0% found this document useful (0 votes)
50 views1 page

Electrical 1

The document provides an electrical legend detailing various electrical components and their abbreviations used in a project, including distribution boards, sockets, and light fittings. It also includes important installation notes regarding the placement of sockets and wiring specifications. The project is related to a comprehensive emergency obstetric and newborn care hospital, with specific instructions for electrical installations.

Uploaded by

vectordsolution
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views1 page

Electrical 1

The document provides an electrical legend detailing various electrical components and their abbreviations used in a project, including distribution boards, sockets, and light fittings. It also includes important installation notes regarding the placement of sockets and wiring specifications. The project is related to a comprehensive emergency obstetric and newborn care hospital, with specific instructions for electrical installations.

Uploaded by

vectordsolution
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ELECTRICAL LEGEND

DB Distribution Board.
SMDB SUB Main Distribution Board.
MDB Main Distribution Board. IMPPORTENT NOTE
CDB/EDB Common/Emergency Distribution Board. 01. All socket will be with switch.
EDBF Emergency Distribution Board for Flat. 02. 2pin or 3pin socket(PM or RM) in kitchen will
MB Meter Board. be at 9" above from kitchen table or as
DBL Distribution Board For Lift. instructed.
PBP Power Box For Pump. 03. 3pin socket(QM) in kitchen will be at 9" above
IC PABX Intercom Junction Box. from kitchen table for microwave oven and for
AJB Antenna (TV) Junction Box. window type A/C will close to A/C location
IJB INTERNET Junction Box. at same level from finished floor or as instructed.
ACOS Auto Change Over Switch. 04. 3pin socket(QL) for splite type A/C will close to
SB A/C location and DP switch will be located to
SB Switch Board At 4'-0" Height From Finished Floor.
SB
ESB Emergency Switch Board At 4'-0" Height From Finished Floor. switable place at skirting level or as instructed.
CL/SP Ceiling/ Spot Mounted Light Fittings. 05. Water heater in bathroom will be above false
CH CHANDLER LIGHT ceiling near to cat door or as instructed.
WL Wall Light Point at 7'-6" Height From Finished Floor. 3pin socket (QF) for the water heater will close
FWL False Wall Light Point Above False Ceiling. to the water heater and DP switch will be closed
WGL Water-Tight Garden Light Fittings Located at Wall / Floor. to the bathroom switch/socket or as instructed.
LED LED CEILING LIGHT 06. 3pin socket(QM) for water heater in kitchen will
SL Security Light. be closed to the water heater and at 5'-6" height
BL Bathroom Light Fittings at Wall. from finished floor or as instructed.
LP Light Fittings at Wall Inside the Wall Cabinet. 07. 3pin socket(QS) for washing machine will be
TL 1X40W Tube Light at 7'-6" Height From Finished Floor. closed to the washing machine and at 9" height
ETL 1X40W Emergency Tube Light at 7'-6" Height From Finished Floor. from finished floor or as instructed.
ML Light Point Above Mirror Located at Basin Side Wall. 08. 3pin socket(RS) for freeze or computer will be
WSP Wall Mounted Spot Light Fitting For Logo. closed to the freeze or computer table and at 9"
CB Calling Bell at Above Lintel Level. height from finished floor or as instructed.
BP Bell Push at SB Level. 09. 2pin socket(PL) for ex/fan or kitchen hood will
TV Cable TV Outlet at Skirting Level. be closed to ex/fan or kitchen hood location at
TS Telephone Outlet at Skirting Level. same level or as instructed.
IC Intercom Outlet at SB Level. 10. All cable should be multistand(rm) except ECC
DP Double Pole Switch at SB or Skirting Level. cable(green cable).
11. All wiring cable size for light,fan and 2pin socket
CF Ceiling Fan.
should be 1.5rm(BYA or IYAL) and ECC not to be
required here.
ECF Emergency Ceiling Fan.
12. All steel box must be connected with earthing point
MCF Moveable Ceiling Fan. by the earthing cable to ensure the proper earthing.
13. All 3pin socket (RS.RM & RB) must be connected
EX Exhaust Fan.
with earthing point by 1.0re or 1.5re earthing
pump WP Water Pump.
cable as per required to ensure the proper earthing.
RS 13A, 3-Pin Switched Socket at Skirting Level.
RM 13A, 3-Pin Switched Socket at Manheight Level.
QS 15A, 3-Pin Switched Socket at Skirting Level.
QM 15A, 3-Pin Switched Socket at Manheight Level.
QL 15A, 3-Pin Switched Socket at Lintel Level.
QF 15A, 3-Pin Switched Socket Above False Ceiling. PVC Conduit For Light & Fan.
PS 10A, 2-Pin Switched Socket at Skirting Level. PVC Conduit For Switch & Power Socket.
PB 10A, 2-Pin Switched Socket at Switch Board Level. TELE TELE TELE TELE TELE TELE

PVC Conduit For Telephone.


PM 10A, 2-Pin Switched Socket at Manheight Level. IC IC IC IC IC IC
PVC Conduit For Intercom.
PL 10A, 2-Pin Switched Socket at Lintel Level. DISH DISH DISH DISH DISH DISH

PVC Conduit For Cable TV.

PROJECT NAME: CLIENT: CONSULTANT ELECTRICAL DETAILS ENGINEER


SCALE:

AS SHOWN
TANVIR HASAN
COMPREHENSIVE EMERGENCY OBSTETRIC VECTOR DESIGN AND SOLUTION . ELECTRICAL LEGEND 17.11.24
SAVE THE CHILDREN DATE
AND NEWBORN CARE(CEMONC)HOSPITAL ADDRESS:HOUSE NO-278,WEST MONIPUR,60 FEET ARCHITECT
CONSULTANCY SERVICES. ROAD,MIRPUR DHAKA-1216.
PAGE NO: 01
MUKTI ARA ZAMAN

You might also like