0% found this document useful (0 votes)
11 views4 pages

Weekly Check List HSE.

C'est une check liste hebdomadaire pour suivre tous les bon choses et les mauvaises dans le chantier

Uploaded by

bensakinakh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views4 pages

Weekly Check List HSE.

C'est une check liste hebdomadaire pour suivre tous les bon choses et les mauvaises dans le chantier

Uploaded by

bensakinakh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Form

CHECK LIST HSE

Construction site: Phase 5


Week , from 24/08/2025 to 28/08/2025

No
Control Conforme Observations
conforme
1- SAFETY AND FIRE FIGHTING
Validity and condition of fire extinguishers: location, adaptation to stored availability of fire extinguisher bottles in all work areas and storage areas
materials

2- RISK OF FALLING FROM A HEIGHT


Installation of bodyguards on voids (from work floors, balconies, hoppers, elevator Guardrails are available on all high platforms and scaffolding
and stairwells, etc.)
Portable ladders (positioning, condition, design, etc.) Ladders are always available in the accesses either for the upper or lower
floors
Scaffolding (stability, fixing, guardrails, access, flooring, etc.) The scaffolding is always inspected and is stable, well fixed and secure.
Presence and conformity of means of access (walkway, staircase, etc.) All types of access are available with its security
3- EARTHWORKS AND EXCAVATION
Protection against excavation collapse (shielding, slope, etc.) Install an appropriate shielding or slope system and ensure daily monitoring of
the stability of the excavation walls.
Overloading of the areas surrounding the excavations (storage of materials and markings and safety barriers always present
equipment, etc.)
Traffic around the excavations too many holes are located too close to traffic lanes
Presence of bream and existence of material marking of the surroundings Markings and signage still present

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Form

CHECK LIST HSE

4- RISQUES ELECTRIQUES
Lockable electrical cabinets During the inspection I noticed that not all the electrical boxes were locked.
They must be locked and the number of the person in charge must be written
in the electrical box in case of emergency.
Electrical installation and connection (connection, hookup, etc.) All electrical cables are well installed and protected
Distance from electrical cables and safety distance presence of electrical cables in dangerous places such as truck passages, and
electrical boxes are not far from welding locations
30mA residual current device and earthing system Presence of circuit breaker and grounding in each electrical box
Compliance of equipment (DIY electrical equipment, makeshift repairs, makeshift all DIY and repair equipment in the best possible form
equipment, etc.)
5- MECHANICAL RISKS
Mechanical protection on moving parts All moving parts are protected and closely monitored to avoid any type of
problem or accident.

Misuse of portable equipment (disc grinders, drills, shears, etc.) proper use of portable equipment with the presence of a protection team for
this type of work

6- ORGANIZATION OF TRAFFIC
Condition of traffic routes, demarcation of traffic and storage areas, access routes, traffic routes all in good condition, storage areas away from traffic routes,
walkways and work platforms access to the work area monitored and secured

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Form

CHECK LIST HSE

Speed limits on the construction site, road signs, presence of a sufficient number no speeding on the construction site and presence of a signalman for mobile
of trained signallers cranes

Construction machinery (frequent or long-distance reversing, reversing warning many trucks in poor condition and their tires too and many cranes without
device, driving with tools in the raised position, machine in working position safety valves in the lifting hook also abandoned trucks in possession of work
without a driver, tyre condition, reversing audible signal, cab, access, etc.)

7- MECHANICAL HANDLING OF LOADS AND SLINGING


Slings and lifting accessories (general condition of slings and accessories (in the slings are well maintained and in good condition, the cranes are well
accordance with instruction IN22), identification of CMU, compliance with positioned and they respect the maximum capacity of the crane
capacities, conformity)
Safe slinging of loads (fragmented loads, load guidance, identification, etc.) secure and monitor lifting operations
Presence of people in the areas where cranes and loads are moving Marking and monitoring during the lifting operation and prohibition of
approaching, especially below, the lifted load
8- ENVIRONMENT
Checking the condition of the equipment (leaks, smoke emission, noise, etc.) some truck in poor condition with oil leaks and smoke
Machines stopped with engine running at idle Lots of truck abandoned and the engine is running
Storage of dangerous products (compatibility of stored products, presence of fire All and well arranged in stock and each product in the right place with
extinguisher, delimitation of storage spaces, storage at height, leakage of presence of extinguisher in stocks and signage posters
dangerous products, knowledge of product characteristics, etc.)
9- HYGIENE
Sanitary and social facilities: Existence and condition: changing rooms and Good condition and cleanliness of toilets and premises
dining rooms and toilets, showers, etc.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Form

CHECK LIST HSE

10- PERSONAL PROTECTIVE EQUIPMENT


Port the wearing of safety equipment and always present and check
Compliance with standards (see IN16) all protective equipment meeting safety standards
Condition (suitable for continued use or disposal) the condition of personal protective equipment in good condition for wearing
and working with, and the presence of changes in the event of poor condition
of equipment

Established by HSE engineer :