Lifting Silo Foundation

The document outlines the lifting plan for a cement silo foundation, detailing the load specifications, crane requirements, and site layout. It specifies a total load of 35 tons with a 10% load factor and includes dimensions for the foundation and crane operation. Additionally, it provides a utility schedule and a disclaimer regarding misinterpretation of the drawing.

Uploaded by

mohammed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views1 page

Lifting Silo Foundation

The document outlines the lifting plan for a cement silo foundation, detailing the load specifications, crane requirements, and site layout. It specifies a total load of 35 tons with a 10% load factor and includes dimensions for the foundation and crane operation. Additionally, it provides a utility schedule and a disclaimer regarding misinterpretation of the drawing.

Uploaded by

mohammed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

LOAD

FOUNDATION [ CEMENT SILO -2]

+ TON W
PARCEL CORNER COORDINATES

+ TON / HOOK S
N
CORNER
1
2
EAST NORTH

+ TON / SHACKLE & WEBBING SLING E


3
4
4

PART: FOUNDATION [ CEMENT SILO -2 ]


TOTAL: LOAD = 35.00 TON
+ TON
= TON [ + 10% LOAD FACTOR ] DIM.
TOTAL WEIGHT = TON L= 4000 MM
W= 4000 MM
W= 800 / 700 = 1500 MM
CRANE SANY - SAC 1800
KEY PLAN
NOT TO SCALE

- BOOM LENGTH = Mtr PLOT No. :

LOCATION :
0081E00005
DUBA

- OPERATING RADIUS = Mtr


SCHEDULE OF SET BACK
- CHART CAPACITY = Ton LENGTH
NORTH
00.00 M
EAST WEST
00.00 M 00.00 M
SOUTH
00.00 M

- % OF CHART CAPACITY = % 75% TRAILER


SETBACK
PERCENTA.
00.00 M 00.00 M 00.00 M 00.00 M

LAND UTILITY SCHEDULE

PERCENTAGE
DESCRIPTION AREA BLDG. HEIGHTS TOTAL AREA
BUILT AREA: ----- M² -- --%
SID WAKE AREA ----- M² --
CAR PARKING AREA ----- M² -- -- %
LOADING / UNLOADING AREA ----- M² --
GREEN AREA: ----- M² --
SET BACKS/ASPHALT ROAD AREA : ----- M² --
PRODUCTION BUILDING ----- M² --
STORAGE AREA ----- M² --

TOTAL LOT 40,000 M² -- 100.00 %

LEGEND:
SYMBOL DESCRIPTION:

PART-2

POSITION

WE ARE LIABLE FOR ANY


MISINTERPRETATION REFLECTED HEREIN.
DISCLAIMER : ALKIFAH WILL TAKE FULL
RESPONSIBILITIES FOR EVERY ACTIONS
INTERPRETED IN THE DRAWING.

CRANE - SAC 1800


LIFTING PLAN
Architectural M.AMER
Structural M.AMER
Electrical
Sanitary
Mechanical M.AMER
Date: Revision:
MO-DAY-YR Rev.01 DESCRIPTION CHECKED BY APRVD.
MO-DAY-YR Rev.01
MO-DAY-YR Rev.01 MO-DAY-YR MO-DAY-YR

ACCESSORIES MO-DAY-YR
PROJECT LOCATION:
Rev.01 Checked Approved

- 10X10 WEBBING SLING - 4No 3D VIEW CONTRACT CLIENT :


NUMBER:

DOUBLE BACK TO CRANE HOOK BLOCK BLOCK :

LOT NO. 0081E00005 LOT AREA

AGREEMENT NO: FILE NO

- LIFTING CLUTCH - 4No AS PER LIFTING LUG SHEET CONTENTS

Scale: DWG NO. SHT. NO.

1/1 AR-00 1/1

KRB TECHNICAL SUPPORT ENGINEERING DEPARTMENT KRB TECHNICAL SUPPORT ENGINEERING DEPARTMENT