JCD INFR INSPECTION CHECKLIST JCD-INFR IC NUMBER Rev.
No
Final Inspection of Painting work
JCD-INFR-CHEC-QUA-IC-307 0 17-Jul-25
PROJECT TITLE CONTRACT NO.
Main Utilities & Public Realm (Insfrastructure) 440011
LOCATION
LAYOUT DRAWING NUMBER REV- NO. PURCHASE ORDER NUMBER
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP.
JCD CHEC ITP NUMBER JCD ITP MUPR ACTIVITY ITP NUMBER
CONTRACTOR INSPECTION LEVEL JCD QLT INSPECTION LEVEL
H H
ITEM ACCEPTANCE CRITERIA REFERENCE PASS
No.
Paint surfaces behind movable equipment and furniture same Project
A1
as similar exposed surfaces. Before final installation, paint Specifications-
surfaces behind permanently fixed equipment or furniture with 099600,
prime coat only. 099123 & 099113
Project
Paint front and backsides of access panels, removable or
Specifications-
A2 hinged covers, and similar hinged items to match exposed
099600,
surfaces.
099123 & 099113
Project
Specifications-
A3 Cured film has a uniform paint finish, color, and appearance.
099600,
099123 & 099113
Project
Surface films without cloudiness, spotting, holidays, laps, brush
Specifications-
A4 marks, roller tracking, runs, sags, ropiness, or other surface
099600,
imperfections. Cut in sharp lines and color breaks.
099123 & 099113
Project
A5
At completion of construction activities of other trades, touch up Specifications-
and restore damaged or defaced painted surfaces. 099600,
099123 & 099113
Project
A6
Dry Film Thickness (DFT) is as per the paint manufacturer's Specifications-
recommendations. 099600,
099123 & 099113
REFERENCE DOCUMENTS:
1. Project Specifications-099600, 099123. 099113.
2. Manufacturer's Recommendation
Contractor / Third-Party Jeddah Central Development Company
Construction Representative* Construction Representative
Work is Complete and Ready for Inspection: T&I Witnessed
Name, Initials and
Name, Initials and Date:
Date:
QC Inspector QA Inspector
Performe Work / Rework May Proceed T&I Witnessed
d
Name, Initials and
Inspectio Name, Initials and Date:
Date:
n
QC Supervisor QA Supervisor
Quality Record Approved: T&I Witnessed
Name, Sign and
Name, Initials and Date:
Date:
Person Responsible for Complition of Quality Work / Test
PREPARED RFI NUMBER
DATE
17-Jul-25
CONTRACTOR / SUBCONTRACTOR
CHEC
EC / PMCC / MCC NO.
RFI
ACCEPTED
REJECTED
FAIL N/A REMARKS
Company
QC Record Reviewed Work Verified
QC Record Reviewed Work Verified
QC Record Reviewed Work Verified
Y=YES N=NO F=FAILED