0% found this document useful (0 votes)
5 views1 page

Log

Uploaded by

umair.hamed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views1 page

Log

Uploaded by

umair.hamed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ACTION FORM (NC) YMCO

NAME Project Violation Performed Date Status Result of violation Designation Outcome
Damaged manhole and installed duct without informing to qc
Tammam Mohamed CTH and rsg qc 9/3/2025 Open 3 Days salary deduction ElectricalSite Engineer
Excacvation done and installed
tiles as per intruction for cables
Tamam Mohammed CTH Repetative violation not inatlling prtection tiles as per drawing 4/1/2025 Closed 1 Days salary deduction Electrical Ste Engineer safety
Installation of Upstand kerb stone instead of flush kerbstone in
between interlock & asphalt Near LV & HV rooms as highlighted Water flow test done and
Mujahith Amjath CTH at site. Not following Shop drawing 27/01/2025 Closed 3 Days salary deduction Civil Ste Engineer accepted by rsg.
Installing Duct bank against design drawing ( Shop drawing ) not Shop drawing submitted as per
Idrees CDC submitted 2/16/2025 Closed 3 Days salary deduction Electrical Ste Engineer installtion carried out at site