0% found this document useful (0 votes)
25 views2 pages

Ffii ': Uq86T Olqo6Aal Off

The letter from the Superintending Engineer of the Rural Water Supply & Sanitation Division in Rourkela instructs various project managers to restore roads to their original condition within 15 days after laying pipelines. Failure to comply will result in FIRs against the concerned agency and disciplinary actions against field officers. This matter is marked as 'MOST URGENT' and requires immediate attention.

Uploaded by

Subin Behera
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views2 pages

Ffii ': Uq86T Olqo6Aal Off

The letter from the Superintending Engineer of the Rural Water Supply & Sanitation Division in Rourkela instructs various project managers to restore roads to their original condition within 15 days after laying pipelines. Failure to comply will result in FIRs against the concerned agency and disciplinary actions against field officers. This matter is marked as 'MOST URGENT' and requires immediate attention.

Uploaded by

Subin Behera
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

uq86t oQ1 G' G,l0tll6'0, At- Panposh

qrflq G'G'Got6ud CI o6fic'6ot6t, olQo6aal PO- Panposh, Rourkela

Pin:- 769004

Off tce of the Superintending Engineer Phone:- 8280408065

Rurol Woter Supply & Sqnitotion Division, Rourkelo Email: eenussrld@gmail'com

Letter No.\511 / RWS&S RKL / Dote. La,o7'>5

To

The Assistant General Manager,


M/s. NCC Limited, Rourkela
The Sr. Project Manager,
M/s. UMPESL
The Project Manager.
JMC-SPML(JV)
Authority's Engineer,
Green Design & Engineering Services Pvt. Ltd
Team Leader, M/s.L.N. Malviya lnfra Projects Pvt.Ltd

Sub:- Restoration of roads after laying of pipeline - regarding .

Ref:- Letter No.9003 dated 21 .07.2025 and, 9208 dated. 25.0'7.2025 of the Engineer-ln-Chiei
RWS&S Odisha. Bhubaneswar.

Sir,
With reference to the above cited subject, it is to intimate you that as per the instruction of the
Engileer-ln-Chief, RWS&S Odisha, Bhubaneswar (copy enclosed) restoration of roads after laying of
pipeline are taken up to their original condition within next 15 days and the same is to be reported to this
office. The deparlmental officers and Authority's Engineer are to ensure that its restored within 15 days.
Wherever roads are not restored within 15 days, FlRs shall be lodged against the concerned Agency by
this office and Disciplinary Proceedings will be drawn against the concerned field officers and
Authority's Engineer.

This sliould be treated as "MOST URGENT".


Yours faitlifully,

ffii*'
Supqnntenolng trngrneer.
RWS&S Division, Rourkela
MemoNo \63L lDated. >'1,07'L5
Copy submitted to the Additional Chief Engineer, RWS&S Circle, Sambalpgf,gr favour of kind
information and necessarl actiort. /VffiXV
Superthter\ding Engineer,
RWS&S Division, Rourkela

P.T.O
Memo wo. t 5 1 3 ioated. 2-a ,o7 ,>5
copy submitted to the Engineer-In-chief, Rws&s odisha, Bhubaneswar

ffi;
, for favour of kind
information and necessary action.

Sup6r'rntending Engineer,
RWS&S Division, Rourkela

Memo No_L53_!_/oated. fi .a7, L5


copy forwarded to the Assistant Executive Engineer Rws&s Sub-division,
Rourkela 7c /
Lahunipada / Assistant Executive Engineer, Rws&s Section,
Lahunipada, Koida and Gurundia
/Assistant Engineers, Rws&s Section, Kuarmu.nda,Lathikata,Nuagaon,
Bisra/Junior Engineer, Rws&s
Section, Bonail for information and necessary action.

rffiia*
Superlntending Engineer,
RWS&S Division, Rourkela

You might also like