EPC CONTRACTOR : PREMIER SOLAR POWERTECH PVT. LTD.
2018
Project - 100MW solar PV project in Tamilnadu
Ref. LOA No. CO CONTS/S709PRMIER/S709PRMIER/2018 Dt.: 04/04/2018
NLC NLC
Drawing No. Drawing Title Category Division System Equipment R0 R1 NLC COMMENTS R2 NLC COMMENTS NLC COMMENTS
COMMENTS COMMENTS R3 R4
PSPT_NLC100_2018_19_E_R000_001 Design Basis Report (Annual Energy Yield for 25 Years, PV Syst Report, Shadow Analysis Report ) Information Electrical TN709 General 23.01.2019 24.01.2019 28.01.2019 08.02.2019 01.03.2019
PSPT_NLC100_2018_19_E_R000_002 Power Evacuation Scheme Information Electrical TN709 General
PSPT_NLC100_2018_19_E_R000_003 Soil Resistivity Reports Information Electrical TN709 General 08.01.2019 21.01.2019 21.01.2019 25.01.2019 06.02.2019 08.02.2019 10.02.2019 19.02.2019
PSPT_NLC100_2018_19_E_R000_004 Electrical System Calculation & Parameters of PV Plant Information Electrical TN709 General 22.01.2019 07.02.2019 26.02.2019 27.02.2019 01.03.2019 02.03.2019
PSPT_NLC100_2018_19_E_R000_005 DC Single Line Diagram & Capacity Calculation Approval Electrical TN709 General 16.11.2018 19.11.2018 29.01.2019 31.01.2019 02.02.2019 08.02.2019
PSPT_NLC100_2018_19_E_R000_006 AC Single Line Diagram Approval Electrical TN709 General 16.11.2018 19.11.2018 08.01.2019 11.01.2019 05.02.2019 08.02.2019
PSPT_NLC100_2018_19_E_R000_007 Equipment Layout - PCSS Room Approval Electrical TN709 General 23.01.2019 05.02.2019 06.02.2019 12.02.2019
PSPT_NLC100_2018_19_E_R000_008 Equipment Layout - PESS Room Approval Electrical TN709 General 22.01.2019 29.01.2019 30.01.2019 31.01.2019
PSPT_NLC100_2018_19_E_R000_009 PV Modules - Vendor 1 - GTP, GA, vendor document and Type Test Certificates, MQP Approval Electrical TN709 PV Modules
PSPT_NLC100_2018_19_E_R000_010 PV Modules - Vendor 2 - GTP, GA, vendor document and Type Test Certificates, MQP Approval Electrical TN709 PV Modules
PSPT_NLC100_2018_19_E_R000_011 PV Modules - Vendor 3 - GTP, GA, vendor document and Type Test Certificates, MQP Approval Electrical TN709 PV Modules
PSPT_NLC100_2018_19_E_R000_012 PV Modules - Vendor 4 - GTP, GA, vendor document and Type Test Certificates, MQP Approval Electrical TN709 PV Modules
PSPT_NLC100_2018_19_E_R000_013 PV Modules - Vendor 5 - GTP, GA, vendor document and Type Test Certificates, MQP Approval Electrical TN709 PV Modules
PSPT_NLC100_2018_19_E_R000_014 PV Modules - Vendor 6 - GTP, GA, vendor document and Type Test Certificates, MQP Approval Electrical TN709 PV Modules
PSPT_NLC100_2018_19_E_R000_015 DC solar Cables (EBC) - Sizing & Drop calculation Approval Electrical TN709 DC Solar Cable 22.01.2019 02.02.2019 04.02.2019 05.02.2019
PSPT_NLC100_2018_19_E_R000_016 DC solar Cables (EBC) - GTP, GA, vendor document and Type Test Certificates Approval Electrical TN709 DC Solar Cable 01.03.2019 02.03.2019
PSPT_NLC100_2018_19_E_R000_017 DC solar Cables (EBC) - MQP Approval Electrical TN709 DC Solar Cable 01.03.2019
PSPT_NLC100_2018_19_E_R000_018 DC solar Cables (EBC) - Schedule Information Electrical TN709 DC Solar Cable
PSPT_NLC100_2018_19_E_R000_019 String Combiner Box - GTP, GA, Schematic Diagrams, vendor document and Type Test Certificates Approval Electrical TN709 SCB 07.02.2019 08.02.2019 11.02.2019 12.02.2019
PSPT_NLC100_2018_19_E_R000_020 String Combiner Box - MQP Approval Electrical TN709 SCB 07.02.2019 08.02.2019 11.02.2019 12.02.2019
PSPT_NLC100_2018_19_E_R000_021 DC Cable (SCB to Inverter) - Sizing & Drop calculation Approval Electrical TN709 DC Cable 22.01.2019 02.02.2019 04.02.2019 05.02.2019 06.02.2019 15.02.2019
PSPT_NLC100_2018_19_E_R000_022 DC Cable (SCB to Inverter) - GTP, GA, vendor document and Type Test Certificates Approval Electrical TN709 DC Cable 01.03.2019
PSPT_NLC100_2018_19_E_R000_023 DC Cable (SCB to Inverter) - MQP Approval Electrical TN709 DC Cable
PSPT_NLC100_2018_19_E_R000_024 DC Cable (SCB to Inverter) - Schedule Information Electrical TN709 DC Cable
PSPT_NLC100_2018_19_E_R000_025 DC Cables - Overall Cable Routing Layout & Trench Details Information Electrical TN709 DC Cable
PSPT_NLC100_2018_19_E_R000_026 Inverter - GTP, GA, Schematic Diagrams, vendor document and Type Test Certificates Approval Electrical TN709 Inverter 09.01.2019 21.01.2019 23.01.2019 29.01.2019 04.03.2019
PSPT_NLC100_2018_19_E_R000_027 Inverter - MQP Approval Electrical TN709 Inverter 09.01.2019 21.01.2019
PSPT_NLC100_2018_19_E_R000_028 AC LT Power Cables - Sizing & Drop calculation Approval Electrical TN709 AC LT Cable 22.01.2019 05.02.2019 06.02.2019 15.02.2019 26.02.2019 02.03.2019 05.03.2019
PSPT_NLC100_2018_19_E_R000_029 AC LT Power Cables - GTP, GA, vendor document and Type Test Certificates Approval Electrical TN709 AC LT Cable 01.03.2019
PSPT_NLC100_2018_19_E_R000_030 AC LT Power Cables - MQP Approval Electrical TN709 AC LT Cable
PSPT_NLC100_2018_19_E_R000_031 AC LT Power Cables - Schedule Information Electrical TN709 AC LT Cable
PSPT_NLC100_2018_19_E_R000_032 Inverter Power Transformer -GTP, GA, Schematic Diagrams, vendor document and Type Test Certificates Approval Electrical TN709 Inverter Transformer 06.02.2019 13.02.2019 16.02.2019 19.02.2019
PSPT_NLC100_2018_19_E_R000_033 Inverter Transformer - MQP Approval Electrical TN709 Inverter Transformer 06.02.2019 10.02.2019 10.02.2019 13.02.2019
PSPT_NLC100_2018_19_E_R000_034 Inverter Transformer - Fire Protection System GTP, GA, vendor documents & MQP Approval Electrical TN709 Inverter Transformer
PSPT_NLC100_2018_19_E_R000_035 AC HT Power Cables - Sizing & Drop calculation Approval Electrical TN709 AC HT Cable 22.01.2019 07.02.2019 07.02.2019 14.02.2019
PSPT_NLC100_2018_19_E_R000_036 AC HT Power Cables - GTP, GA, vendor document and Type Test Certificates Approval Electrical TN709 AC HT Cable 01.03.2019
PSPT_NLC100_2018_19_E_R000_037 AC HT Power Cables - MQP Approval Electrical TN709 AC HT Cable
PSPT_NLC100_2018_19_E_R000_038 AC HT Power Cables - Schedule Information Electrical TN709 AC HT Cable
PSPT_NLC100_2018_19_E_R000_039 AC HT & LT Power Cables - Overall Cable Routing Layout & Trench Detail Information Electrical TN709 AC HT Cable
PSPT_NLC100_2018_19_E_R000_040 HT Switch Board/Switch Gear - GTP, GA, Vendor documents and Type Test Reports for CB & Enclosoure. Approval Electrical TN709 HT Switch Gear 01.03.2019 02.03.2019
PSPT_NLC100_2018_19_E_R000_041 HT Switch Board/Switch Gear - GTP, GA, Vendor documents and Type Test Reports for Accessories. Approval Electrical TN709 HT Switch Gear 01.03.2019 02.03.2019
PSPT_NLC100_2018_19_E_R000_042 HT Switch Board/Switch Gear - GA, Schematic Diagram for all type of verticals (IC/OG/BC/Bus PT etc) Approval Electrical TN709 HT Switch Gear 01.03.2019 02.03.2019
along with Earthing Scheme for PCSS, PESS etc.
PSPT_NLC100_2018_19_E_R000_043 HT Switch Board/Switch Gear with Accessories - MQP Approval Electrical TN709 HT Switch Gear 01.03.2019
PSPT_NLC100_2018_19_E_R000_044 Auxiliary Transformers for PESS, PCSS Etc - Sizing Calculation Approval Electrical TN709 Aux. Supply 01.02.2019 08.02.2019 10.02.2019 14.02.2019
PSPT_NLC100_2018_19_E_R000_045 Auxiliary supply System for PESS, PCSS Etc - SLD Approval Electrical TN709 Aux. Supply 01.02.2019 08.02.2019 12.02.2019 14.02.2019
PSPT_NLC100_2018_19_E_R000_046 Auxiliary Transformer for PCSS Etc - GTP, GA and vendor documents Approval Electrical TN709 Aux. Supply
PSPT_NLC100_2018_19_E_R000_047 Auxiliary Transformer for PCSS Etc - MQP Approval Electrical TN709 Aux. Supply
PSPT_NLC100_2018_19_E_R000_048 Auxiliary Transformer for PESS - GTP, GA and vendor documents Approval Electrical TN709 Aux. Supply 23.02.2019 26.02.2019
PSPT_NLC100_2018_19_E_R000_049 Auxiliary Transformer for PESS - MQP Approval Electrical TN709 Aux. Supply 23.02.2019 26.02.2019
PSPT_NLC100_2018_19_E_R000_050 UPS for PESS, PCSS Etc - Sizing Calculation including Battery capacity Approval Electrical TN709 UPS -PCSS 04.02.2019 05.02.2019 07.02.2019 08.02.2019
PSPT_NLC100_2018_19_E_R000_051 UPS for PESS, PCSS Etc - GTP, GA & vendor documents Approval Electrical TN709 UPS -PCSS
PSPT_NLC100_2018_19_E_R000_052 UPS for PESS, PCSS Etc - MQP Approval Electrical TN709 UPS -PCSS
PSPT_NLC100_2018_19_E_R000_053 DC System with Batteries for PESS, PCSS Etc - Sizing Calculation Approval Electrical TN709 Control DC System
PSPT_NLC100_2018_19_E_R000_054 DC System with Batteries for PESS, PCSS Etc - GTP, GA & vendor documents and DCDB details. Approval Electrical TN709 Control DC System
PSPT_NLC100_2018_19_E_R000_055 DC System with Batteries for PESS, PCSS Etc - MQP Approval Electrical TN709 Control DC System
PSPT_NLC100_2018_19_E_R000_056 Lightning arrestors of PV Array - Design calculation Approval Electrical TN709 LA 22.01.2019 29.01.2019 04.02.2019 08.02.2019
PSPT_NLC100_2018_19_E_R000_057 Lightning arrestors of PV Array - GTP, GA & vendor documents Approval Electrical TN709 LA 12.02.2019 13.02.2019 23.02.2019 26.02.2019
PSPT_NLC100_2018_19_E_R000_058 Layout for Overall Lightning Protection Approval Electrical TN709 LA
PSPT_NLC100_2018_19_E_R000_059 Lighting system PCSS etc - Design & Luminaire details. Approval Electrical TN709 Lighting
PSPT_NLC100_2018_19_E_R000_060 Lighting system PCSS etc - Layout Approval Electrical TN709 Lighting
PSPT_NLC100_2018_19_E_R000_061 Lighting system PESS - Design & Luminaire details Approval Electrical TN709 Lighting
PSPT_NLC100_2018_19_E_R000_062 Lighting system PESS - Layout Approval Electrical TN709 Lighting
PSPT_NLC100_2018_19_E_R000_063 Lighting system security building and Watch Tower - Design & Luminaire details Approval Electrical TN709 Lighting
PSPT_NLC100_2018_19_E_R000_064 Lighting system security building and Watch Tower - Layout Approval Electrical TN709 Lighting
PSPT_NLC100_2018_19_E_R000_065 Lighting system Outdoor Yard and Roads - Design & Luminaire details. Approval Electrical TN709 Lighting
PSPT_NLC100_2018_19_E_R000_066 Lighting system Outdoor Yard and Roads - Layout Approval Electrical TN709 Lighting
PSPT_NLC100_2018_19_E_R000_067 AC Earthing for PESS, PCSS Etc. - Design calculation with Touch & Step potential Verification Approval Electrical TN709 Earthing
PSPT_NLC100_2018_19_E_R000_068 AC Earthing PCSS Etc - GA and Layout Approval Electrical TN709 Earthing
PSPT_NLC100_2018_19_E_R000_069 AC Earthing PESS - GA and Layout Approval Electrical TN709 Earthing
PSPT_NLC100_2018_19_E_R000_070 DC Earthing for PV Array & SCB - Design calculation with Touch & Step potential Verification Approval Electrical TN709 Earthing
PSPT_NLC100_2018_19_E_R000_071 DC Earthing for PV Array & SCB- GA and Layout Approval Electrical TN709 Earthing
PSPT_NLC100_2018_19_E_R000_072 AC DB - GTP, GA, vendor documents, SLD & Schematics Approval Electrical TN709 Aux. Supply
PSPT_NLC100_2018_19_E_R000_073 AC DB - MQP Approval Electrical TN709 Aux. Supply
PSPT_NLC100_2018_19_E_R000_074 SCADA - Configuration /Architecture Diagram with list of I/O signals Approval Electrical TN709 SCADA 12.02.2019 13.02.2019 13.02.2019 18.02.2019 23.02.2019 23.02.2019 26.02.2019 26.02.2019
PSPT_NLC100_2018_19_E_R000_075 SCADA - Vendor Documents, GA drawing & Schematics Approval Electrical TN709 SCADA
PSPT_NLC100_2018_19_E_R000_076 SCADA - MQP Approval Electrical TN709 SCADA 15.02.2019 18.02.2019
PSPT_NLC100_2018_19_E_R000_077 Control and Communication Cables - GTP, GA and vendor documents Approval Electrical TN709 Comm Cables
PSPT_NLC100_2018_19_E_R000_078 Control and Communication Cables - MQP Approval Electrical TN709 Comm Cables
PSPT_NLC100_2018_19_E_R000_079 Control and Communication Cables - Schedule Information Electrical TN709 Comm Cables
PSPT_NLC100_2018_19_E_R000_080 IP Telecom System - Block Diagram, GTP, GA & Vendor Documents Approval Electrical TN709 IP Telecom
PSPT_NLC100_2018_19_E_R000_081 Weather monitoring System - GTP, GA and vendor documents Approval Electrical TN709 WMS
PSPT_NLC100_2018_19_E_R000_082 Weather monitoring System - MQP Approval Electrical TN709 WMS
PSPT_NLC100_2018_19_E_R000_083 Fire Detection Alarm System - MFA panel & Repeater panel and other accessories - GTP, GA, Approval Electrical TN709 FDA
Schematic Diagram , Layout vendor documents.
PSPT_NLC100_2018_19_E_R000_084 Fire protection system - DCP fire extinguisher and Clean agent gas extinguishing system etc. - GTP and Information Electrical TN709 FDA
vendor documents
PSPT_NLC100_2018_19_E_R000_085 ABT Metering System with CT and PT for each O/G feeders @ PESS - GTP, GA and Scheme, Type test Approval Electrical TN709 Metering
certificates
PSPT_NLC100_2018_19_E_R000_086 ABT Metering System with CT and PT - MQP Approval Electrical TN709 Metering
PSPT_NLC100_2018_19_E_R000_087 AC Works - FQP Approval Electrical TN709 Field 30.01.2019 07.02.2019 15.02.2019 18.02.2019
PSPT_NLC100_2018_19_E_R000_088 DC Works - FQP Approval Electrical TN709 Field 30.01.2019 07.02.2019 15.02.2019 18.02.2019
PSPT_NLC100_2018_19_E_R000_089 TANGEDCO approved drawings for the Project - set 1 Information Electrical TN709 Evacuation
PSPT_NLC100_2018_19_E_R000_090 TANGEDCO approved drawings for the Project - set 2 Information Electrical TN709 Evacuation
PSPT_NLC100_2018_19_E_R000_091 For Future Use Approval Electrical TN709 Reserve
PSPT_NLC100_2018_19_E_R000_092 For Future Use Approval Electrical TN709 Reserve
PSPT_NLC100_2018_19_E_R000_093 For Future Use Approval Electrical TN709 Reserve
PSPT_NLC100_2018_19_E_R000_094 For Future Use Approval Electrical TN709 Reserve
PSPT_NLC100_2018_19_E_R000_095 For Future Use Approval Electrical TN709 Reserve
PSPT_NLC100_2018_19_E_R000_096 For Future Use Approval Electrical TN709 Reserve
PSPT_NLC100_2018_19_E_R000_097 For Future Use Approval Electrical TN709 Reserve
PSPT_NLC100_2018_19_E_R000_098 For Future Use Approval Electrical TN709 Reserve
PSPT_NLC100_2018_19_E_R000_099 For Future Use Approval Electrical TN709 Reserve
PSPT_NLC100_2018_19_E_R000_100 Contract Award volumes Information Electrical TN709 Contract
PSPT_NLC100_2018_19_C_R000_101 Topographical survey Approval Civil TN709 Preliminary civil 13.02.2019 21.02.2019
PSPT_NLC100_2018_19_C_R000_102 Overall plant layout Approval Civil TN709 Preliminary civil 24.01.2019 31.01.2019 12.02.2019 13.02.2019 24.02.2019 25.02.2019 27.02.2019
PSPT_NLC100_2018_19_C_R000_103 Soil investigation report Approval Civil TN709 Preliminary civil 20.11.2018 03.12.2018 08.01.2019 10.01.2019 21.01.2019 02.02.2019 06.02.2019 08.02.2019 10.02.2019 12.02.2019
PSPT_NLC100_2018_19_C_R000_104 Design Basis Report (DBR) - Civil works Approval Civil TN709 Preliminary civil 04.01.2019 11.01.2019 24.01.2019 29.01.2019
PSPT_NLC100_2018_19_C_R000_105 Field Quality Plan for Civil works (FQP) Approval Civil TN709 Preliminary civil 25.01.2019 06.02.2019 07.02.2019 12.02.2019
PSPT_NLC100_2018_19_C_R000_106 Internal road & Approach road cross section details Approval Civil TN709 Aux. Civil Structure 07.01.2019 18.01.2019 28.01.2019 29.01.2019 07.02.2019 12.02.2019
PSPT_NLC100_2018_19_C_R000_107 Peripheral road cross section details Approval Civil TN709 Aux. Civil Structure 07.01.2019 18.01.2019 28.01.2019 29.01.2019 07.02.2019 12.02.2019
PSPT_NLC100_2018_19_C_R000_108 Road layout Approval Civil TN709 Aux. Civil Structure
PSPT_NLC100_2018_19_C_R000_109 Peripheral Fencing Details Approval Civil TN709 Aux. Civil Structure 07.01.2019 21.01.2019 23.01.2019 28.01.2019
PSPT_NLC100_2018_19_C_R000_110 Fencing & Gate details for Inverter duty transformer Approval Civil TN709 Aux. Civil Structure
PSPT_NLC100_2018_19_C_R000_111 Overall fencing layout/coordinates Approval Civil TN709 Aux. Civil Structure
PSPT_NLC100_2018_19_C_R000_112 Main gate & wicket gate details Approval Civil TN709 Aux. Civil Structure
PSPT_NLC100_2018_19_C_R000_113 Stormwater drain layout Approval Civil TN709 Aux. Civil Structure
PSPT_NLC100_2018_19_C_R000_114 Storm water drain cross section details Approval Civil TN709 Aux. Civil Structure
PSPT_NLC100_2018_19_C_R000_115 Storm water drain design document Approval Civil TN709 Aux. Civil Structure
PSPT_NLC100_2018_19_C_R000_116 Security cabin - Architectural details Approval Civil TN709 Aux. Civil Structure 31.01.2019 05.02.2019 13.02.2019 15.02.2019 16.02.2019 20.02.2019
PSPT_NLC100_2018_19_C_R000_117 Security cabin - Foundation & Structural details Approval Civil TN709 Aux. Civil Structure 31.01.2019 06.02.2019 13.02.2019 15.02.2019 16.02.2019 18.02.2019
PSPT_NLC100_2018_19_C_R000_118 Security cabin - Septic tank & soak pit details Approval Civil TN709 Aux. Civil Structure 31.01.2019 05.02.2019 13.02.2019 21.02.2019
PSPT_NLC100_2018_19_C_R000_119 Security cabin - Coordinate layout Approval Civil TN709 Aux. Civil Structure
PSPT_NLC100_2018_19_C_R000_120 Watch Tower - Architectural details Approval Civil TN709 Aux. Civil Structure
PSPT_NLC100_2018_19_C_R000_121 Watch Tower - Foundation and structural details Approval Civil TN709 Aux. Civil Structure
PSPT_NLC100_2018_19_C_R000_122 Watch Tower - Coordinate layout Approval Civil TN709 Aux. Civil Structure
PSPT_NLC100_2018_19_C_R000_123 Two wheeler/Four wheeler Parking shed Approval Civil TN709 Aux. Civil Structure
PSPT_NLC100_2018_19_C_R000_124 Module Cleaning system - Design document Approval Civil TN709 Aux. Civil Structure
PSPT_NLC100_2018_19_C_R000_125 Module cleaning system - Pipeline netwrok details Approval Civil TN709 Aux. Civil Structure
PSPT_NLC100_2018_19_C_R000_126 Landscaping layout details Approval Civil TN709 Aux. Civil Structure
PSPT_NLC100_2018_19_C_R000_127 Sign board - Structure and foundation details Approval Civil TN709 Aux. Civil Structure 31.01.2019 05.02.2019
PSPT_NLC100_2018_19_C_R000_128 Door, window, ventilator & rolling shutter details Approval Civil TN709 Aux. Civil Structure 28.02.2019 01.03.2019
PSPT_NLC100_2018_19_C_R000_129 Module Mounting Structure - Design document Approval Civil TN709 MMS 03.01.2019 09.01.2019 19.01.2019 25.01.2019 28.01.2019 30.01.2019
PSPT_NLC100_2018_19_C_R000_130 Module Mounting Structure (MMS)- General Arrangement details (Type I) Approval Civil TN709 MMS 03.01.2019 09.01.2019 19.01.2019 25.01.2019 29.01.2019 31.01.2019
PSPT_NLC100_2018_19_C_R000_131 Module Mounting Structure (MMS)- General Arrangement details (Type II) Approval Civil TN709 MMS
PSPT_NLC100_2018_19_C_R000_132 Module Mounting Structure (MMS)- General Arrangement details (Type III) Approval Civil TN709 MMS
PSPT_NLC100_2018_19_C_R000_133 MMS Coordinate layout Approval Civil TN709 MMS 26.02.2019 27.02.2019 27.02.2019 02.03.2019
PSPT_NLC100_2018_19_C_R000_134 Pile test report (Pullout and lateral load test) Approval Civil TN709 MMS 02.01.2019 04.01.2019 04.01.2019 05.01.2019 23.01.2019 29.01.2019 29.01.2019 30.01.2019
PSPT_NLC100_2018_19_C_R000_135 MMS - Fabrication details (Type I) Approval Civil TN709 MMS 21.01.2019 28.01.2019 28.01.2019 31.01.2019 25.02.2019 26.02.2019
PSPT_NLC100_2018_19_C_R000_136 MMS - Fabrication details (Type II) Approval Civil TN709 MMS
PSPT_NLC100_2018_19_C_R000_137 MMS - Fabrication details (Type III) Approval Civil TN709 MMS
PSPT_NLC100_2018_19_C_R000_138 Module Mounting Structure (MMS)- Foundation details Approval Civil TN709 MMS 30.01.2019 05.02.2019 13.02.2019 14.02.2019 15.02.2019 16.02.2019
PSPT_NLC100_2018_19_C_R000_139 MMS- Manufacturing Quality Plan (MQP) Approval Civil TN709 MMS 08.02.2019 12.02.2019 15.02.2019 18.02.2019
PSPT_NLC100_2018_19_C_R000_140 MMS- Field Quality Plan for Civil works (FQP) Approval Civil TN709 MMS 25.01.2019 05.02.2019 11.02.2019 14.02.2019
PSPT_NLC100_2018_19_C_R000_141 PCSS Building - Design document Approval Civil TN709 PCSS/PEB
PSPT_NLC100_2018_19_C_R000_142 PCSS - Coordinate layout Approval Civil TN709 PCSS/PEB
PSPT_NLC100_2018_19_C_R000_143 PCSS Building- Architectural details Approval Civil TN709 PCSS/PEB 23.02.2019 25.02.2019
PSPT_NLC100_2018_19_C_R000_144 PCSS Building - Foundation details Approval Civil TN709 PCSS/PEB
PSPT_NLC100_2018_19_C_R000_145 PCSS Building - Structural details Approval Civil TN709 PCSS/PEB
PSPT_NLC100_2018_19_C_R000_146 PCSS Building - Cable Trench details Approval Civil TN709 PCSS/PEB
PSPT_NLC100_2018_19_C_R000_147 PESS Building - Design document Approval Civil TN709 PESS 20.02.2019 25.02.2019
PSPT_NLC100_2018_19_C_R000_148 PESS - Coordinate layout Approval Civil TN709 PESS 26.02.2019 26.02.2019 26.02.2019 27.02.2019 27.02.2019 28.02.2019
PSPT_NLC100_2018_19_C_R000_149 PESS Building- Architectural details Approval Civil TN709 PESS 06.02.2019 08.02.2019 16.02.2019 18.02.2019
PSPT_NLC100_2018_19_C_R000_150 PESS Building - Foundation details Approval Civil TN709 PESS 20.02.2019 25.02.2019 27.02.2019 01.03.2019
PSPT_NLC100_2018_19_C_R000_151 PESS Building - Plinth beam details Approval Civil TN709 PESS 26.02.2019 28.02.2019
PSPT_NLC100_2018_19_C_R000_152 PESS Building - Staircase details Approval Civil TN709 PESS 26.02.2019 02.03.2019
PSPT_NLC100_2018_19_C_R000_153 PESS Building - Lintel beam & roof beam details Approval Civil TN709 PESS
PSPT_NLC100_2018_19_C_R000_154 PESS Building - Roof slab details Approval Civil TN709 PESS
PSPT_NLC100_2018_19_C_R000_155 PESS Building - Septic tank & soak pit details Approval Civil TN709 PESS 26.02.2019
PSPT_NLC100_2018_19_C_R000_156 PESS Building - Cable trench details Approval Civil TN709 PESS
PSPT_NLC100_2018_19_C_R000_157 String Monitoring Unit (SMU) - Foundation & Structural details Approval Civil TN709 Elec. Equip. Support 01.03.2019 02.03.2019
PSPT_NLC100_2018_19_C_R000_158 Weather Monitoring Unit (WMU) - Foundation details Approval Civil TN709 Elec. Equip. Support
PSPT_NLC100_2018_19_C_R000_159 Inverter Duty Transformer (IDT) - Foundation details & Burnt oil pit details. Approval Civil TN709 Elec. Equip. Support
PSPT_NLC100_2018_19_C_R000_160 Auxilliary Transformer - Foundation details Approval Civil TN709 Elec. Equip. Support 26.02.2019 27.02.2019
PSPT_NLC100_2018_19_C_R000_161 Firewall details Approval Civil TN709 Elec. Equip. Support
PSPT_NLC100_2018_19_C_R000_162 Lighting post foundation details Approval Civil TN709 Elec. Equip. Support
PSPT_NLC100_2018_19_C_R000_163 Lightning Arrestor foundation details Approval Civil TN709 Elec. Equip. Support 23.02.2019 25.02.2019
PSPT_NLC100_2018_19_C_R000_164 MMS Fabrication Details - Front leg/Back leg Approval Civil TN709 Future Civil 29.01.2019 30.01.2019
PSPT_NLC100_2018_19_C_R000_165 MMS Manufacturing Quality Plan (for TATA) Approval Civil TN709 Future Civil 08.02.2019 12.02.2019 19.02.2019 20.02.2019
PSPT_NLC100_2018_19_C_R000_166 For Future Civil Use Approval Civil TN709 Future Civil
PSPT_NLC100_2018_19_C_R000_167 For Future Civil Use Approval Civil TN709 Future Civil
PSPT_NLC100_2018_19_C_R000_168 For Future Civil Use Approval Civil TN709 Future Civil
PSPT_NLC100_2018_19_C_R000_169 For Future Civil Use Approval Civil TN709 Future Civil
PSPT_NLC100_2018_19_C_R000_170 For Future Civil Use Approval Civil TN709 Future Civil
PSPT_NLC100_2018_19_C_R000_171 For Future Civil Use Approval Civil TN709 Future Civil
PSPT_NLC100_2018_19_C_R000_172 For Future Civil Use Approval Civil TN709 Future Civil
PSPT_NLC100_2018_19_C_R000_173 For Future Civil Use Approval Civil TN709 Future Civil
PSPT_NLC100_2018_19_C_R000_174 For Future Civil Use Approval Civil TN709 Future Civil
PSPT_NLC100_2018_19_C_R000_175 For Future Civil Use Approval Civil TN709 Future Civil