40.01 W 18 1.2 -
Net M.S. Grill Work for Windows =
D 1 1.8 0.23
D1 10 1 0.23
Total =
D 1 1.8 -
D 10 1 -
Total =
29 Shutters for Windows
W 18 1.2 -
Total =
39.68 2 1.0 -
Providing and fixing in position powder coated
aluminium louvered windows / ventilator of
various sizes with powder coating as per
detailed drawing and specifications including
39.68 2 1.0 -
aluminium frames 80 x 38 mm x 1.22 mm box
type, 5 mm thick sheet glass louvers, of
approved quality etc. complete.
V
32 Internal Colouring: -
33 External Colouring: -
35 Steel Reinforcement
26.33
Providing and fixing in position TMT - FE -
500 bar reinforcement of various diameters for
R.C.C. pile caps, footings, foundations, slabs,
beams columns, canopies, staircase, newels,
chajjas, lintels pardis, copings, fins, arches etc. as
per detailed designs, drawings and
schedules. including cutting, bending, hooking
the bars, binding with wires or tack welding
26.33
and supporting as required complete.
FIRST FLOOR
17 Shutters for Doors Description of Item same as done for Groun
Floor
39.09 D1 13 1 -
Total =
Total =
19 39.68 Shutters for Ventilators Description of Item same as done for Groun
Floor
V 2 1.0 -
24 Steel Reinforcement
HEADROOM
14 Waterproofing : -
31.26 1 297.22
Slab 1 Area = 4.46 x 4.46 = 19.89 sq.m
Slab 2 Area = 5.00 x 4.46 = 22.30 sq.m
Slab 3 Area = 2.96 x 4.46 = 13.20 sq.m
Slab 4 Area = 5.00 x 4.46 = 22.30 sq.m
Slab 5 Area = 5.96 x 4.46 = 26.58 sq.m
Slab 6 Area = 5.50 x 3.00 = 16.50 sq.m
Slab 7 Area = 19.45 x 3.2 = 62.24 sq.m
Slab 8 Area = 4.46 x 3.46 = 15.43 sq.m
Slab 9 Area = 5.00 x 3.46 = 17.30 sq.m
Slab 10 Area = 2.96 x 3.46 = 10.24 sq.m
Slab 11 Area = 5.00 x 3.46 = 17.30 sq.m
Slab 12 Area = 10.5 x 1.50 = 15.75 sq.m
Slab 13 Area = 5.96 x 3.46 = 20.62 sq.m
Slab 14 Area = 5.50 x 3.20 = 17.60 sq.m
Total Area = 297.22 sq.m
15 Steel Reinforcement
2.1 0.8694
2.1 4.83
5.6994
2.1 3.78
2.1 21
24.78
1.0 21.6
21.6
1.0 2
1.0 2
279.67
Internal Plastering
sq.m
151.008
sq.m
External Plastering
279.67 sq.m
Internal Plastering
4455 Kg
4455 Kg
4455 Kg
External Plastering
Internal Plastering
3225 Kg
59.444
0.2
cu.m3
855 Kg
(17)
32.12 Total Deduction External Plaster: 1 1 - 1 15.580
12
10
0
Unit
(17)
32.12 Total Deduction External Plaster: 1 1 - 1 15.580
12
10
0
Unit
(17)
32.12 Total Deduction External Plaster: 1 1 - 1 15.580
12
10
0
Unit
(17)
32.12 Total Deduction External Plaster: 1 1 - 1 15.580
12
10
0
Unit
(17)
32.12 Total Deduction External Plaster: 1 1 - 1 15.580
12
10
0
Unit
(17)
32.12 Total Deduction External Plaster: 1 1 - 1 15.580
12
10
0
Unit
K.K WAGH INSTITUTE OF ENGINEERING EDUCATION
AND RESEARCH, NASHIK.
Assignment No.: 02
Name Of Work: R.C.C. Frame Structure. (Ground Floor)
MEASUREMENT SHEET
Site clearance
(1)
21.34 Site clearance including removal of trees, shrubs, boulders, etc. and levelling the ground. Lumpsum
(4)
25.13
Item No Description Of Item No. L B H QTY Unit
(6)
25.33
Item No Description Of Item No. L B H QTY Unit
(8)
26.26
Item No Description Of Item No. L B H QTY Unit
(10)
27.01 A] Doors
D = 1.8 x 2.1 1 1.8 0.23 2.1 0.869 Cu.m
D1 = 1.0 x 2.1 10 1 0.23 2.1 4.830 Cu.m
B] Window
W = 1.2 x 1.0 18 1.2 0.23 1 4.968 Cu.m
C] Ventilators
V = 1.0 x 1.0 2 1 0.23 1 0.460 Cu.m
D]Lintels
D = (1.8+0.15+0.15) = 2.1 1 2.1 0.23 0.23 0.111 Cu.m
D1 = (1.0+0.15+0.15) = 1.3 10 1.3 0.23 0.23 0.688 Cu.m
W = (1.2+0.15+0.15) = 1.5 18 1.5 0.23 0.23 1.428 Cu.m
V = (1.0+0.15+0.15) = 1.3 2 1.3 0.23 0.23 0.138 Cu.m
Net deduction for doors, windows, lintel and ventilation 13.492 Cu.m
Net brick masonry in superstructure 82.374 Cu.m
B.M in Outside Steps
(11)
27.01
Item No Description Of Item No. L B H QTY Unit
For Ceiling:
Doctor's cabin: (4.0 x 4.0) 1 4 4 - 16.000 Sq.m
(16) Operation theater: (5.0 x 4.0) 1 5 4 - 20.000 Sq.m
32.04 W.C: (2.5.0 x 4.0) 1 2.5 4 - 10.000 Sq.m
W.C2: (2.5 x 3.0) 1 2.5 3 - 7.500 Sq.m
General ward 1: (5.0 x 4.0) 1 5 4 - 20.000 Sq.m
Cafeteria: (5.5 x 4.0) 1 5.5 4 - 22.000 Sq.m
Store room: (4.0 x 3.0) 1 4 3 - 12.000 Sq.m
Reception: (5.0 x 3.0) 1 5 3 - 15.000 Sq.m
Waiting room: (5.0 x 3.0) 1 5 3 - 15.000 Sq.m
General ward2: (5.5 x 3.0) 1 5.5 3 - 16.500 Sq.m
Passage: (19.45 x 3.2) 1 19.45 3.2 - 62.240 Sq.m
Total Internal Plastering for Ceiling: 216.24 Sq.m
Deduction:
A] Doors:
D1: (1.8 X 2.1) = 3.78sq.m > 3 sq.m (No's: 1 X 1) 1 1.8 - 2.1 3.780 sq.m
D: (1.0 X 2.1) = 2.10 sq.m < 3sq.m (No's: 10 X 0.5) 5 1 - 2.1 10.500 sq.m
B] Windows:
W: (1.2 X 1 ) = 1.2 sq.m < 3 sq.m (No's: 18 X 0.5) 9 1.2 - 1 10.800
C] Ventilators:
V: (1 X 1) = 1 sq.m <3sq.m (No's: 2 X 0.5) 1 1 - 1 1.000
Total Deduction: 26.080
Total Net Quantity for Internal Plaster: 922.04 sq.m
External Plaster:
Tile Flooring
Providing and laying matt finish ceramic tiles of having
size 30 cm x 30 cm confirming to I.S.15622/2006 (group
D II-A) and 7 to 8 mm thick for flooring in required position
laid on a bed of 1:4 cement mortar including cement float,
filling joint with white/colour cement
slurry cleaning curing etc. complete.
(23)
40.08
Item No Description Of Item No. L B H QTY Unit
Providing and Fixing mat finish stainless steel (of 302 grade )
railing with top pipe of 50 mm dia. and vertical pipe of 38
(23) mm dia at 0.60 m c/c or as required and horizontal pipes
40.08 1 5.75 - 5.750 R.M.T
of 25 mm dia in three rows, all pipes of 2 mm thick
including buffing,fabricating fixtures and fastening
including pipe base of appropriate diameter and ball base
of 75 mm dia above newel post of 75 mm diameter
etc. complete (Prior approval of sample and brand by
Ex.Engineer is necessary beforeuse
L = 2.25 + 1.25 + 2.25 = 5.75 m
Net length of Hand railing= 5.750 R.M.T
M.S. Grill work for Windows: -
(28)
33.68
Item No Description Of Item No. L B H QTY Unit
External colouring
Cu.m
Net R.C.C in slab and landing 43.32
R.C.C in staircase
R.C.C in waist slab L= 1 6.03 0.98 0.15 0.88 Cu.m
(4) 6.02m
26.26 R.C.C in steps (Triangular portion) A= 23 0.018 0.42
1/2 x 0.25x 0.15 x 0.975 = 0.0182 sq.m Cu.m
Net R.C.C in staircase 1.30 Cu.m
R.C.C in chajja
H = (0.15+0.23)/2 = 0.19m
(5)
26.07 W = 1.2+0.15+0.15 = 1.5m 18 1.5 0.7 0.19 3.591 Cu.m
Net R.C.C in chajja 3.591 Cu.m
Net R.C.C work 69.88 Cu.m
Brick masonary in superstructure Description of Item same as done for Ground Floor
H= 3.75-0.45= 3.3m
Length of brick maonary in Balcony:
1. Balcony 1: (5+0.23+0.23+3+3)=11.96 m
2. Balcony 2: (11.19+1.5+1.5)= 14.19 m
Total length of Brick masonary in first floor:
11.96+14.19+132.32 = 158.47 m 1 158.47 0.23 3.3 120.279 Cu.m
Deduction:
(6)
A] Doors:
27.01
D: (1.0 X 2.1) = 2.10 sq.m < 3sq.m (No's: 13 X 0.5) 6.5 1 - 2.1 13.65 Sq.m
B] Windows:
W: (1.2 X 1 ) = 1.2 sq.m < 3 sq.m (No's: 15 X 0.5) 7.5 1.2 - 1 9 Sq.m
C] Ventilators:
V: (1 X 1) = 1 sq.m <3sq.m (No's: 2 X 0.5) 1 1 - 1 1 Sq.m
Total Deduction: 23.65 Sq.m
Total Net Quantity Brick Masonry in Wall: 96.629 Sq.m
Internal Plaster for Wall and Ceiling: (First Floor) Description of Item same as done for Ground Floor
For Walls:
Doctor's cabin: 2(4.0+4.0) 1 16 - 3.6 57.6 Sq.m
Operation theater: 2(5.0+4.0) 1 18 - 3.6 64.8 Sq.m
Item No Description Of Item No. L B H QTY Unit
W.C: 2(2.5.0+4.0) 1 13 - 3.6 46.8 Sq.m
W.C2: 2(2.5+3.0) 1 11 - 3.6 39.6 Sq.m
General ward 1: 2(5.0+4.0) 1 18 - 3.6 64.8 Sq.m
Cafeteria: 2(5.5+4.0) 1 19 - 3.6 68.4 Sq.m
Store room: 2(4.0+3.0) 1 14 - 3.6 50.4 Sq.m
Reception: 2(5.0+3.0) 1 16 - 3.6 57.6 Sq.m
Waiting room: 2(5.0+3.0) 1 16 - 3.6 57.6 Sq.m
General ward2: 2(5.5+3.0) 1 17 - 3.6 61.2 Sq.m
Passage: 2(19.45+3.2) 1 45.3 - 3.6 163.08 Sq.m
Balcony (Inside Wall):
1. Balcony 1: (5.5+3+3) 1 11.5 - 1.2 13.8 Sq.m
2. Balcony 2: (10.5+1.5+1.5) 1 13.5 - 1.2 16.2 Sq.m
Balcony (Outside Wall):
1. Balcony 1: (5.96+3.23+3.23) 1 12.42 - 1.2 14.904 Sq.m
2. Balcony 2: (11.19+1.73+1.73) 1 14.65 - 1.2 17.58 Sq.m
Total Internal Plastering for Walls: 794.364 Sq.m
For Ceiling:
(7)
Doctor's cabin: (4.0 x 4.0) 1 4 4 - 16 Sq.m
32.04
Operation theater: (5.0 x 4.0) 1 5 4 - 20 Sq.m
W.C: (2.5.0 x 4.0) 1 2.5 4 - 10 Sq.m
W.C2: (2.5 x 3.0) 1 2.5 3 - 7.5 Sq.m
General ward 1: (5.0 x 4.0) 1 5 4 b 20 Sq.m
Cafeteria: (5.5 x 4.0) 1 5.5 4 - 22 Sq.m
Store room: (4.0 x 3.0) 1 4 3 - 12 Sq.m
Reception: (5.0 x 3.0) 1 5 3 - 15 Sq.m
Waiting room: (5.0 x 3.0) 1 5 3 - 15 Sq.m
General ward2: (5.5 x 3.0) 1 5.5 3 - 16.5 Sq.m
Passage: (19.45 x 3.2) 1 19.45 3.2 - 62.24 Sq.m
Total Internal Plastering for Ceiling: 216.24 Sq.m
Deduction:
A] Doors:
D: (1.0 X 2.1) = 2.10 sq.m < 3sq.m (No's: 13 X 0.5) 6.5 1 - 2.1 13.65 sq.m
B] Windows:
W: (1.2 X 1 ) = 1.2 sq.m < 3 sq.m (No's: 15 X 0.5) 7.5 1.2 - 1 9
C] Ventilators:
V: (1 X 1) = 1 sq.m <3sq.m (No's: 2 X 0.5) 1 1 - 1 1
Total Deduction: 23.65
Total Net Quantity for Internal Plaster: 986.954 sq.m
External Plaster: Description of Item same as done for Ground Floor
Total perimeter:[ 2 X (11.12 + 23.38) ] 1 69 - 4.55 313.95 Sq.m
Total Quantity for External Plaster: 313.95 Sq.m
Deduction:
(8)
D: (1.0 X 2.1) = 2.10 sq.m < 3sq.m (No's: 3 X 0.5) 1.5 1 - 2.1 3.15
32.12
W: (1.2 X 1 ) = 1.2 sq.m < 3 sq.m (No's: 13 X 0.5) 6.5 1.2 - 1 7.8 sq.m
V: (1 X 1) = 1 sq.m <3sq.m (No's: 2 X 0.5) 1 1 - 1 1 sq.m
Total Deduction External Plaster: 8.8 sq.m
Total Net quantity for External Plaster: 305.15 Sq.m
Tile Flooring Description of Item same as done for Ground Floor
Doctor's cabin: (4.0 x 4.0) 1 4 4 - 16 Sq.m
Operation theater: (5.0 x 4.0) 1 5 4 - 20 Sq.m
W.C: (2.5.0 x 4.0) 1 2.5 4 - 10 Sq.m
W.C2: (2.5 x 3.0) 1 2.5 3 - 7.5 Sq.m
General ward 1: (5.0 x 4.0) 1 5 4 - 20 Sq.m
(9) Cafeteria: (5.5 x 4.0) 1 5.5 4 - 22 Sq.m
33.24 Store room: (4.0 x 3.0) 1 4 3 - 12 Sq.m
Reception: (5.0 x 3.0) 1 5 3 - 15 Sq.m
Waiting room: (5.0 x 3.0) 1 5 3 - 15 Sq.m
General ward2: (5.5 x 3.0) 1 5.5 3 - 16.5 Sq.m
Passage: (19.45 x 3.2) 1 19.45 3.2 - 62.24 Sq.m
Passage 2: (2.25 x 3.2) 1 2.25 3.2 - 7.2 Sq.m
Total Net quantity for Tile Flooring: 223.44 Sq.m
Dado & Skirting
A] W.C : 2(2.5+3) - 0.8 = 10.2 m 1 10.2 2.1 21.5 Sq.m
(10) 33.25
B] W.C : 2(2.5+3) - 0.8 = 10.2 m 1 10.2 2.1 21.5 Sq.m
NET DADO 43 Sq.m
SKIRTING
A] Store Room 1 14 0.1 1.4 Sq.m
B] Reception 1 16 0.1 1.6 Sq.m
C] Waiting Room 1 16 0.1 1.6 Sq.m
D] Ganeral Ward2 1 33 0.1 3.3 Sq.m
(11) 33.25
Item No Description Of Item No. L B H QTY Unit
E] Passage 1 45.3 0.1 4.53 Sq.m
F] Doctors Cabin 1 16 0.1 1.6 Sq.m
G] Staircase Landing 1 4.26 0.1 0.426 Sq.m
(11) 33.25
I] Steps in Staircase 23 1.8 0.1 1.84 Sq.m
J] Operation Theatre 1 18 0.1 1.8 Sq.m
K] General Ward 3 1 18 0.1 1.8 Sq.m
L] Cafeteria 1 19 0.1 1.9 Sq.m
NET SKIRTING 21.796
DEDUCTIONS FOR SKIRTING
a) Door 1 13 1 0.1 1.3 Sq.m
Net skirting after deduction 20.496 Sq.m
Hand Railing Description of Item same as done for Ground Floor
(12) 40.08
L = 2.25 + 1.25 + 2.25 = 5.75 m 1 5.75 5.75 R.M.T
M.S. Grill work for Windows: - Description of Item same as done for Ground Floor
(13) 40.01
W 20 1.2 1 24 Sq.m
Frames for Doors
(14)
39.01 D1 13 1 0.23 2.1 6.279 Sq.m
Total Shutters for Door 6.279 Sq.m
Shuttera for Doors
(16)
39.09 D1 13 1 - 2.1 27.3 Sq.m
Total Shutters for Door 27.3 Sq.m
Shuttera for Window -
(17)
39.42 W 15 1.2 - 1 18 Sq.m
Total Shutters for Window 18 Sq.m
Shutters for Ventilator -
(18)
39.68 V 2 1 - 1 2 Sq.m
Total Shutters for Ventilator 2 Sq.m
(19) Internal Colouring
36.07 Same as done for Internal Plastering 986.954 Sq.m
Description of Item same as done for Ground Floor
(20) External Colouring
36.12 Same as done for External Plastering 305.15 Sq.m
Description of Item same as done for Ground Floor
(21) Neeru Finish to Internal Plastering
32.15 Same as done for Internal Plastering 986.954 Sq.m
Description of Item same as done for Ground Floor
(22) Steel Reinforcement
26.33 - 3225 Kg
Description of Item same as done for Ground Floor