0% found this document useful (0 votes)
6 views2 pages

Monitoring Inspection Records

The document outlines the monitoring inspection records for the Shamal Development project by China Harbour Engineering Company, detailing various environmental parameters such as air quality, noise, waste management, and ecological impacts. Each parameter includes a requirement and status indicating compliance (YES/NO). The records are essential for ensuring adherence to environmental regulations and project standards.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views2 pages

Monitoring Inspection Records

The document outlines the monitoring inspection records for the Shamal Development project by China Harbour Engineering Company, detailing various environmental parameters such as air quality, noise, waste management, and ecological impacts. Each parameter includes a requirement and status indicating compliance (YES/NO). The records are essential for ensuring adherence to environmental regulations and project standards.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

CHINA HARBOUR ENGINEERING COMPANY

CONTRACT NO: 2101-297

SHAMAL DEVELOPMENT – TOPSIDES & INFRASTRUCTURE WORKS

Date:

MONITORING INSPECTION RECORDS

S. NO. PARAMETERS REQUIREMENT STATUS REMARKS

Exhaust emissions from the operation of construction


YES/NO
equipment

Dust generation from the Reclaimed ground YES/NO


1. Ambient Air Quality
Dust generation from the transport and stockpile of
YES/NO
construction materials

VOC emissions from onsite storage of fuel and volatile


YES/NO
materials.

2. Noise Noise from construction equipment YES/NO

Records of waste Disposal (sewage) YES/NO

Records of waste transfer (hazardous waste) notes/


3. Waste YES/NO
manifest

Maintain waste manifest YES/NO

Dewatering effluent analysis by ESMA-approved


4. Dewatering YES/NO
laboratory
Potential soil contamination due to leakage from
5. Soil and Groundwater YES/NO
plants and equipment
CHINA HARBOUR ENGINEERING COMPANY

CONTRACT NO: 2101-297

SHAMAL DEVELOPMENT – TOPSIDES & INFRASTRUCTURE WORKS

S. NO. PARAMETERS REQUIREMENT STATUS REMARKS

Records of waste generation and disposal. Quantity of


YES/NO
spill kits

Records of disposal of wastewater. Waste transfer


YES/NO
manifests.
Disturbance to animals and birds due to the generation
6. Terrestrial Ecology dust, noise, lighting, and waste from construction YES/NO
activities
Material storage, Accidental spills and leaks, Discharge
7. Marine Ecology YES/NO
of wastewater

Accidental spills and leaks YES/NO

Impacts from contaminated infill materials YES/NO

Marine Water and Impacts from improper Material storage, Spill of


8. YES/NO
Sediment hazardous material to the marine environment

Impacts from discharge of sanitary water YES/NO

Impacts from indiscriminate discharge of waste into


YES/NO
the marine environment

Assessment of compliance with the CEMP


9. Third-Party Auditing YES/NO Conducted on a Quarterly Basis
requirements

You might also like