bangalore.The
Construction
includes:Offrs Married
Accommodation (20DU)
- Stilt +5 Upper
FloorsJCOs Married
Accommodation(44 DU)
- Stilt +11 Upper
FloorsOrs Married
Accommodation
(132DU) - Stilt +11
,Bangalore,Bangalore Residential Defence, Staff Quarters Upper Floors
The Proposed Project
Consists Construction of
B.Tech Building at
Indian Institute of
Science, Bangalore.The
Indian Institute of Construction
Science, includes:Building Block -
Bangalore,Bangalore,Ba Ground + 5 Upper
ngalore Educational Institutional, Expansion Floors.

The Proposed Project


Involve Construction of
Training Centre along
with Currency Chest at
Bangalore, District
Bangalore,
Punjab National Bank, karnatakaConstruction
Peenya Industrial IncludesBuilding Block -
area,Bangalore,Bangalo Basement - Ground
re Educational Institutional Floor + 5 Upper Floors
Proposed Project
involves the
construction of 200
Bedded ESIC Hospital at
Bommasandra,Bangalor Bommasandra in
e,Bangalore Healthcare Bangalore District.

The proposed project


consists Construction of
New Generator
building, New
Transformer bays, HPTR
test cell and new test
cell including Water
Supply, Sanitary
Installations, Drainage,
E&M services and other
Development and Bulk
Central Power Research Services. The project
Institute, Sadashiv consists of1 Block:
Nagar,Bangalore,Bangal Ground Floor + 2 Upper
ore Educational Expansion, Institutional Floors
The project envisages
development/redevelop
ment of Yesvantpur
Railway Station under
Southern Railways. It
include construction
of :Main Station
Building East Side:
Ground Floor + Three
Upper Floors,Arrival
Cum Departure Plaza:
Ground Floor + One
Upper Floor,MLCP Cum
Commercial West Side:
Ground Floor + Four
Yesvantpur Railway Upper Floors,Departure
Station,Bangalore,Bang Railway Station, Air Concourse and
alore Transport Infrastructure Redevelopment Arrival FOBs
has four corridors KSR
Bengaluru - Devanahalli
(41 km)Baiyappanahalli
- Chikkabanavara (25.14
km)Kengeri - Whitefield
(35.52 km)Heelalige -
Benniganahalli (24
km)This Project includes
the corridor Heelalige -
Benniganahalli (24 km).
This project envisages
the construction of the
Railway stations
including the
development of rail
infrastructure.The
Railway Stations are as
follows:HeelaligeBomm
asandraSingena
AgraharaHuskurAmbed
kar
NagarCarmelaramBella
ndur
RoadMarathahalliKagga
dasapuraBenniganahalli
Note - 1) L&T has been
appointed to construct
the elevated viaduct
and at-grade
formation. 2) Rail
Vikas Nigam Limited &
Rithwik Projects Private
Limited (JV) have been
appointed to construct
Heelalige - 9 metro stations (1
Benniganahalli,Bangalor elevated and 8 at
e,Bangalore Transport Infrastructure Railway Station grade).
The project envisages
development/redevelop
ment of Bangalore
Cantonment Railway
Station in Karnataka
state. It include
construction of :North
Block Station Building:
Ground Floor + Two
Upper Floors,South
Block Station building:
Ground Floor + Two
Upper Floors,CAO
Building: Ground Floor +
Nine Upper
Floors,DPWTC Hostel:
Ground Floor + Four
Upper Floors,Officers
Rest House: Ground
Floor + Two Upper
Floors,Railway
Operation Building:
Ground Floor + Two
Upper Floors,Combined
Bangalore Cantonment Terminal
Railway Building,Traning
Station,Bangalore,Bang Railway Station, Center,Type-II Quaters
alore Transport Infrastructure Redevelopment Building,
Construction Area (In Construction Area
Construction Start Construction Finish
SqFt) Range (In SqFt)

2025 2027 Upto 100,000

2024 2026 100,000 to 300,000

2025 2028 300,000 to 500,000

2024 2027 350000 500,000 to 1,000,000

2025 2027 Upto 100,000


2025 2028 523287 500,000 to 1,000,000
2024 2026 26651 Upto 100,000

2025 2027 Upto 100,000


2024 2027

2025 2026 100,000 to 300,000


2025 2027 Upto 100,000

2024 2026 300,000 to 500,000


2024 2025 90523 Upto 100,000

2024 2025 275997 100,000 to 300,000


2024 2025 166399 100,000 to 300,000

2024 2026 66472 Upto 100,000


2025 2027 500,000 to 1,000,000

2024 2026 107640 100,000 to 300,000


2023 2025 719492 500,000 to 1,000,000
2024 2027
2023 2025 300,000 to 500,000
Construction Cost (In Apartment Units
Bathrooms (Nos.) Project Tags
INR-Crore) (Nos.)

90

90

In-house Architectural
180 Team

In-house Architectural
150 Team

Limited Makes within


BoQ / Technical
Specifications, Makes &
Manufacturers List,
Technical Specifications,
Sustainability
Registration - GRIHA, In-
house Architectural
Team, Internal - Split AC
11 Systems
Bill of Quantities (BoQ),
Makes & Manufacturers
List, Sustainability -
Solar Water Heating,
Sustainability - Sewage
Treatment Plant,
Sustainability - Rain
124 Water Harvesting
Flooring - Vitrified Tiles,
Flooring - Glazed
Ceramic Tiles, Flooring -
Antiskid Vitrified Tiles,
Plumbing Pipes -
UPVC/CPVC/CPC,
Railings - Stainless Steel,
Sustainability - Solar
Water Heating, Facade -
Aluminium Composite
Panels, Windows -
UPVC, Bill of Quantities
(BoQ), Makes &
Manufacturers List,
7 Technical Specifications

Bill of Quantities (BoQ),


Technical Specifications,
Plumbing Pipes -
UPVC/CPVC/CPC,
Security - CCTV
Surveillance, Solar
Power Provision,
Sustainability - Sewage
Treatment Plant,
Internal - Split AC
Systems, Flooring -
Glazed Vitrified Tiles
(GVT), Flooring -
Vitrified Tiles, Flooring -
Glazed Ceramic Tiles,
23 59 Windows - UPVC
Makes & Manufacturers
List, Technical
1620 Specifications

Bill of Quantities (BoQ),


Technical Specifications,
Flooring - Glazed
Ceramic Tiles, Plumbing
Pipes -
UPVC/CPVC/CPC,
Windows - Steel, Makes
38 & Manufacturers List
Bill of Quantities (BoQ),
Makes & Manufacturers
List, In-house
Architectural Team,
Plumbing Pipes -
UPVC/CPVC/CPC,
Sustainability - Rain
30 Water Harvesting

Bill of Quantities (BoQ),


Makes & Manufacturers
List, Flooring - Glazed
Ceramic Tiles, Flooring -
Vitrified Tiles, Flooring -
Antiskid Vitrified Tiles,
Plumbing Pipes -
UPVC/CPVC/CPC,
Internal - False Ceiling,
Railings - Stainless Steel,
Security - CCTV
Surveillance, Solar
Power Provision,
Sustainability - Sewage
Treatment Plant,
Internal - Split AC
Systems, Sustainability -
Green Building, Flooring
- Granite,
111 Chillers/Cooling Units
Technical Specifications,
Makes & Manufacturers
List, Windows - UPVC,
Flooring - Vitrified Tiles,
Flooring - Glazed
Ceramic Tiles, Flooring -
Antiskid Ceramic Tiles,
Flooring - Antiskid
Vitrified Tiles, Security -
CCTV Surveillance,
Sustainability - Solar
Water Heating, Solar
Power Provision,
Internal - False Ceiling,
In-house Architectural
35 Team

Windows - Aluminium,
Windows - Steel,
Flooring - Vitrified Tiles,
Flooring - Ceramic Tiles,
Internal - False Ceiling,
Sustainability - Rain
Water Harvesting,
Technical Specifications,
Makes & Manufacturers
List, In-house
63 Architectural Team
Technical Specifications,
Makes & Manufacturers
List, Windows - UPVC,
Flooring - Vitrified Tiles,
Flooring - Full Body
Vitrified Tiles, Flooring -
Ceramic Tiles, Security -
CCTV Surveillance, Solar
Power Provision,
Facade - Aluminium
Composite Panels,
Internal - Split AC
Systems, Internal - False
Ceiling, Sustainability -
Sewage Treatment
Plant, Sustainability -
Rain Water Harvesting,
Railings - Stainless Steel,
Sustainability
Registration - GRIHA,
Sustainability - Green
90 Building

Security - CCTV
Surveillance, Internal -
VRV/VRF AC Systems,
Makes & Manufacturers
List, In-house
Architectural Team,
30 Windows - UPVC
Security - CCTV
Surveillance,
Sustainability - Solar
Water Heating, Internal
- VRV/VRF AC Systems,
Sustainability - Sewage
Treatment Plant,
Internal - Split AC
Systems,
Chillers/Cooling Units,
Sustainability - Rain
Water Harvesting,
Sustainability
Registration - GRIHA,
Bill of Quantities (BoQ),
Makes & Manufacturers
List, Technical
Specifications, Plumbing
Pipes -
UPVC/CPVC/CPC,
Internal - False Ceiling,
Contract Conditions
174 (GCC, SCC)

Sustainability
Registration - GRIHA,
Sustainability - Green
Building, Bill of
Quantities (BoQ),
Makes & Manufacturers
List, Flooring - Ceramic
Tiles, Windows - UPVC,
Railings - Stainless Steel,
Plumbing Pipes -
UPVC/CPVC/CPC,
Security - CCTV
Surveillance, Internal -
VRV/VRF AC Systems,
Chillers/Cooling Units,
Sustainability - Sewage
45 Treatment Plant
Contract Conditions
(GCC, SCC), Technical
Specifications,
Sustainability - Sewage
Treatment Plant,
Internal - VRV/VRF AC
Systems, Sustainability -
Rain Water Harvesting,
Windows - Aluminium,
Security - CCTV
Surveillance, Solar
Power Provision,
Sustainability - Green
Building, Major
Upgradation (Railway),
Amrit Bharat Station
Scheme (Railway),
Makes & Manufacturers
330 List
Makes & Manufacturers
List, Technical
1595 Specifications
Sustainability - Green
Building, Contract
Conditions (GCC, SCC),
Sustainability - Sewage
Treatment Plant, Makes
& Manufacturers List,
Solar Power Provision,
Sustainability - Rain
Water Harvesting,
Security - CCTV
Surveillance, Internal -
VRV/VRF AC Systems,
Technical Specifications,
Chillers/Cooling Units,
Major Upgradation
(Railway), Amrit Bharat
Station Scheme
480 (Railway)
Owner - Developer Owner - Developer Owner - Private
Sale Rate
(Private) (Government) Client

Brigade Group St Johns Hospitals

Manipal Health
Enterprises Private
Limited

Yashoda Hospitals

Narayana Hrudayalaya
Limited

Military Engineer
Services (MES)
Military Engineer
Services (MES)
Central Public Works
Department (CPWD)

Karnataka Housing
Board (KHB)
Rail Infrastructure
Development Company
(Karnataka) Limited

Karnataka Housing
Board (KHB)
Military Engineer
Services (MES)

Indian Institute of
Science (IISc) Bangalore
Central Public Works
Department (CPWD)

Military Engineer
Services (MES)
Central Public Works
Department (CPWD)

Central Public Works


Department (CPWD)
Central Public Works
Department (CPWD)

Central Public Works


Department (CPWD)
South Western Railway
Rail Infrastructure
Development Company
(Karnataka) Limited
South Western Railway
Contractor -
Owner - Government Owner - Hospitality Consultant - Design
General/Turnkey
Client Management Architect
Contractor
CMK Projects Private
Limited
Directorate General
Defence Estates

Design Fluid
L&T Constructions

Girish M Swamy
Consultants (GMS)
Aadharshila Designs
Private Limited (ADPL)
S S Chauhan & Sons

Gopal Teknocon Private


Limited
Indian Institute of Tata Consulting
Science (IISc) Bangalore Engineers Limited

Punjab National Bank Jyoti Enterprises Private


(PNB) Limited Rhythm of Space
Employees' State Abirami Engineering
Insurance Corporation Construction and
(ESIC) Company Muralage

Central Power Research Vastunidhi Architectural


Institute Studio
Girdhari Lal Gian P Mathur &
Constructions Private Associates Private
Limited Limited (GPM)
L&T Constructions
Sthapati Designers &
Varindera Constructions Consultants Private
Limited (VCL) Limited
Consultant - Consultant -
Contractor - Civil
Project/Program Plumbing/Public Professional 1
Works
Management (PMC) Health Engineering

Gulam Mohiuddin-
Assistant Vice President
- MEP=Brigade Group-
9686602337-
gulam@brigadegroup.c
om
Thiyagarajan N-Chief
Manager=Manipal
Health Enterprises
Private Limited-
9884300992-
Design Tree Service thiyagarajan.n@manipa
Consultants CKPC Properties lhospitals.com

Mr Suresh-Purchase
Head=Yashoda
Hospitals-7702167474-

Prashanth MG-Senior
Project
Manager=Narayana
Hrudayalaya Limited-
9743479715-

K V Govindarajan-Chief
Engineer=Military
Engineer Services
Shiv Shakti Enterprises (MES)--
Sophia Franklin-Chief
Engineer=Military
Engineer Services
(MES)--
Srinivas V-Executive
Engineer=Central Public
Swaraj Infracon Private Works Department
Limited (CPWD)-9160638520-

Lokeshbabu C G-
Executive Engineer
(South)=Karnataka
Housing Board (KHB)-
Santhosh Buildwel Infra 9886647084-
Private Limited eesouthkhb@gmail.com
Mr Subramanium-
General Manager
Egis India Consulting (Civil)=Rail
Engineers Private Infrastructure
Limited (WME), AECOM Development Company
India Private Limited, (Karnataka) Limited-
Louis Berger Consulting 6364890802-
Private Limited NCC Limited gmcivil1@kride.in

Jagadish B R-Executive
Engineer=Karnataka
Housing Board (KHB)-
Srishti Constructions 9886344619-
Bangalore eeblrurban@gmail.com
Nithin Devadiga-
SMLP Asphalts (SMLP Owner=ND Structures-
Group) 9845138039-

V Rajarajan-
Registrar=Indian
Aeon Integrated Hombale Constructions Institute of Science
Building Design & Estates Private (IISc) Bangalore--
Consultants LLP Limited registrar@iisc.ac.in
Shieney Singhal-
Executive
Engineer=Central Public
Works Department
(CPWD)-9818586304-
eebcd1_cpwd@rediffm
ail.com

J Jeya Packia Selvi-


Additional Assistant
Director
(Contracts)=Military
Engineer Services
(MES)--
Jamal Mohamed
Meyyath-Executive
Engineer and
SM(C)=Central Public
Works Department
Chaudhary Construction (CPWD)-9448974820-
Tata Consulting Company Private bng-
Engineers Limited Limited eesmc@cpwd.gov.in

Shieney Singhal-
Executive
Engineer=Central Public
Works Department
(CPWD)-9818586304-
eebcd1_cpwd@rediffm
ail.com
Santosh Yadav-Project
Architect=Muralage-
9795341134-
kr.santosh@gmail.com

Shieney Singhal-
Executive
Engineer=Central Public
Works Department
Abirami Engineering (CPWD)-9818586304-
Construction and eebcd1_cpwd@rediffm
Company ail.com
Ramasubbaiah B-
Deputy Chief Engineer-
Construction=South
Western Railway-
9731665271-
Voyants Solutions dycecnwbnc@gmail.co
Private Limited m
Mr Subramanium-
General Manager
Egis India Consulting (Civil)=Rail
Engineers Private Infrastructure
Limited (WME), AECOM Rail Vikas Nigam Development Company
India Private Limited, Limited (RVNL), Rithwik (Karnataka) Limited-
Louis Berger Consulting Projects Private Limited 6364890802-
Private Limited Hyderabad gmcivil1@kride.in
Hasib Zaman-Senior
Manager -
Procurement=Varindera
Constructions Limited
(VCL)-9891529077-
hasib@vclgroup.in
Professional 2 Professional 3 Professional 4 Professional 5

Sanjai Joseph-Purchase
Manager-St Johns
Hospitals-9980455077-
sanjai.j@stjohns.in ---- ---- ----

Mr Sudhir-Director-
Mr Navin-Site Engineer- Electrical-Design Tree
CKPC Properties- Service Consultants-
7975814224- 9686032828- ---- ----

---- ---- ---- ----


Arulanandhan Raman-
Senior Manager Gururaj Hebber-
Purchase-Narayana Purchase Head-
Hrudayalaya Limited- Narayana Hrudayalaya
9242820155- Limited-9845731917-
arulanandhan.r@naraya gururaj.hebbar@naraya
nahealth.org nahealth.org ---- ----

Ashish Singhal-Partner-
Shiv Shakti Enterprises-
9414025192- ---- ---- ----
Rajesh Medepalli-
Design Architect- Mr Trinevia-Project
Voyants Solutions Head-CMK Projects
Private Limited- Private Limited-
9177645501- 9512700066- ---- ----
Sunil Kumar Singh-
Partner-Swaraj Infracon
Private Limited-
9811485280-
Pradeep.swaraj@yahoo
.com ---- ---- ----

Mr Nagraj-Purchase
Manager-Santhosh
Buildwel Infra Private
Limited-7019343820- ---- ---- ----
Suresh Kumar Tavva- Shant Kumar-Engineer
Project Manager Bhanu Prakash- Purchase Metro-NCC
Package C6 Sec 4-L&T Purchase Manager-L&T Limited-9480695960-
Constructions- Constructions- shantkumar.sk@nccltd.i
9966718887- 9952991091- n ----

Mr Shivakumar-Owner-
Srishti Constructions
Bangalore-9731222669- ---- ---- ----
Mr Umesh-Authorized Rajendra Kumar-
Signatory-SMLP Director (Contractor)-
Asphalts (SMLP Group)- Military Engineer
9886213563- Services (MES)-
smlpasphalths@gmail.c 9465394730-cezafb2-
om mes@nic.in ---- ----

Raghuraman D-
Jyotimitra Raghuvansh- Girish S S-Executive Purchase Head-
Founding Principal- Tendering And Hombale Constructions
Aadharshila Designs Contracts-Hombale & Estates Private
Private Limited (ADPL)- Constructions & Estates Limited-7892639016-
9811024353- Private Limited- raghuraman.d@hombal
jyotimitra@adpl.in 8884819814- egroup.com ----
Ashok Kumar-Director-S
S Chauhan & Sons-
9999741479- ---- ---- ----

Kanaka Raju-Purchase Ratna Kishore Gopal-


Manager-Gopal Project Manager-Gopal
Teknocon Private Teknocon Private
Limited-7093912559- Limited-9000990302- ---- ----
Parvez Chaudhary- Ismalil Chaudhary-
Director-Chaudhary Director-Chaudhary
Construction Company Construction Company
Private Limited- Private Limited-
9899695644- 9810486786- ---- ----

Ranjit Kumar-Purchase
Manager (Head Office)-
Jyoti Enterprises Private
Limited-9716446325- ---- ---- ----
Satheesh T-Purchase
Rajesh Tomar-Executive Manager-Abirami
Engineer-Central Public Engineering
Works Department Construction and
(CPWD)-9968887911- Company-9659186959- ---- ----

Munish Bajaj-Project
Manager-Vastunidhi Satheesh T-Purchase
Architectural Studio- Manager-Abirami
9818477259- Engineering
munish@vastunidhiarch Construction and
itects.com Company-9659186959- ---- ----
Swati Agarwal-Vice Rishi Mathur-Project
President and Head - Engineer (Railway)-Gian
Architecture and P Mathur & Associates
Project Management- Private Limited (GPM)- Prince Mishra-Purchase
Voyants Solutions 8689890099- Manager-Girdhari Lal
Private Limited- rishi.mathur@gpmindia. Constructions Private
9811160455- com Limited-7042191357- ----
Mr Prem-Manager
Suresh Kumar Tavva- Stores & Purchase Rithwik Ramesh-
Project Manager (Dongri Depot)-Rithwik President - Operations- Bhanu Prakash-
Package C6 Sec 4-L&T Projects Private Limited Rithwik Projects Private Purchase Manager-L&T
Constructions- Hyderabad- Limited Hyderabad- Constructions-
9966718887- 9983471465- 9180333333- 9952991091-
Subham Shrivastava-
Deputy Chief Engineer -
A Pradeep-Chief Construction-South Tanvi Lad-Senior Project
Material Western Railway- Manager-Sthapati
Manager/CN/SBC-South 9731665261- Designers & Consultants
Western Railway- dycecnwbnc@gmail.co Private Limited-
9731665270- m 8460816530- ----
New Lead/ Already
Unique Project ID PSE Comment
Associates

55142

52027

48239

46977

49928
49544
47318

46525
46312

45434
43859

40399
39596

38439
38420

37216
33346

26542
25628
18572
10295

You might also like