PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
Table of Contents
1. INTRODUCTION.........................................................................................................................................5
1.1. Purpose of the Document........................................................................................................................7
1.2. Crucial Factors & Steps in Decision Making for Investment.................................................................7
2. Objectives of the project................................................................................................................................7
2.1. General Objectives...................................................................................................................................7
2.2. Specific Objective...................................................................................................................................8
2.3. Profile of the Promoter................................................................................................................................8
2.4. The Economic Significance of the Project..................................................................................................9
2.5. Location and Premises Required..............................................................................................................10
3. MARKET STUDY.......................................................................................................................................11
3.1. Scope of the Market Study....................................................................................................................11
3.2. Future Market Demand.........................................................................................................................11
3.3. Past Demand.........................................................................................................................................12
3.4. Forecasted Demand..............................................................................................................................12
3.5. Market Supply.......................................................................................................................................14
3.6. Target Customers..................................................................................................................................15
3.7. Market Prospects..................................................................................................................................15
3.8. Marketing Promotion and Strategy.......................................................................................................15
3.9. Service program....................................................................................................................................16
3.10. Sales Plan/Capacity..............................................................................................................................16
4. SERVICE MIX AND CIVIL WORK OF THE PROJECT.........................................................................16
4.1. Service Utility.......................................................................................................................................16
4.2. Civil Engineer Building and Civil Works.............................................................................................16
5. ORGANIZATION AND MANAGEMENT................................................................................................17
5.1. Organization and Management.............................................................................................................17
5.2. Man Power............................................................................................................................................17
5.3. Organizational Structure.......................................................................................................................17
6. FINANCIAL REQUIRMENT AND ANALYSIS.......................................................................................19
6.1. Total Initial Investment Cost................................................................................................................19
2
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
3
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
EXECUTIVE SUMMARY
1. Project Name Fuel Station Project
3. Nationality Ethiopian
4. Project location
Sheger city Furi sub-city Adminstration
4
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
1. INTRODUCTION
5 | FUEL STATION
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
gas station
Ethiopia has experienced a lot of growth over the past decade and a half
both economically and in demography. This pushes for more petrol stations
around the country; especially around the Furi Sub-city the demand supply
gap is high. This growth has consequently increased the number of investors
and visitors. And the people of the Dana town need a petrol station to stay
close their business. This project aims at providing this target market
requisite petrol station with full facilities and Motel building service for the
area. Our mission is to successfully build, promote and provide quality fuel
station. We plan to create an environment of convenience that surpasses the
standard level for other petrol station in area. The client of this petrol station
development will have every need met to ensure a total and comprehensive
comfort.
Petroleum products are among the most valuable natural resources
abundantly available in our country while the country is not making it
functional still. Ethiopia and people everywhere use petroleum products as a
fuel in their automobiles, generating sets industrial plants and for cooking
purposes in most of the area of the country, thus making petroleum products
an essential commodity that is needed for the daily operations of individual,
industrial and national activities. Ethiopia being non-oil producing nation,
however still relies on imported petroleum products for the servicing of the
economy. Such petroleum utilized by almost everybody on daily basis at an
average of 10 liters daily usage.
The Ethiopian economy has been registering extraordinary, double digit, and
economic growth for the last nine years. When there is fast economic growth
in one nation the income of the citizen also increases this phenomenon
changes the life style and modernization of the citizen.
In order to keep the economic growth long lasting there should be parallel
growth and linkage in all sectors of the economy such as manufacturing and
service (tertiary) sector. The development of hotel as one part of service
sector has a great contribution to the economy in different ways.
6 | FUEL STATION
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
7 | FUEL STATION
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
“petroleum sector”
1.2. Crucial Factors & Steps in Decision Making for Investment
Key success factors
Following factors are the key in making this project profitable:-
Location of the project will play a pivotal role in the successful running of the
fuel station. The daily turnover of the cars largely depends on this important
factor.
Selection of proper equipment is another key for carrying out of successful
operations of the proposed project.
A. Opportunities
The proposed project would have a number of competitive advantages:-
The project will increase the number of fuel station and provide fuel to more
customers reducing the problem of fuel scarcity in the area and reducing the
cost. The City is a good location because of the high rate of vehicular
movement in and out of region.
B. Threats
The processing of license may take time because of the satiation in the
country.
8 | FUEL STATION
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
The feasibility of the project has been carefully assessed and the promoters are
confident that it will be a total success. The business will be run by a team of
competent management professionals who have acquired practical
9 | FUEL STATION
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
By providing quality services, the project will satisfy the demand of the
customers.
2. Source of Revenue
As public policy of any nation, the government collects different forms of taxes
from different business organizations and individuals. Among the different forms
of taxes, business income taxes and payroll taxes are collected from undertaking
business activities. Therefore, the project has been serving sources of revenue
for regional government.
3. Employment Opportunity
One of the problems that our country faced is unemployment. Therefore, the
current objective of the government is working on tackling the problem of
unemployment and fostering the development process either through creating
self-employment or employment in other organization. In this regard, project
will hire 32employees.
Besides, during the construction work of the project extra jobs will be created
10 | FUEL STATION
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
Ethiopian economy has been registering extraordinary, double digit economic growth
for the last nine years. When there is fast economic growth in a nation, the income of
the citizen also increases und this phenomenon changes the life style and monetization
of the citizen.
In order to keep the economic growth long lasing there should be parallel growth and
linkage in all sectors of the economy such as manufacturing and service sector. The
development of fuel station as one part of service sector has a great contribution to the
economy in different ways. However, the expansions of fuel station service business
11 | FUEL STATION
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
are concentrated in main city of the nation. hence, further investment in these areas is
vital for better service provision for the citizens, which in turn support fast, the
economic development.
In addition to the above facts, the following points are considered by the owner for the
project justifications;
Shimalis Bulto Gas Station and super market are focused on offering a professional
service in line with the growing demand for well-equipped Fuel Station and super
market facilities in town The fuel station will provide a comprehensive fuel station
services it fuel and lubricant sales, car wash services, oil change and tier repair
services, and other services in the city. The fuel station will create better employment
and business opportunities for the community at large
12 | FUEL STATION
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
Mechanical and Electrical install coincide with each other due to the need for
coordination between the two divisions. There are several periods of construction
during the schedule in which there are multiple construction activities occurring at the
same time.
The construction site must be organized accordingly as these processes take place. As
with any construction project, the goal of the schedule was to complete all construction
activities before the required Date of completion.
This date of completion is practical based on the time of year in which the building will
be completed. The team allowed a two-week contingency for any setbacks. Typically,
winter construction tends to cause unforeseen delays that negatively impact a
construction project. These conditions can and will almost undoubtedly impact the
project schedule by causing unforeseen delays and project inefficiency.
Although functional spaces for the project were laid out in significant detail, the rest of
the building had designated spaces but n set layouts. It was at the discretion of the
project promoter to devise typical layouts for the non-detailed Medium market center
and warehouse. To make sure that the building’s layouts were practical, the project
owner researched typical architectural layouts for Market center and warehouse. The
walls and partitions throughout the floor were congruent with the structural frame and
column locations.
13 | FUEL STATION
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
One of principle deliverables of our project is the structural design of the building. The
structural bays were coordinated with the layout of the building adjustments were
made to the bays if specific layouts are necessary. The frame was made up of a grid
with repeating standard structural bays. Included in the structural system are bay
sizes, shape and size of structural members, floor compositions and curtain walls.
These elements were established to resist gravity ad lateral loads as appropriate.
The gravity load design was completed for two frames; one of structural steel and one
of reinforced concrete. The structural steel frame was chosen for further design based
on cost per square foot, local availability of material and constructability
considerations, such as erection and fabrication. The steel system was then designed
for lateral loading with necessary adjustment being made to framing.
The project group prepared hand structural design calculations for a typical bay of a
reinforced concrete frame. In all reinforced concrete bay designs, a superimposed dead
load of 7.5 pounds per square foot was assumed for mechanical equipment, floor
coverings and ceilings.
Similarly, the design of the typical bay accounted for the use of different commercial
space, in which a live load of 125 pounds per square was assumed. Loads were
calculated based on the requirements of the minimum Design loads for Buildings and
other Structures.
The design of a superstructure may be accurate, have considered all possibilities and
still fail because the substructure is incapable of distributing the applied loads to the
supporting soil.
Foundation design takes more into consideration than merely the loading from the
columns. While the main part of the project focused on the structural frame and its
alternate designs, a preliminary foundation plan was designed based upon maximum
load carried from the superstructure through the columns. The foundation design
14 | FUEL STATION
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
The project team developed a coordinated project schedule and construction plans that
would reflect the expectations for an actual construction project. The project schedule
was developed using the preliminary designs given to the project team.
Additionally, the group considered typical construction activities and durations taken
from similar construction projects as well as realistic constraints on building
development. For instance, it is necessary for the structural frame to be completed
before concrete can be placed for the slab on deck. Hand drawn construction plans
detailing site entrances and storage areas were coordinated with the project schedule
to give the reader visualizations of the construction site set up through various periods
of the construction process.
The construction process for this project is normally a disjointed three mages
development by which the conceptualized need of the promoter of this project is
translated into a functional facility that will meet their needs in terms of time, cost and
quality.
Based on a general program of the project owners the consultant who is going to be
hired makes site studies, develops structural designs, prepares drawings and
specifications, determines quantities involved and estimated the resultants costs. All
these activities will be done in the first phase of the project which is the design stage
after the document are produced by the designers have been received, and the works
secured the project is supposed to enter the tendering stage. At this stage contractor
study the project document analyze and subsequently determine the construction
methods, built up their unit rates and submit their bids for the works. The promoter of
this project intends to compare the bids and award the contract for the lowest
responsible bidder. This, is of course, presupposes that the favorable proposal does not
exceed the allocated budget.
15 | FUEL STATION
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
After the award is made and the contract signed between this project owner and the
contractor, the project constructor is expected to prepare and submits a detailed
construction program which includes material schedule, manpower requirement and
cash flow forecast. After the award is made and the contract signed between this
project owner and the contractor, the project constructor is expected to prepare and
submits a detailed construction program which includes material schedule, manpower
requirement and cash flow forecast.
4.3. Utilities
A number of utilities world be put in place in order to ensure smooth functioning of the
project. These utilities include:
Water Supply,
Drainage Facility
B. Land Requirement
The total land required by the project is estimated to be 5000M 2. The premises required and land use
plan is indicated in table below;
Table.1: Premises required and land use plan
SN Description
LAND NEEDED (M2)
1.3 Mini Café and Restaurant 100
16 | FUEL STATION
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
17 | FUEL STATION
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
3. MARKET STUDY
3.1. Scope of the Market Study
The petroleum sector has shown a dynamic change in the past few years. The
reason for this could be rapid economic growth and a supporting public
particularly firms in the services sector. The business of fuels in Dana Town in
booming highly due to the recent rapid growth experienced in Ethiopia. As a result,
The project is targeted for Dana town district cross the vicinity and surrounding
area. Hence, the scope of market study of this project concentrates on the Furi Sub-
cityand surrounding rural villages in general and the kebele in specific scenario.
18 | FUEL STATION
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
fuels & lubricants amounts 2.5 billion liters and 25 million liters respectively. In Ethiopia more than half of
among the overall size of demand for fuels & lubricants amounts 2.5 billion liters and 25 million liters
respectively are consumed in Addis Ababa and its neighbor towns.
At present there are 710,000 vehicles in Ethiopia with more than 70 percent of them (410,000)
registered in Addis Ababa? However, the number of fuel stations in the capital stood at only 100.
2. Mass Organization 239 256 294 261 1657 2271 2880 3852 4417
4. C.D 819 815 921 1060 1050 1099 1394 1318 1511
5. AID Organization 3794 4280 4219 4052 4384 4828 6122 6292 7216
6. OAU 134 132 157 217 225 250 317 330 379
7. Commercial 30851 33311 34995 34931 50046 58120 73697 81761 93752
8. Taxi 10156 10632 12010 12506 14523 20062 25439 34282 39310
9. Private Commercial 9859 10661 11531 8245 14988 17263 21890 24014 27536
10 Private Cars 42258 43858 47905 53540 58221 65930 83600 89555 102690
Total 11206 121557 130264 132938 166309 192625 244252 270000 30960
Table: 3 Forecasted numbers of the vehicles in the country for the coming 10 years
19 | FUEL STATION
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
No. Types of 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
License
1 Government 32448 33746 35096 36500 37960 39478 41057 42699 44407 46184 48031
2 Mass 4594 4777 4969 5167 5374 5589 5812 6045 6287. 6538 6800
organization
3 UN 1653 1719 1787 1859 1933 2011 2091 2175 2352 2352 2446
4 CD 1571 1634 1700 1768 183 1912 1988 2068 2151 2237 2326
5 Aid 7505 7805 8117 8442 8779 9131 9496 9876 10271 10681 11109
Organization
6 OAU 394 410 426 443 461 480 499 519 539 561 583
7 Commercial 10256 11220 11275 13429 4696 16072 17583 19236 21044 23022 25186
5 6 3 2 5 4 2 4 6 4
8 Taxi 42062 46015 50341 55073 60250 65913 72109 78880 86303 94415 10329
7 0
9 Private 29464 32233 35263 38578 42204 46171 50511 55259 60454 66136 72353
commercial
10 Private cars 17457 19098 20893 22857 25006 27356 29928 32741 35819 39186 42869
3 3 5 5 1 7 2 5 2 2 7
Total 39682 43152 46938 51069 55776 60497 65868 71730 77830 85119 92750
7 8 7 6 6 0 5 9 2 3
Sources Ministry of Transport
There are a number of factors which creates demand for Fuel Station in the area. The
following major factors are identified;
Economic activities
Population
Location Importance
Infrastructure (road)
Energy Deman
These major demand factors for the project are explained as follows
1. Location Importance
The planned fuel station use project will be established in Sheger city, where
the different construction is flourishing from time to time. Because this cash
crop area has easy access to the fundamental utilities and other facilities
20 | FUEL STATION
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
required for construction area such as treated water supply, electric power,
access to telephone line and easy access for transportation and market outlet.
Moreover, the regional government has been undertaking various measures
help boost the growth of investment endeavors in the area by allotting land,
and providing efficient municipal services
2. Infrastructure (Road)
In the district there exist asphalt all whether and dry whether roads that
connects different areas that will create a demand for the fuel station services.
3. Availability of Different Institutions
In the district, there exist many governmental bureaus. Besides, there exist
non-government organizations (NGOs) and private companies. All these
institutions are potential market demand for the project
4. Energy Demand
The proposed gas station intends to open in an area with a lot of business
potential. There is no doubt one of the greatest strengths and advantages
outlined in this gasoline station business plan is the strategic location. The plan is
to implement a unique business model that focuses on an exemplary customer
service approach and provision of topnotch products and services. The proposed
gas station will recover its entire startup capital after three years in operation.
There is a projection of annual sales growth of between 20-25%.
The target customers of the envisioned project are
21 | FUEL STATION
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
Business Community
The Fuel Station under discussion will have diversified marketing strategies that could enable it
come up with the different competitors in the market. Moreover, customer satisfaction will be the
key marketing strategy of the building. Generally, the project has a competitive advantage since
there are no many standard fuel stations in the town.
3.9. Service program
The organization will initially operate at 70% of its capacity and will reach 100 %( full capacity)
service provision in the second year.
22 | FUEL STATION
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
The Fuel Station will provide the following service. The project will provide
different fuel energy (like kerosene, benzene and Diesel) for end users by
franchise based business from one of the oil company. Besides, the projects will
also sale different oil and lubricants for consumer. Moreover, service like car
wash and parking will be provided by the company.
construction will be done under close supervision and Furi Sub-cityof the
engineers.
The organizational structure should be in a way that the fuel station service can
able to achieve its objectives as well as the satisfaction of standard
requirement.
5.2. Man Power
The total manpower required for the building will be 32 persons. The
manpower list and the corresponding labor cost are shown in Part five of this
document.
5.3. Organizational Structure
24 | FUEL STATION
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
Administration
section
General service
Fuel section section
Coordinator Oil and liquor
section
Marketing section
Finance section
Accountant
He/she will plan, organize, direct and control the human and non-human
resources of the organization (other departments) so as to achieve the short and long
run objectives of the organization.
A. Service Management Department
This is the core department that has six main sections (Fuel station, Car Wash, Parking area, Engine
Oil Shop, Vehicle Spare Parts and employee rooms) the main duties and responsibilities of this
department are
To render those outlined services of the project and manage the overall service delivery
system of the motel and fuel station in line with the customer need and satisfaction.
He/she will incorporate modern technological innovation that will facilitate the service
delivery of the fuel station Car Wash, Parking area, Engine Oil Shop, Vehicle Spare Parts and
employee rooms’ services that will increase customer’s satisfaction.
25 | FUEL STATION
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
Will handle the overall marketing activities of the organization which include
planning, organizing, directing, and controlling.
Will develop the marketing strategies.
Will develop effective customer handling strategies
Plan and execute the promotion mix
40,000,000 Birr.
Table 4: Total Initial Investment Capital
Accordingly, the construction cost which covers the largest proportion of the total project capital calculated
to be 8,600,000.
27 | FUEL STATION
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
Table: 6 Machineries required for the Fuel service is estimated to be ETB 12,000,000
Guest chairs
5 Birr 3 2000 6000
Carpet and curtain
6 Birr Ls - 6500
7 Filing Cabinet Birr 2 2000 4000
8 Shelf Birr 1 10000 10000
9 Fax and Telephone Set Birr 1 20000 20000
Total 111,500
Tabel :10 Direct cost the company that imports them sets their selling price
Total
S. Required unit cost per cost per Annual purchasing
N Items volume/month/litter litter month price
1 Diesel 8000 36.5 292000 3504000
2 regular petrol 8000 38.5 308000 3696000
3 Kerosene 3000 28.5 85500 1026000
4 Oils 190 97.851 18591.69 223100.3
704091.7 8449100
29 | FUEL STATION
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
30 | FUEL STATION
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
B. Depreciation
Building 5%
Machinery and equipment 10%
Office furniture 10%
Vehicles 20%
C. Working Capital
Amount(in birr)
SN Description % share
1 Owners Share 30 12,000,000
2 Bank Loan 70 28,000,000
Total 100 40,000,000
Annual revenue of the firm depends on the yearly sales amount. It is considered by yearly working
days’ capacity. The firm is expected to deliver service for 24 hours a day and all 30 days per month
and 365 days per annum. Therefore, the firm is planned to sell diesel gas of 8,500 litters, 8,500 litter of
regular petrol and 4,000 litter of kerosene per month.
It is expected that the selling prices of the fuel adjusted as per national government order. However,
currently average selling one litter diesel is birr 80 per litter. For those prices of regular petrol and
kerosene is birr 80 per litter. Therefore, to calculate annual revue collected of the fuel station this price
per litter is taken in to account. Therefore, at the initial year the total revenue collected from sales of
different kinds of gases and oils will be birr 21,552,000.00 -increases in 10% at the remaining year.
Table: 17 total revenue collected from sales of different kinds of gases
No Description Unit Sales Average Monthly Annual sales
/volume/mont selling Price sales revenue
h revenue
1 Kerosene Liter 4000 80 320000 3840000
2 Benzene Liter 8500 80 680000 8160000
3 Diesel Liter 8500 80 680000 8160000
4 Lubricant and Liter 500 200 100000 1200000
oil
5 Car Wash No of cars 200 80 16000 192000
Total 1796000 21,552,000.00
provided in these section these projection include profit or loss statement and statement of cash flow the projects
are proposed on an annual bases .The envisaged project will generate revenue of birr 21,552,000 during its first
year of operation and birr 23707200 during the second year of its operation on its word .The project will pay
approximately birr 4,200,000 interest on the long term loan during the first year and birr during the second
year of operation 3,780,000.00.finally the project will generate a net profit that grows from birr 3,291,275 in the
first year and to birr 7,177,749 during the fifth year of operation. .
10,189,85
Gross Profit 9,263,500 11,208,835 12,329,719 13,562,690
0
34 | FUEL STATION
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
7.5.1. Profitability
35 | FUEL STATION
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
Concerning the payback the project will cover 7 years the initial cost
investment from the net cash flow within the given loan period this
indicating project is financially feasible. .
36 | FUEL STATION
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
Currently the issue of environment and envelopment get due emphasis and thus every
citizen called exert their maximum effort for fighting against any negative impacts on
the environment so as to result in a win-win solution on common agenda that is
creating environmentally friendly business environment. Therefore, this fuel station
project does not cause a negative impact on the environment.
37 | FUEL STATION
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
a. Monitoring
Monitoring activities includes measuring the physical performance and quantity of the work
done, con-elation of the work done with set plan and time table.
b. Evaluation
Evaluation will be conducted three times during the project life year, at the beginning of
project life, in the middle and at the end of project life years.
The evaluation based on the overall goal and purpose. The scope of the evaluation will be:
The extent to which purposes the project have been fulfilled.
The expected profits will be maximized.
Impact contributed to socio-economic development of country.
Overall, the projects have the following merits which would justify the need for giving
priority in its finance:
The strategic objectives of the projects are highly consistent with the national
development objective which calls to “sustainably increase rural incomes and
national food security, which embodies the concepts of producing more, selling
more, nurturing the environment, eliminating hunger and protecting the
vulnerable against shocks.
These projects are expected to create job opportunities for these potential
migrants at their nearby village and hence alleviate the pushing factor for
migrations.
The projects aim at utilizing locally available technologies so as to encourage
the backward and forward linkage of the project and hence contribute towards
the realization of Agricultural Development Led Industrialization (ADLI) strategy
of the country.
Finally, the projects will largely contribute towards the national economic
development by contributing to National GDP. GDP contribution originating
from the agriculture sector has more power of poverty reduction than other
sectors (a one percent GDP growth rate originating in agriculture sector has
more potential for poverty reduction than two percent GDP growth rate
38 | FUEL STATION
PROJECT PROPOSAL ON THE ESTABLISHMENT OF FUEL STATION IN SHEGER CITY
FURI SUB-CITY
39 | FUEL STATION