0% found this document useful (0 votes)
11 views11 pages

Estimate Committee

The document outlines the status of various projects sanctioned under NABARD, CRF, and C&T over the last five years in Baramulla district. It details the estimated costs, funds allotted, expenditure, and completion status of each project, indicating whether they are completed, ongoing, or pending. Several projects have been completed, while others are in progress or have been transferred to different agencies for execution.

Uploaded by

Rais Aslam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views11 pages

Estimate Committee

The document outlines the status of various projects sanctioned under NABARD, CRF, and C&T over the last five years in Baramulla district. It details the estimated costs, funds allotted, expenditure, and completion status of each project, indicating whether they are completed, ongoing, or pending. Several projects have been completed, while others are in progress or have been transferred to different agencies for execution.

Uploaded by

Rais Aslam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

Present status of the under going/ ongoing/ pending projects sanctioned under NABARD during last five years

S. Name of Scheme District Division Constituency Sector Year of Estimated Cost Allotted 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 Present Status (Undergoing Target Achieve Physical Remarks
No Start Cost Project/Ongoing Project/Pending BM/SD ment %age
Project) BM/SD

Original Revised Funds Expdt Funds Expdt Funds Expdt Funds Expdt Funds Expdt Funds Expdt
Released Released Released Released Released Released
1 Gantamulla Bala / Payeen Road Baramulla Baramulla Uri RIDF-XXIII 2018-19 250.14 250.14 225.00 159.71 142.52 25.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Completed during 2021-22 3.50 3.70 100%
2 Kitchama Zandfaran Zoogiyar road Baramulla Baramulla Uri RIDF-XXIII 2018-19 601.68 601.68 560.63 145.65 145.65 78.51 76.11 30.00 30.00 82.90 67.88 7.25 7.22 0.00 0.00 Completed during 2023-24 10.50 10.10 100%
3 Tapper Kakawthal road including Baramulla Baramulla Wagoora- RIDF-XXIII 2018-19 697.37 697.37 642.94 235.54 235.54 122.72 117.86 29.12 8.44 0.00 0.00 0.00 0.00 0.00 0.00 Completed during 2022-23 7.00 7.50 100%
bypass with allied links at Kriri, District Kreeri
Baramaulla (Part - B)
4 Heewan Kawhar & Allied Roads Baramulla Baramulla Baramulla RIDF-XXV 2020-21 350.00 350.00 247.22 94.49 0.00 0.00 0.00 100.00 49.64 153.67 112.91 21.13 20.23 0.00 0.00 Completed 2024-25 4.74 4.74 100%
5 Vizer Thindum Kriri Road (Phase-I) Baramulla Baramulla Wagoora- RIDF-XXV 2020-21 250.00 250.00 213.48 67.31 0.00 42.48 33.22 75.00 73.24 92.00 65.51 12.45 12.45 0.00 0.00 Completed- 2023-24 3.47 3.47 100%
Kreeri
6 Thandikasi- Gaivgaren-Shirpora road Baramulla Baramulla Baramulla RIDF-XXVI 2021-22 338.89 338.89 323.76 0.00 0.00 50.63 50.63 50.00 30.59 174.05 76.63 137.00 137.00 0.00 0.00 Completed 2024-25 6.00 5.85 100%
7 Khadniyar Jalsheeri and Drangbal inner Baramulla Baramulla Baramulla RIDF-XXVI 2021-22 489.17 489.17 378.48 0.00 0.00 56.21 56.21 100.00 56.65 206.56 195.03 4.55 4.55 0.00 0.00 Completed- 2023-24 10.00 10.00 100%
roads
8 Wagila Najibhat Chandoosa Road Baramulla Baramulla Baramulla RIDF-XXVII 2021-22 443.98 443.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Work executed by PMGSY - - 0% Transferred to PMGSY
9 Kohlina Bandibala Road - Baramulla Baramulla Wagoora- RIDF-XXVII 2021-22 435.18 435.18 341.76 0.00 0.00 0.00 0.00 48.75 16.52 77.78 5.40 72.79 0.00 0.00 0.00 Work abodoned by the original 7.00 - 8% Fresh tenders invited for
Kreeri contractor balance work - under
technical evaluation with
Circle Office
10 Baramulla Garrison in Progress Baramulla Baramulla Baramulla RIDF-XXVIII 2022-23 820.33 820.33 572.66 0.00 0.00 0.00 0.00 221.48 0.00 175.00 0.00 380.00 304.59 0.00 0.00 In Progress 8.77 7.50 85%
11 Katiyanwali to Nagibhat via Fresdub Baramulla Baramulla Baramulla RIDF-XXVIII 2023-24 441.04 441.04 316.79 0.00 0.00 0.00 0.00 0.00 0.00 77.78 0.00 150.00 150.00 0.00 0.00 In Progress 4.50 - 55%
and Khaitangan with allied links.
12 Laridoora and Dangerpora inner links Baramulla Baramulla Baramulla RIDF-XXVIII 2023-24 377.15 377.15 303.40 0.00 0.00 0.00 0.00 0.00 0.00 77.78 40.67 235.00 231.90 0.00 0.00 co mpleted 2024-25 4.00 4.00 100%
with Rajpora Links
13 Upgradation of inner links of Baramulla Baramulla Wagoora- RIDF-XXVIII 2023-24 894.38 894.38 646.25 0.00 0.00 0.00 0.00 0.00 0.00 140.00 0.00 100.00 100.00 0.00 0.00 In Progress 10.00 3.65 35%
Krankshivan, Panzipora & Wagub Kreeri
14 Upgradation of Hygam Trumbgund Baramulla Baramulla Wagoora- RIDF-XXVIII 2023-24 1075.33 1075.33 716.42 0.00 0.00 0.00 0.00 0.00 0.00 140.00 57.93 440.00 435.18 0.00 0.00 In Progress 10.00 9.70 85%
Rengi road including inner links Kreeri
including Hygam Wet Lands Reserve
(Rakh Hygam)
15 Strengthening/Up-gradation of Nijibhat Baramulla Baramulla Baramulla RIDF-XXIX 2024-25 626.40 626.40 468.03 - - - - - - - - 150.00 136.62 0.00 0.00 In Progress 2.50 2.00 60%
Khurshi Road including Najibhat inner
links
16 Up-gradation of Nowgam Doaba with Baramulla Baramulla Baramulla RIDF-XXIX 2024-25 387.60 387.60 310.06 - - - - - - - - 220.00 209.53 0.00 0.00 In Progress 4.00 3.00 90%
allied Links -
17 Construction of 1x50 Mtr Span Trussed Baramulla Baramulla Wagoora- RIDF-XXIX 2024-25 792.09 792.09 785.00 - - - - - - - - 0.00 0.00 0.00 0.00 Not started - - 0% Work allotted - 11/2024 -
Girder Bridge over Nallah Ningli near Kreeri Locals demand change of site
Shrunz Water Fall -
Present status of the under going/ ongoing/ pending projects sanctioned under CRF during last five years
S. Name of Scheme District Division Constituency Sector Year of Estimated Cost Allotted 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 Present Status (Undergoing Target Achieve Physical Remarks
No Start Cost Project/Ongoing Project/Pending BM/SD ment %age
Project) BM/SD

Original Revised Funds Expdt Funds Expdt Funds Expdt Funds Expdt Funds Expdt Funds Expdt
Released Released Released Released Released Released
1 Upgradation/ Widenng of Choora Baramulla Baramulla Wagoora- CRF 2017-18 1500 1500 1232.98 390.00 390.00 171.92 171.83 11.23 5.94 0.00 0.00 0.00 0.00 0.00 0.00 Completed during 2020-21 22.50 23.75 100%
Burzwachan, Dardpora, Tilgam Road Kreeri
including Authoora Hail Bulgam Link
2 Upgradation of Sheeri Heewan Laridora Baramulla Baramulla Baramulla CRF 2017-18 1334.29 1334.29 1027.08 0.00 0.00 112.87 112.87 732.20 718.21 59.09 50.02 76.90 40.51 0.00 0.00 Completed during 2024-25 13.00 13.00 100%
Sultanpora Road (Baramulla
3 Upgradation of Kanispora Kandi Road Baramulla Baramulla Baramulla CRF 2017-18 1153.19 1153.19 1076.05 39.141 39.141 14.00 14.00 0.00 0.00 30.00 5.74 80.00 57.38 0.00 0.00 Completed during 2024-25 17.75 16.00 100%
Via Singhpora including Katianwali &
Allied Links (Job No: CRF J&K 2017-18
Code 207)
4 Widening/Upgradation of Razweth Baramulla Baramulla Wagoora- CRF 2017-18 1393 1393 1172.33 Details can be had from R&B Division Sopore 426.76 426.76 0.00 0.00 0.00 0.00 Completed during 2023-24 15.00 15.00 100% Transferred from R&B
wagub Amargrah Krankshivan and Seer Kreeri Division Sopore after re-
road including inner links organization
5 Widening/Upgr. of Hygam Tarzoo Baramulla Baramulla Wagoora- CRF 2017-18 1415 1415 1110.23 Details can be had from R&B Division Sopore 0.00 0.00 0.00 0.00 0.00 0.00 Completed during 2022-23 15.00 14.42 100% Transferred from R&B
Sopore road Kreeri Division Sopore after re-
organization
Present status of the under going/ ongoing/ pending projects sanctioned under C&T during last five years
S. Name of Scheme District Division Constituency Sector Year of Estimated Cost Allotted 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 Present Status (Undergoing Target Achieve Physical Remarks
No Start Cost Project/Ongoing Project/Pending BM/SD ment %age
Project) BM/SD

Original Revised Funds Expdt Funds Expdt Funds Expdt Funds Expdt Funds Expdt Funds Expdt
Released Released Released Released Released Released
1 Pattan inner links balance Portion Baramulla Baramulla Pattan C&T 2020-21 27.00 27.00 18.64 27.00 16.81 - - - - - - - - - - Completed 1.00 1.00 100%
2 Buran Gunjipora road balance portion Baramulla Baramulla Pattan C&T 2020-21 45.00 43.70 42.43 43.70 36.64 - - - - - - - - - - Completed 2.00 1.70 100%

3 Singhpora (Pattan) inner links Baramulla Baramulla Pattan C&T 2020-21 36.00 33.04 32.08 33.04 19.00 - - - - - - - - - - Completed 1.10 0.56 100%
4 Palhalan inner links Baramulla Baramulla Pattan C&T 2020-21 45.00 42.94 41.69 42.94 42.85 - - - - - - - - - - Completed 2.00 1.50 100%
5 Wanigam inner links Baramulla Baramulla Pattan C&T 2020-21 36.00 31.60 30.68 31.60 31.25 - - - - - - - - - - Completed 1.10 1.18 100%
6 Khargam Pattan link roads Baramulla Baramulla Pattan C&T 2020-21 27.00 26.46 25.69 26.46 13.61 - - - - - - - - - - Completed 1.00 0.75 100%
7 Nihalpora pattan inner links Baramulla Baramulla Pattan C&T 2020-21 50.00 50.00 42.92 50.00 42.25 - - - - - - - - - - Completed 1.65 1.65 100%
8 Wagoora Wagila road ( Km 4th & 5th Baramulla Baramulla Sangrama C&T 2020-21 30.00 28.06 27.24 28.06 0.00 - - - - - - - - - - Handedover to PMGSY 1.30 - Transferred to PMGSY
balance portion)
9 Nowpora inner links Baramulla Baramulla Sangrama C&T 2020-21 45.00 45.00 26.88 45.00 39.34 - - - - - - - - - - Completed 0.95 0.95 100%
10 Wagoora inner links Baramulla Baramulla Sangrama C&T 2020-21 30.00 28.24 27.42 28.24 26.13 - - - - - - - - - - Completed 1.30 1.00 100%
11 Watergam Kalantra road ( 4.00 kms). Baramulla Baramulla Sangrama C&T 2020-21 80.00 80.00 53.76 80.00 67.06 - - - - - - - - - - Completed 2.60 2.25 100%
12 Shrakwara inner links Baramulla Baramulla Sangrama C&T 2020-21 30.00 27.06 26.27 27.06 23.39 - - - - - - - - - - Completed 1.30 1.00 100%
13 Katari Mohalla, Bandi Bala, Nilsar roads Baramulla Baramulla Sangrama C&T 2020-21 50.00 47.28 45.90 47.28 40.22 - - - - - - - - - - Completed 1.55 1.29 100%

14 Darul-Aloom Nowpora link Baramulla Baramulla Sangrama C&T 2020-21 15.00 15.00 0.00 15.00 10.89 - - - - - - - - - - Completed 0.60 0.45 100%
15 Noorbagh Bowli Road Baramulla Baramulla Baramulla C&T 2020-21 30.00 26.29 25.52 26.29 0.00 - - - - - - - - - - Not Executed - Deep Drain under 1.30 -
construction
16 Kanlibagh Sangri & Gujjar Sangri Road Baramulla Baramulla Baramulla C&T 2020-21 24.00 21.06 20.45 21.06 19.94 - - - - - - - - - - Completed 1.55 1.55 100%

17 Road leading to Ziyarat Sharief Baramulla Baramulla Baramulla C&T 2020-21 30.00 26.33 25.56 26.33 22.96 - - - - - - - - - - Completed 1.85 1.85 100%
Khanpora / links
18 Baramulla Baba Reshi Sahib Road incl. Baramulla Baramulla Baramulla C&T 2020-21 45.00 41.30 40.10 41.30 41.06 - - - - - - - - - - Completed 2.90 2.90 100%
links
19 Khowjabagh Inner Links upto High Baramulla Baramulla Baramulla C&T 2020-21 45.00 39.50 38.35 39.50 35.56 - - - - - - - - - - Completed 2.60 2.50 100%
School & Jail Road
20 Old Town Baramulla (Chattipadshahi Baramulla Baramulla Baramulla C&T 2020-21 30.00 26.34 25.57 26.34 25.87 - - - - - - - - - - Completed 1.55 1.55 100%
Faqirwani Road)
21 Kanispora Juhama road Baramulla Baramulla Baramulla C&T 2020-21 50.00 44.53 43.23 19.53 0.00 43.22 39.23 - - - - - - - - Completed 2.50 1.50 100%
22 Singhpora Nowpora road Baramulla Baramulla Baramulla C&T 2020-21 60.00 60.00 35.84 60.00 55.24 - - - - - - - - - - Completed 1.70 1.75 100%
23 Sherwani Colony inner links Baramulla Baramulla Baramulla C&T 2020-21 50.00 45.06 43.75 45.06 0.00 43.75 27.00 - - - - - - - - Completed 2.50 2.00 100%
24 Jetty link road Baramulla Baramulla Baramulla C&T 2020-21 40.00 36.76 35.69 36.76 32.33 - - - - - - - - - - Completed 2.00 2.00 100%
25 Reservior link road at Sangri Baramulla Baramulla Baramulla C&T 2020-21 42.00 36.90 35.83 36.90 35.35 - - - - - - - - - - Completed 1.35 1.35 100%
26 Kanthbagh inner links Baramulla Baramulla Baramulla C&T 2020-21 37.00 32.92 31.96 32.92 0.00 - - - - - - - - - - Completed 2.30 0.00 100%
27 Up-Town roads of Baramulla town incl. Baramulla Baramulla Baramulla C&T 2020-21 45.00 45.00 17.82 45.00 41.55 - - - - - - - - - - Completed 1.40 1.50 100%
left out links.
28 Link road leading to Polytechnic Baramulla Baramulla Baramulla C&T 2020-21 0.00 16.29 15.80 15.00 11.44 - - - - - - - - - - Completed 0.00 0.40 100%
College at Kanispora Baramulla
29 Upper Links at Khanpora Baramulla Baramulla Baramulla C&T 2020-21 0.00 25.00 15.80 25.00 24.99 - - - - - - - - - - Completed 0.00 0.70 100%
30 Juhama Kanispora Baramulla Baramulla Baramulla C&T 2020-21 0.00 34.40 15.80 30.00 15.10 - - - - - - - - - - Completed 1.40 0.60 100%
31 Janbazpora Binner road Baramulla Baramulla Rafiabad C&T 2020-21 20.00 17.55 17.04 17.55 13.03 - - - - - - - - - - Completed 1.40 1.40 100%
32 Binner Venkura Baramulla Baramulla Rafiabad C&T 2020-21 50.00 50.00 0.00 50.00 49.40 - - - - - - - - - - Completed 2.50 2.00 100%
33 Binner Kawdara Baramulla Baramulla Rafiabad C&T 2020-21 38.00 31.38 30.47 31.38 30.63 - - - - - - - - - - Completed 1.00 1.00 100%
1 Wanseran Malpora Audoora road Baramulla Baramulla Baramulla C&T 2021-22 36.00 32.02 31.30 - - 31.61 31.61 - - - - - - - - Completed 1.21 1.10 100%
2 Sheeri inner links including Hospital Baramulla Baramulla Baramulla C&T 2021-22 36.00 28.61 27.89 - - 28.58 28.57 - - - - - - - - Completed 1.17 1.17 100%
link roads
3 Khawajabagh Jail Road including High Baramulla Baramulla Baramulla C&T 2021-22 36.00 28.76 28.04 - - 26.80 29.79 - - - - - - - - Completed 1.21 1.15 100%
School Road
4 Ushkura Fatehpora road including Baramulla Baramulla Baramulla C&T 2021-22 72.00 56.78 55.34 - - 56.78 56.44 - - - - - - - - Completed 2.56 2.64 100%
Hospital link
5 Kanlibagh Sangri and Gujar Sangri Baramulla Baramulla Baramulla C&T 2021-22 27.00 21.50 20.96 - - 20.63 20.63 - - - - - - - - Completed 0.90 0.90 100%
Road
6 Road leading to Fatehpora via Degree Baramulla Baramulla Baramulla C&T 2021-22 27.00 21.14 20.60 - - 21.14 21.04 - - - - - - - - Completed 0.90 0.90 100%
college
7 Kaliban Galibal road Baramulla Baramulla Baramulla C&T 2021-22 40.00 31.41 30.60 - - 29.04 29.04 - - - - - - - - Completed 1.35 1.10 100%
8 Baramulla Hajibal Road Baramulla Baramulla Baramulla C&T 2021-22 67.00 52.81 51.47 - - 49.78 49.78 - - - - - - - - Completed 2.25 2.25 100%
9 old Town Baramulla link roads Baramulla Baramulla Baramulla C&T 2021-22 45.00 35.23 34.33 - - 33.13 33.09 - - - - - - - - Completed 1.80 1.80 100%
10 Noorbagh Bowli Road Baramulla Baramulla Baramulla C&T 2021-22 36.00 28.25 27.53 - - 21.78 21.48 - - - - - - - - Completed 1.15 1.00 100%
11 Kanlibagh Gurdawara Road with allied Baramulla Baramulla Baramulla C&T 2021-22 54.00 1.00 45.06 - - 42.41 42.41 - - - - - - - - Completed 2.10 1.60 100%
links
12 Faqir Bagh Kandi Sultanpora road Baramulla Baramulla Baramulla C&T 2021-22 27.00 21.42 20.88 - - 20.60 20.60 - - - - - - - - Completed 0.77 0.77 100%
13 Malpora Sachalwari road Baramulla Baramulla Baramulla C&T 2021-22 54.00 48.70 47.62 - - 47.14 47.14 - - - - - - - - Completed 1.85 1.70 100%
14 Chandsooma Kralhar road Baramulla Baramulla Baramulla C&T 2021-22 27.00 21.30 20.76 - - 20.93 20.93 - - - - - - - - Completed 0.90 0.90 100%
15 Guru Nanak Model school Kanlibagh Baramulla Baramulla Baramulla C&T 2021-22 27.00 23.08 22.54 - - 20.51 19.91 - - - - - - - - Completed 0.90 0.80 100%
upto upper Cherdari Baba Reshi Road

16 Faqir Bagh Kandi Sultanpora road Baramulla Baramulla Baramulla C&T 2021-22 0.00 25.00 20.49 - - 16.67 16.67 - - - - - - - - Completed 0.75 0.75 100%
(Balance Portion upto Masjid Razakia)

17 DPS Link at Delina Baramulla Baramulla Baramulla Baramulla C&T 2021-22 0.00 25.00 21.37 - - 24.48 24.48 - - - - - - - - Completed 0.95 0.80 100%
18 Fatehgrah Inner Links Baramulla Baramulla Baramulla C&T 2021-22 0.00 25.00 21.54 - - 21.54 21.54 - - - - - - - - Completed 0.80 0.85 100%
19 Uptown Links at Baramulla Baramulla Baramulla Baramulla C&T 2021-22 0.00 25.00 19.79 - - 19.66 19.66 - - - - - - - - Completed 0.85 0.85 100%
S. Name of Scheme District Division Constituency Sector Year of Estimated Cost Allotted 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 Present Status (Undergoing Target Achieve Physical Remarks
No Start Cost Project/Ongoing Project/Pending BM/SD ment %age
Project) BM/SD

20 Balance links at Kanispora (Adbi Baramulla Baramulla Baramulla C&T 2021-22 0.00 25.00 20.07 - - 19.35 19.35 - - - - - - - - Completed 0.75 0.75 100%
Markaz), Madina Colony Sector B,
Blessing School Lane - lesft side of
Baramulla Srinagar Road
21 Road leadign off from Ushkura Baramulla Baramulla Baramulla C&T 2021-22 0.00 10.00 8.18 - - 8.17 8.17 - - - - - - - - Completed 0.30 0.30 100%
Fatehpora Road & Fatehpora to PHE
Filteration Plant
22 Kreeri Suchipora Fresthaar Road Baramulla Baramulla Sangrama C&T 2021-22 27.00 22.42 21.88 - - 22.02 22.02 - - - - - - - - Completed 1.60 1.60 100%
23 Kreeri Wanigam Road Baramulla Baramulla Sangrama C&T 2021-22 58.00 48.16 47.00 - - 44.50 43.50 - - - - - - - - Completed 3.70 3.21 100%
24 Nowpora inner links including Cold Baramulla Baramulla Sangrama C&T 2021-22 36.00 30.19 29.47 - - 29.15 29.15 - - - - - - - - Completed 0.85 0.85 100%
Store road
25 Kalantra Shahkul road Baramulla Baramulla Sangrama C&T 2021-22 27.00 22.64 22.10 - - 15.00 15.00 - - - - - - - - Completed 0.74 0.49 100%
26 Khan Mohalla Dardpora including Baramulla Baramulla Sangrama C&T 2021-22 36.00 30.16 29.44 - - 29.02 29.02 - - - - - - - - Completed 0.96 0.90 100%
Gurduwara link
27 Shirpora road from Gurduwara to MS Baramulla Baramulla Sangrama C&T 2021-22 36.00 30.22 29.50 - - 28.96 28.96 - - - - - - - - Completed 1.00 0.90 100%
Shirpora including Mir Mohalla
28 Sharakwara Baramulla including Baramulla Baramulla Sangrama C&T 2021-22 27.00 22.53 21.99 - - 20.73 20.73 - - - - - - - - Completed 0.69 0.70 100%
Chanmohalla link
29 Wahidina Shirpora including Jethar Baramulla Baramulla Sangrama C&T 2021-22 31.00 0.00 - - 0.00 0.00 - - - - - - - - Approved under NABARD - - -
road
30 Tangpora Links near Graveyard Baramulla Baramulla Sangrama C&T 2021-22 0.00 14.00 11.75 - - 11.75 11.75 - - - - - - - - Completed 0.50 0.50 100%
Nowpora
31 Watergam Kalantra Baramulla Baramulla Sangrama C&T 2021-22 0.00 14.00 11.61 - - 11.61 11.61 - - - - - - - - Completed 0.50 0.50 100%
32 Sultanpora Beigh pati including Baramulla Baramulla Sangrama C&T 2021-22 0.00 20.00 16.68 - - 16.68 16.68 - - - - - - - - Completed 0.60 0.60 100%
Thokurpati & Lone Mohalla
33 Up-gradation of Beighpati road Baramulla Baramulla Sangrama C&T 2021-22 0.00 35.50 35.50 - - 11.00 10.84 - - - - - - - - Completed 1.10 0.35 100%
(Balance Portion)
34 Up-gradation of Thokerpati Lone Baramulla Baramulla Sangrama C&T 2021-22 0.00 23.07 23.07 - - 3.00 2.80 - - - - - - - - Completed 0.72 - 100%
Mohalla (Balance Portion)
35 Palhalan inner links Baramulla Baramulla Pattan C&T 2021-22 40.00 33.33 32.53 - - 33.28 33.27 - - - - - - - - Completed 1.25 1.25 100%
36 K.P Payeen , Batakcheck Janvanpora Baramulla Baramulla Pattan C&T 2021-22 27.00 22.28 21.74 - - 22.14 22.14 - - - - - - - - Completed 0.90 0.90 100%
37 Pattan Babareshi Sahib road (KM 1 to Baramulla Baramulla Pattan C&T 2021-22 81.00 67.43 65.81 - - 65.17 65.17 - - - - - - - - Completed 2.50 2.46 100%
15)
38 Tilgam Kralpora Vailoo road Baramulla Baramulla Pattan C&T 2021-22 36.00 29.79 29.07 - - 22.00 22.00 - - - - - - - - Completed 0.85 0.58 100%
39 Wanigam Hurcheck Hurhandpora Baramulla Baramulla Pattan C&T 2021-22 27.00 22.63 22.09 - - 22.52 22.51 - - - - - - - - Completed 0.77 0.77 100%
40 Alamdar colony Malik Bagh Ward 11 Baramulla Baramulla Pattan C&T 2021-22 16.00 13.41 13.09 - - 13.38 13.38 - - - - - - - - Completed 0.45 0.45 100%
Pattan
41 Sonium to Check Sari via Jamia Masjid Baramulla Baramulla Pattan C&T 2021-22 0.00 20.00 17.26 - - 17.25 17.25 - - - - - - - - Completed 0.63 0.63 100%

42 Janzpora Binner (Balance Portion) Baramulla Baramulla Rafiabad C&T 2021-22 27.00 21.36 20.82 - - 19.80 18.80 - - - - - - - - Completed 0.94 0.94 100%
1 Baramulla Town Roads including Baramulla Baramulla C&T 2022-23 140.00 117.98 114.54 - - - - 117.98 101.02 - - - - - - Completed 3.52 3.52 100%
Kanlibagh links
2 Old Town Baramulla links Baramulla Baramulla C&T 2022-23 90.00 75.84 73.63 - - - - 75.84 71.38 - - - - - - Completed 2.27 2.27 100%
3 Noorbagh Bowli Road balance Portion Baramulla Baramulla C&T 2022-23 45.00 38.70 37.57 - - - - 38.70 36.82 - - - - - - Completed 1.15 1.15 100%
including allied links
4 Khanpora Inner Links Baramulla Baramulla C&T 2022-23 25.00 21.25 20.63 - - - - 21.25 15.85 - - - - - - Completed 0.66 0.66 100%
5 Khowjabagh Inner Links (Balance Baramulla Baramulla C&T 2022-23 35.00 30.10 29.22 - - - - 30.10 29.00 - - - - - - Completed 0.93 0.93 100%
Portion)
6 Kanispora Inner Links including Check Baramulla Baramulla C&T 2022-23 70.00 59.48 57.75 - - - - 59.48 55.39 - - - - - - Completed 1.70 1.70 100%
Kanispora
7 Varmul Heights inner Links Baramulla Baramulla C&T 2022-23 35.00 30.09 29.21 - - - - 30.09 29.49 - - - - - - Completed 0.85 0.85 100%
8 Kralhar Inner Links Baramulla Baramulla C&T 2022-23 40.00 33.99 33.00 - - - - 33.99 0.00 - - - - - - - 0.96 - -
9 Sangrama Inner Links (Bahar/ Syed Baramulla Baramulla C&T 2022-23 37.00 31.60 30.68 - - - - 31.60 30.63 - - - - - - Completed 0.90 0.90 100%
Colony)
10 Mongam Darwa including allied links Baramulla Baramulla C&T 2022-23 24.75 21.17 20.54 - - - - 21.17 20.53 - - - - - - Completed 0.60 0.60 100%
11 Dardpora Shipora Mir Mohalla Road Baramulla Baramulla C&T 2022-23 24.75 21.56 20.92 - - - - 21.56 20.81 - - - - - - Completed 0.60 0.60 100%
12 Nowpora Inner Links (Balance Portion) Baramulla Baramulla C&T 2022-23 30.00 26.03 25.27 - - - - 26.03 25.80 - - - - - - Completed 0.68 0.68 100%

13 Tapper Bala Inner Link Baramulla Baramulla C&T 2022-23 37.00 31.81 30.88 - - - - 31.81 31.11 - - - - - - Completed 0.90 0.90 100%
14 Wanigam Bala/ Payeen Inner Links Baramulla Baramulla C&T 2022-23 37.00 32.12 31.18 - - - - 32.12 26.51 - - - - - - Completed 0.90 0.70 100%
15 Pattan Inner Links including Alamdar Baramulla Baramulla C&T 2022-23 37.00 31.32 30.41 - - - - 31.32 27.31 - - - - - - Completed 0.90 0.75 100%
Colony opp SDM Office
16 Jeel Bridge to Azad Colony Singhproa Baramulla Baramulla C&T 2022-23 37.00 31.26 30.35 - - - - 31.26 31.26 - - - - - - Completed 0.90 0.90 100%

17 Palhalan Inner Links including Police Baramulla Baramulla C&T 2022-23 55.00 46.61 45.25 - - - - 46.61 46.21 - - - - - - Completed 1.39 1.39 100%
Post, Saderbal & Tantray Mohalla
18 Janbazpora inner Links including Baramulla Baramulla C&T 2022-23 55.00 47.75 46.36 - - - - 47.75 46.30 - - - - - - Completed 1.34 1.34 100%
Janbazpora Binner road Balance
portion
19 Gangipora Nallah Mundhihari New Baramulla Baramulla C&T 2022-23 20.00 17.11 16.61 - - - - 17.11 16.90 - - - - - - Completed 0.49 0.49 100%
National Highway ( Petroal Pump)
20 Baramulla Baba Reshi to Mandir Link Baramulla Baramulla C&T 2022-23 20.00 17.16 16.66 - - - - 17.16 16.66 - - - - - - Completed 0.46 0.46 100%
Kachwa
21 Kachwa Muqam Inner Links including Baramulla Baramulla C&T 2022-23 22.00 19.03 18.48 - - - - 19.03 18.17 - - - - - - Completed 0.53 0.53 100%
Ziyarat Link & Chopan Link
22 Buran Ganjipora Inner Links Baramulla Baramulla C&T 2022-23 16.00 13.68 13.28 - - - - 13.68 13.65 - - - - - - Completed 0.39 0.39 100%
S. Name of Scheme District Division Constituency Sector Year of Estimated Cost Allotted 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 Present Status (Undergoing Target Achieve Physical Remarks
No Start Cost Project/Ongoing Project/Pending BM/SD ment %age
Project) BM/SD

23 Souch Palpora Links Baramulla Baramulla C&T 2022-23 17.00 14.43 14.01 - - - - 14.43 0.79 - - - - - - - 0.41 - - Dispute between two groups

24 Macadamization of Hill top Ushkara Baramulla Baramulla C&T 2022-23 15.00 14.27 13.85 - - - - 14.27 9.88 - - - - - - Completed 0.45 0.45 100%
links. 0.5 kms
Baramulla
25 Kawhar Galibal Road including (balance Baramulla Baramulla C&T 2022-23 60.00 51.56 50.06 - - - - 51.56 46.52 - - - - - - Completed 1.38 1.38 100%
portion of Malpora Wanseeran)

26 Shrakwara Najibhat Road Baramulla Baramulla C&T 2022-23 24.75 21.16 23.89 - - - - 21.16 21.15 - - - - - - Completed 0.60 0.54 100%
27 Kriri Fresthra Tilgam Road Baramulla Baramulla C&T 2022-23 40.00 34.22 33.22 - - - - 34.22 19.41 - - - - - - Completed 1.66 0.60 100%
28 Kriri Suchipora Fresthar Road (Km 3-5) Baramulla Baramulla C&T 2022-23 35.00 29.94 29.07 - - - - 29.94 25.84 - - - - - - Completed 0.85 0.85 100%

29 Faqirbagh Kandi Sultanpora Road Baramulla Baramulla C&T 2022-23 100.00 86.85 84.32 - - - - 86.85 73.77 - - - - - - Completed 2.43 2.40 100%
(Balance Portion of Constituency)
30 Jeel Bridge to Mustafa Colony Baramulla Baramulla C&T 2022-23 35.00 35.00 34.63 - - - - 35.00 34.06 - - - - - - Completed 0.85 0.85 100%
Singhproa Road
31 Kachwa Masjid Angan Road Baramulla Baramulla C&T 2022-23 35.00 35.00 33.77 - - - - 35.00 33.66 - - - - - - Completed 0.84 0.84 100%
32 Kanispora Johama Raod Baramulla Baramulla C&T 2022-23 30.00 30.00 28.85 - - - - 30.00 26.12 - - - - - - Completed 0.80 0.80 100%
33 Fatehgrah / Sheeri inner links Baramulla Baramulla C&T 2022-23 35.00 35.00 33.86 - - - - 35.00 32.19 - - - - - - Completed 0.80 0.80 100%
34 Mughal Mohalla to Kalayban road Baramulla Baramulla C&T 2022-23 35.00 35.00 34.74 - - - - 35.00 33.25 - - - - - - Completed 0.80 0.80 100%
35 Shumlaran & Faquirbagh inner links Baramulla Baramulla C&T 2022-23 30.00 30.00 28.62 - - - - 30.00 27.60 - - - - - - Completed 0.70 0.70 100%
1 Kalantra Payeen Dandmoh Road Baramulla Baramulla C&T 2023-24 25.00 20.48 19.77 - - - - - - 20.48 19.77 - - - - Completed 0.62 0.62 100%
2 Masjid Angan to Kachwa road Baramulla Baramulla C&T 2023-24 15.00 12.66 12.22 - - - - - - 12.67 12.21 - - - - Completed 0.38 0.38 100%
3 Muran- Sultanpora Road Baramulla Baramulla C&T 2023-24 25.00 20.53 19.82 - - - - - - 20.54 19.80 - - - - Completed 0.53 0.53 100%
4 Inner links with sumo stand at Wagoora Baramulla Baramulla C&T 2023-24 25.00 21.10 20.37 - - - - - - 21.10 20.35 - - - - Completed 0.64 0.64 100%

5 Sharkwara inner links including Baramulla Baramulla C&T 2023-24 35.00 29.53 28.51 - - - - - - 29.54 28.70 - - - - Completed 0.89 0.89 100%
Panchayat , Girls High School etc.
6 Inner links at wagila Baramulla Baramulla C&T 2023-24 25.00 21.04 20.32 - - - - - - 21.05 20.32 - - - - Completed 0.60 0.60 100%
7 Inner links At Muqam and Darwa Baramulla Baramulla C&T 2023-24 35.00 29.57 28.55 - - - - - - 30.15 28.78 - - - - Completed 0.90 0.90 100%
8 Sultanpora Adda to Thokarpati Baramulla Baramulla C&T 2023-24 35.00 28.74 27.75 - - - - - - 28.75 28.22 0.09 0.09 - - Completed 0.89 0.89 100%
Including Lone Mohalla
9 Kalantara Bala , Kalantara Payeen Inner Baramulla Baramulla C&T 2023-24 25.00 20.53 19.82 - - - - - - 20.04 19.81 0.20 0.20 - - Completed 0.60 0.60 100%
links
10 Inner Links at Watergam Durhama Baramulla Baramulla C&T 2023-24 25.00 20.53 19.82 - - - - - - 20.04 19.82 - - - - Completed 0.60 0.60 100%
11 Link road at Hussainabad Lane No.3 Baramulla Baramulla C&T 2023-24 20.00 16.11 15.55 - - - - - - 16.11 15.92 - - - - Completed 0.50 0.50 100%
Watergam Wagoora
12 Daulatpora Inner Links Baramulla Baramulla C&T 2023-24 25.00 20.14 19.44 - - - - - - 20.24 19.30 0.13 0.13 - - Completed 0.55 0.55 100%
13 Saloosa inner links , Khanday Mohalla Baramulla Baramulla C&T 2023-24 30.00 24.16 23.33 - - - - - - 26.69 17.84 0.31 0.31 - - Completed 0.80 0.50 100%

14 Forest Lane Sangrama incld. Darul Baramulla Baramulla C&T 2023-24 30.00 24.14 23.30 - - - - - - 24.44 23.50 - - - - Completed 0.77 0.77 100%
uloom
15 Audoora Ziyarat Sharief, Heewar & Baramulla Baramulla C&T 2023-24 35.00 28.83 27.83 - - - - - - 29.03 27.82 - - - - Completed 0.76 0.76 100%
Audoora Tuldaji Road (Audoora Ziyarat
Shareef and inner links)
16 Khaitangan and Hudpora internal road Baramulla Baramulla C&T 2023-24 35.00 28.67 27.68 - - - - - - 28.68 26.11 1.40 1.40 - - Completed 0.85 0.85 100%
including gousia colony ( Khaitangan
inner links)
17 Wahidina Shirpora Road (Upgradation Baramulla Baramulla C&T 2023-24 35.00 32.75 31.75 - - - - - - 33.08 31.66 - - - - Completed 0.89 0.89 100%
of Wahidina Road
18 Malpora Tuldaji Road (Upgradation of Baramulla Baramulla C&T 2023-24 30.00 24.62 23.77 - - - - - - 39.62 24.45 1.93 1.93 - - Completed 0.65 0.65 100%
Namblan Tuldaji inner links)
19 Nardari to kawhar including Internal Baramulla Baramulla C&T 2023-24 40.00 32.75 31.62 - - - - - - 52.75 38.02 - - - - Completed 1.00 1.00 100%
Road (Dangerpora, Naradari, kawhar
roads)
20 Delina Internal Roads Baramulla Baramulla C&T 2023-24 45.00 36.85 35.58 - - - - - - 37.15 34.87 - - - - Completed 1.10 1.10 100%
21 Kachwa Jathar Road (upgradation of Baramulla Baramulla C&T 2023-24 40.00 30.28 29.23 - - - - - - 33.58 20.93 0.33 0.33 - - Completed 0.89 0.89 100%
pati jethar)
22 Jetty Colony Internal Road (Sheikh ul Baramulla Baramulla C&T 2023-24 30.00 24.57 23.72 - - - - - - 39.57 22.33 - - - - Completed 0.74 0.74 100%
Alam colony Khawaja Bagh including
allied links)
23 Gutiyar Internal Road (Upgradation of Baramulla Baramulla C&T 2023-24 65.00 53.10 51.26 - - - - - - 85.60 53.10 - - - - Completed 1.58 1.58 100%
link road from pump house gutiyar via
culvert connecting Frestar main road
and from main road gutiyar via school
connecting Frestar and allied links at
Gutiyar)
24 Sangri Colony Internal Road & Internal Baramulla Baramulla C&T 2023-24 20.00 16.10 15.55 - - - - - - 16.10 15.09 0.36 0.36 - - Completed 0.50 0.50 100%
Road to Friends Colony &
Choorimarpora Internal (Chinar Bagh
Kanli Bagh including allied links)
25 Noorbagh bagh Road ( Sweeper colony Baramulla Baramulla C&T 2023-24 30.00 24.15 23.31 - - - - - - 24.35 23.30 0.50 0.50 - - Completed 0.75 0.75 100%
1st and 2nd including graveyard links)

26 Johama Internal Road Baramulla Baramulla C&T 2023-24 40.00 32.76 31.63 - - - - - - 32.76 32.20 - - - - Completed 1.00 1.00 100%
27 Upgradation of kralhar inner links Baramulla Baramulla C&T 2023-24 48.00 39.31 37.95 - - - - - - 39.39 36.59 - - - - Completed 1.22 1.22 100%
including bilal colony, sidiq colony
S. Name of Scheme District Division Constituency Sector Year of Estimated Cost Allotted 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 Present Status (Undergoing Target Achieve Physical Remarks
No Start Cost Project/Ongoing Project/Pending BM/SD ment %age
Project) BM/SD

28 Bagat Colony Kralhar links Baramulla Baramulla C&T 2023-24 12.00 9.83 9.49 - - - - - - 9.83 9.32 0.35 0.35 - - Completed 0.30 0.30 100%
29 Azadgunj to PHE Department & Baramulla Baramulla C&T 2023-24 60.00 49.11 47.41 - - - - - - 49.14 48.49 - - - - Completed 1.50 1.50 100%
Gulnarpark & Army Camp (Gulnar park
inner links and stadium colony links)

30 Upgradation of main road to Kawacheck Baramulla Baramulla C&T 2023-24 35.00 18.89 18.24 - - - - - - 22.50 16.32 - - - - Completed 0.50 0.46 100%
Sheikhpora to Water Tanky at
Kawcheck Kreeri
31 Mac of Kanlibagh link roads Baramulla Baramulla C&T 2023-24 35.00 28.17 27.20 - - - - - - 28.47 27.78 - - - - Completed 0.89 0.89 100%
32 Azadgunj to PHE deptt & Gulnar Park Baramulla Baramulla C&T 2023-24 28.00 28.00 28.00 - - - - - - 25.20 25.20 - - - - Completed 1.00 1.00 100%
and Army Camp (Gulnar Park Main
Road & Gousai Colony Inner Links)
33 Jetty Internal (Internal links of Sheikh-ul- Baramulla Baramulla C&T 2023-24 28.00 28.00 28.00 - - - - - - 26.42 0.00 - - - - Completed 0.88 0.88 100%
Alam Colony) & Alamdar Colony near
CRPF Camp
34 Gutiyar Internal, Ushkura Fatehpora Baramulla Baramulla C&T 2023-24 45.00 40.00 37.04 - - - - - - 36.02 30.09 4.67 4.67 - - Completed 1.00 1.00 100%
Road (Internal Links of Ushkura &
Rangwar), Ushkura Malikpora road upto
N. H via Kanthbagh, Fatehpora Fresthar
Road, & Internal Road at Fatehpora
including internal roads
35 Puthkhah Narjee Baramulla Baramulla C&T 2023-24 16.00 15.00 14.38 - - - - - - 13.50 13.50 - - - - Completed 0.40 0.40 100%
36 Waripora Payeen/Bala Links Baramulla Baramulla C&T 2023-24 20.00 20.00 19.92 - - - - - - 16.00 16.00 - - - - Completed 0.55 0.55 100%
37 Lalad Inner Links : (Zidal Link Road Baramulla Baramulla C&T 2023-24 40.00 40.00 31.39 - - - - - - 31.39 30.09 0.12 0.12 - - Completed 0.95 0.95 100%
Bon Lalad , Khanday Mohalla Link Lalad
, Dar Mohalla link Lalad , Shiekh
Mohalla Link Bon-Lalad
38 Takayabal Krankshivan road ( Hamdan Baramulla Baramulla C&T 2023-24 12.00 12.00 11.56 - - - - - - 10.80 0.00 10.60 10.60 - - Completed 0.30 0.30 100%
colony)
39 Upgradation of play field road at Baramulla Baramulla C&T 2023-24 23.00 23.00 20.03 - - - - - - 20.70 19.60 - - - - Completed 0.58 0.58 100%
Hygam
40 Puthkhah Ningli Baramulla Baramulla C&T 2023-24 14.38 14.38 14.38 - - - - - - 13.50 0.00 - - - - Completed 100%
41 Dardhajan Link Road Baramulla Baramulla C&T 2023-24 19.45 19.45 17.40 - - - - - - 7.40 0.00 - - - - Completed 100%
1 Upgd of Inner Links Bilal Mohalla & Baramulla Baramulla C&T 2024-25 30.00 30.00 23.95 - - - - - - - - 12.50 12.50 0.43 - Completed 0.77 0.50 100%
Usman Mohalla Johama
2 Link Road Gantamulla Mochi Mohalla Baramulla Baramulla C&T 2024-25 15.00 15.00 12.78 - - - - - - - - 10.22 9.67 0.37 0.37 Completed 0.26 0.26 100%
Link Road
3 Upgd Malik Mohalla Gohan Inner Links Baramulla Baramulla C&T 2024-25 30.00 30.00 24.43 - - - - - - - - 19.54 19.54 2.01 2.01 Completed 0.81 0.81 100%

4 Upgd of Shahamdan Colony Budgheri Baramulla Baramulla C&T 2024-25 40.00 40.00 30.68 - - - - - - - - 24.54 24.54 3.07 3.07 Completed 1.00 1.00 100%

5 Upgd of Audoora Inner Links Baramulla Baramulla C&T 2024-25 18.00 18.00 15.36 - - - - - - - - 12.29 12.29 1.51 1.51 Completed 0.43 0.43 100%
6 Upgd of Badmulla Paldaji Road Baramulla Baramulla C&T 2024-25 18.00 18.00 15.34 - - - - - - - - 12.27 12.26 1.52 1.52 Completed 0.40 0.40 100%
7 Link Road opp Masjid Abubakar & Baramulla Baramulla C&T 2024-25 15.00 15.00 12.45 - - - - - - - - 9.96 9.96 0.67 0.67 Completed 0.34 0.34 100%
Poshbagh at Gutiyar
8 Macadamization of Vizer inner links Baramulla Baramulla C&T 2024-25 40.00 40.00 32.71 - - - - - - - - 26.17 26.16 2.34 - Completed 1.02 1.02 100%
9 Macadamization of Baldaji to Takiya Baramulla Baramulla C&T 2024-25 45.00 45.00 36.19 - - - - - - - - 28.95 28.95 2.98 2.98 Completed 1.15 1.15 100%
Yousuf Shah Road
10 Macadamization of Bangdara inner links Baramulla Baramulla C&T 2024-25 25.00 25.00 19.68 - - - - - - - - 15.74 15.74 1.55 1.55 Completed 0.64 0.64 100%

11 Upgd of Chinar Bagh Cherdari Inner Baramulla Baramulla C&T 2024-25 35.00 35.00 28.14 - - - - - - - - 20.54 20.54 - - Completed 0.86 0.86 100%
Links
12 Upgd of Kalayban Mugal Mohalla Road Baramulla Baramulla C&T 2024-25 35.00 35.00 28.53 - - - - - - - - 22.82 22.38 - - Completed 0.77 0.77 100%

13 Upgd of Drangbal, Kirman Colony & Baramulla Baramulla C&T 2024-25 35.00 35.00 27.50 - - - - - - - - 22.00 22.00 2.44 2.44 Completed 0.87 0.87 100%
Chinar Colony
14 Upgradation of Road from Junction to Baramulla Baramulla C&T 2024-25 25.00 25.00 19.63 - - - - - - - - 15.70 15.70 1.61 1.61 Completed 0.64 0.64 100%
Govt. Boys Middle School Pethseer by
way of Widening/Placing/ Laying of
WBM G-II, WMM, BM ,SDBC and Seal
Coat
15 Macadamization of Shamdan Colony at Baramulla Baramulla C&T 2024-25 25.00 25.00 19.90 - - - - - - - - 15.92 15.82 0.69 0.69 Completed 0.63 0.63 100%
Khowjabagh
16 Macadamization of Sangrama forest Baramulla Baramulla C&T 2024-25 15.00 15.00 11.80 - - - - - - - - 9.44 9.44 0.97 0.97 Completed 0.38 0.38 100%
lane inner links
17 Macadamization of Khesipora inner Baramulla Baramulla C&T 2024-25 25.00 25.00 21.06 - - - - - - - - 16.85 16.85 1.75 1.75 Completed 0.64 0.64 100%
links.
18 Macadamization of Putnar Colony Baramulla Baramulla C&T 2024-25 25.00 25.00 20.84 - - - - - - - - 16.67 16.67 1.14 1.14 Completed 0.64 0.64 100%
Kreeri including Guage Link from
masjid sharief onwards
19 Macadamization of Gulberg Colony Baramulla Baramulla C&T 2024-25 20.00 20.00 15.74 - - - - - - - - 12.59 12.59 1.29 1.29 Completed 0.51 0.51 100%
Mongam from Panchayat Ghar
20 Macadamization of Bulgam inner lnks Baramulla Baramulla C&T 2024-25 18.00 18.00 14.15 - - - - - - - - 11.32 11.32 1.15 1.15 Completed 0.46 0.46 100%
S. Name of Scheme District Division Constituency Sector Year of Estimated Cost Allotted 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 Present Status (Undergoing Target Achieve Physical Remarks
No Start Cost Project/Ongoing Project/Pending BM/SD ment %age
Project) BM/SD

21 Macadamisation of link road from Baramulla Baramulla C&T 2024-25 20.00 20.00 16.68 - - - - - - - - 13.34 13.34 1.31 1.31 Completed 0.47 0.47 100%
Masjid Baitul Huda to Masjid Zakreen,
links at Kaslab Mohalla, Link at HS
Fatehpora High School and balance
link at Guriwan road at Fatehpora

22 Uplina Singhpora road Baramulla Baramulla C&T 2024-25 47.00 47.00 33.80 - - - - - - - - 33.80 33.76 - - Completed 1.17 1.17 100%
23 Macadamisation of road at Pathani Baramulla Baramulla C&T 2024-25 50.00 50.00 36.84 - - - - - - - - 29.47 25.41 - - Completed 2.14 1.50 100%
Bagh Kanilibagh and Sangri Colony,
Gulbergh Colony, Chinar Bagh, Friends
Colony, Ushkara
24 Macadamisation of road at Al Mustafa Baramulla Baramulla C&T 2024-25 10.00 10.00 8.54 - - - - - - - - 3.35 3.35 1.69 1.69 Completed 0.22 0.22 100%
Colony
25 Balance portion of road at Gulnar Park Baramulla Baramulla C&T 2024-25 10.00 10.00 8.53 - - - - - - - - 8.53 8.32 - - Completed 0.22 0.22 100%
Azad Gung
26 Upgradation/ improvement of Delina Baramulla Baramulla C&T 2024-25 10.00 10.00 8.93 - - - - - - - - 8.93 8.75 - - Completed 0.26 0.26 100%
Singhpora road
27 Macadamisation of link road from the Baramulla Baramulla C&T 2024-25 20.00 20.00 16.89 - - - - - - - - 13.51 13.50 1.36 1.36 Completed 0.61 0.61 100%
H/o Sani Singh to the H/o Mohd Abdulla
Sheikh at Pathania Bagh Kanilibagh
Baramulla
28 Upgradation of Inner Links at Vamul Baramulla Baramulla C&T 2024-25 20.00 20.00 15.65 - - - - - - - - 5.00 5.00 5.03 4.91 Completed 0.52 0.52 100%
heights coìony
29 Macadamłzation ol Baramulla Town Baramulla Baramulla C&T 2024-25 30.00 30.00 23.56 - - - - - - - - 9.00 9.00 7.28 - Completed 0.93 0.93 100%
Roads
30 Upgd of Dtangbal Inner Links Baramulla Baramulla C&T 2024-25 30.00 30.00 23.61 - - - - - - - - 0.00 0.00 11.81 - Completed 1.00 1.00 100%
31 Upgradation of Balance Parton of Baramulla Baramulla C&T 2024-25 20.00 20.00 15.69 - - - - - - - - 0.00 0.00 6.76 6.76 Completed 0.49 0.49 100%
Uplïna
Singhpora Road
32 U;›gü of Delinan Inner Links (Mehjoor Baramulla Baramulla C&T 2024-25 20.00 20.00 15.44 - - - - - - - - 5.50 5.50 4.70 4.70 Completed 0.44 0.44 100%

33 Upgd, Of Vakeel Bagh Sangrama Baramulla Baramulla C&T 2024-25 20.00 20.00 15.60 - - - - - - - - 5.20 5.20 4.91 4.91 Completed 0.52 0.52 100%
34 Upgd of Nilsar Takiya Yousuf Shah Baramulla Baramulla C&T 2024-25 20.00 20.00 15.79 - - - - - - - - 0.00 0.00 7.90 - Completed 0.52 0.52 100%
35 Upgd of Maqdam Mohalla inner linus at Baramulla Baramulla C&T 2024-25 20.00 20.00 15.73 - - - - - - - - 5.00 5.00 5.06 5.06 Completed 0.52 0.52 100%
Sfirakwara

36 Macadamization of Nowpora Mirangund Baramulla Baramulla C&T 2024-25 35.00 35.00 19.38 - - - - - - - - 5.25 5.25 6.70 6.70 Completed 0.64 0.64 100%
Puthhhan and allled links

37 Macadamization of Gnd Station to Baramulla Baramulla C&T 2024-25 35.00 35.00 19.61 - - - - - - - - 0.00 0.00 8.46 - Completed 0.57 0.57 100%
Chenned road via Arfeen School of
Exœllence
38 Upgd of Amarghad Inner Linas Baramulla Baramulla C&T 2024-25 60.00 60.00 45.54 - - - - - - - - 0.00 0.00 21.84 - Completed 1.54 1.54 100%
39 Link road from Murran lo Sullanpora Baramulla Baramulla C&T 2024-25 15.00 15.00 11.65 - - - - - - - - 6.00 6.00 2.60 2.60 Completed 0.37 0.37 100%
Wagurah
40 Inner links at Bandipayeen Baramulla Baramulla C&T 2024-25 35.00 35.00 26.14 - - - - - - - - 5.24 5.24 9.93 9.93 Completed 0.90 0.90 100%
41 Madadamization/upgradation of town Baramulla Baramulla C&T 2024-25 150.00 150.00 114.71 - - - - - - - - 9.00 9.00 55.07 46.00 Completed 3.92 3.92 100%
roads at
Barammulla
42 Madadamization/upgradation of various Baramulla Baramulla C&T 2024-25 131.16 131.16 102.77 - - - - - - - - 0.00 0.00 - - Completed 3.60 3.60 100%
Road of R&B Division Baramulla

Total 6347.24 5962.19 5346.12 1151.30 863.89 1126.66 1105.14 1248.07 1095.04 1114.37 917.20 523.14 517.53 189.90 120.65 198.32 180.77
Present status of the under going/ ongoing/ pending projects sanctioned under Pothole during last five years
S. Name of Scheme District Division Constituency Sector Year of Estimated Cost Allotted 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 Present Status (Undergoing Target Achieve Physical Remarks
No Start Cost Project/Ongoing Project/Pending BM/SD ment %age
Project) BM/SD

Original Revised Funds Expdt Funds Expdt Funds Expdt Funds Expdt Funds Expdt Funds Expdt
Released Released Released Released Released Released
1 Pattan Baba Reshi Sahib Road Baramulla Baramulla Pothole 2021-22 60.00 45.45 45.45 10.50 0.00 45.45 44.64 - - - - - - - - Completed 1.70 1.70 100%
2 Baramulla Khadinyar Zehanpora Road Baramulla Baramulla Pothole 2021-22 60.00 0.00 0.00 9.00 0.00 0.00 0.00 - - - - - - - - Completed Shifted to NABARD

3 Baramulla Janbazpor Binner Rioad Baramulla Baramulla Pothole 2021-22 30.00 22.73 22.73 4.50 0.00 22.73 6.83 - - - - - - - - Completed 0.85 0.25 100%
4 Baramulla Hajibal Road Baramulla Baramulla Pothole 2021-22 50.00 38.37 16.39 7.50 0.00 16.39 1.31 - - - - - - - - Completed 1.50 0.05 100%
5 Puthkhah Wagoora Kanantra Dandmoh Baramulla Baramulla Pothole 2021-22 60.00 46.07 46.07 9.00 0.00 46.07 45.76 - - - - - - - - Completed 1.82 2.00 100%
Road
6 Hanjiwera Trikoulbal Mundiyar Road Baramulla Baramulla Pothole 2021-22 30.00 23.03 23.03 4.50 0.00 23.03 21.61 - - - - - - - - Completed 0.80 0.80 100%
7 Ushkura Fatehpora Dardpora Road Baramulla Baramulla Pothole 2021-22 20.00 15.35 15.35 3.00 0.00 15.35 13.30 - - - - - - - - Completed 0.65 0.84 100%
8 Faqirbagh Shumlaran Dardpora Road Baramulla Baramulla Pothole 2021-22 20.00 15.25 15.25 3.00 0.00 15.25 15.04 - - - - - - - - Completed 0.65 0.65 100%
9 Wagoora Kriri Road Baramulla Baramulla Pothole 2021-22 20.00 15.35 15.35 3.00 0.00 15.35 15.24 - - - - - - - - Completed 0.60 0.64 100%
10 Wagoora Shrenz Kohlina Road Baramulla Baramulla Pothole 2021-22 25.00 19.18 19.18 3.75 0.00 19.18 19.18 - - - - - - - - Completed 0.75 0.80 100%
11 Wagoora Shirpora Sultanpora Road Baramulla Baramulla Pothole 2021-22 20.00 15.77 0.00 3.00 0.00 0.00 0.00 - - - - - - - - Completed Shifted to NABARD
12 Uptown roads at Baramulla Baramulla Baramulla Pothole 2021-22 0.00 20.00 18.04 0.00 0.00 18.04 15.78 - - - - - - - - Completed 0.90 0.90 100%
13 Pattan Inner Links Baramulla Baramulla Pothole 2021-22 0.00 30.00 27.16 0.00 0.00 27.16 24.61 - - - - - - - - Completed 1.12 1.40 100%
1 Gohan Link Road with Inner Links & Baramulla Baramulla Pothole 2022-23 30.00 30.00 23.54 - - - - 23.54 18.42 - - - - - - Completed 0.73 0.73 100%
Patchar inner links
2 Muqam Junction to Kohlina Road Baramulla Baramulla Pothole 2022-23 50.00 50.00 37.10 - - - - 37.10 33.37 - - - - - - Completed 1.28 1.28 100%
3 Bandipayeen Inner Links Baramulla Baramulla Pothole 2022-23 22.00 22.00 17.41 - - - - 17.41 0.00 - - - - - - 0.55 -
4 Inner Links at Chenbal and Baliharan Baramulla Baramulla Pothole 2022-23 20.00 20.00 14.94 - - - - 14.94 14.90 - - - - - - Completed 0.52 0.52 100%
Road
5 Shumlaran Darasgah Link Baramulla Baramulla Pothole 2022-23 11.50 11.50 10.82 - - - - 10.82 10.81 - - - - - - Completed 0.27 0.27 100%
6 Kalantra Dandmoh Satiseran Road Baramulla Baramulla Pothole 2022-23 65.00 65.00 48.48 - - - - 48.48 41.49 - - - - - - Completed 1.43 1.43 100%
7 Chandoosa Inner Links Baramulla Baramulla Pothole 2022-23 41.00 41.00 31.78 - - - - 31.78 18.04 - - - - - - Completed 1.02 1.02 100%
8 Kreeri Kariwa Road Baramulla Baramulla Pothole 2022-23 25.00 25.00 18.59 - - - - 18.59 15.44 - - - - - - Completed 0.66 0.66 100%
9 Gousia Colony Hudpora via Takiya Baramulla Baramulla Pothole 2022-23 28.50 28.50 21.90 - - - - 21.90 21.64 - - - - - - Completed 0.69 0.69 100%
10 Takiya Tapper Inner Links Baramulla Baramulla Pothole 2022-23 45.00 45.00 33.34 - - - - 33.34 30.63 - - - - - - Completed 1.24 1.24 100%
11 Khaitangan Frestdub Road Baramulla Baramulla Pothole 2022-23 7.50 7.50 7.11 - - - - 7.11 6.84 - - - - - - Completed 0.19 0.19 100%
12 Takiya Tapper to Puchnag Baramulla Baramulla Pothole 2022-23 21.00 21.00 15.65 - - - - 15.65 15.64 - - - - - - Completed 0.57 0.57 100%
13 Hudpora to Frestdub Dar Mohalla Baramulla Baramulla Pothole 2022-23 23.00 23.00 17.69 - - - - 17.69 17.39 - - - - - - Completed 0.50 0.50 100%
14 Kreeri to Thindum Road Km 1-3 Baramulla Baramulla Pothole 2022-23 30.00 30.00 22.43 - - - - 22.43 16.86 - - - - - - Completed 0.72 0.72 100%
including Parray Pora to Suchipora
Road and Kreeri to Suryapora
15 Hudpora Veernar Road Baramulla Baramulla Pothole 2022-23 15.80 15.80 14.84 - - - - 14.84 14.80 - - - - - - Completed 0.37 0.37 100%
16 TCP to Pakipora via Palpora and Nihala Baramulla Baramulla Pothole 2022-23 17.50 17.50 12.99 - - - - 12.99 7.33 - - - - - - Completed 0.42 0.42 100%

17 Dardpora to Khaitangan via Baramulla Baramulla Pothole 2022-23 67.00 67.00 51.02 - - - - 51.02 48.54 - - - - - - Completed 1.65 1.65 100%
Ramzanpora
18 Shirpora Rangwar Sultanpora Road Baramulla Baramulla Pothole 2022-23 30.00 30.00 22.38 - - - - 22.38 20.46 - - - - - - Completed 0.76 0.76 100%
19 Johama Inner Links Baramulla Baramulla Pothole 2022-23 38.00 38.00 28.93 - - - - 28.93 27.31 - - - - - - Completed 0.93 0.93 100%
20 Chanderseer Khaipora Road Baramulla Baramulla Pothole 2022-23 30.00 30.00 22.41 - - - - 22.41 22.35 - - - - - - Completed 0.94 0.94 100%
21 Fresthar Inner Links with Main Road Baramulla Baramulla Pothole 2022-23 38.00 38.00 30.30 - - - - 30.30 30.09 - - - - - - Completed 0.95 0.95 100%
22 Vizer watergam and Saloosa vizer (inner Baramulla Baramulla Pothole 2022-23 40.00 40.00 29.89 - - - - 29.89 16.38 - - - - - - Completed 0.96 0.50 100%
links)
23 Fatehpora Inner Links Baramulla Baramulla Pothole 2022-23 45.00 45.00 35.05 - - - - 35.05 19.45 - - - - - - Completed 1.13 0.50 100%
24 Chachi Mohalla Katinwali Baramulla Baramulla Pothole 2022-23 9.20 9.20 9.02 - - - - 9.02 8.91 - - - - - - Completed 0.24 0.24 100%
1 Restoration of Tapper Kreeri Watergam Baramulla Baramulla Pothole 2024-25 54.00 43.43 43.43 - - - - - - 43.43 28.23 5.68 5.68 - - Completed 1.64 1.64 100%
road ( Km 04- 09) including kreeri sumo
stand
2 Saloosa vizer road Baramulla Baramulla Pothole 2024-25 13.50 10.95 10.95 - - - - - - 10.95 7.12 3.83 3.83 - - Completed 0.40 0.40 100%
3 Fakirbagh Sultanpora Shrunz (km 06 Baramulla Baramulla Pothole 2024-25 9.00 9.00 8.72 - - - - - - 8.20 3.25 2.87 2.87 - - Completed 0.23 0.23 100%
and 07)
4 Restoration of Shrakwara Najibhat & Baramulla Baramulla Pothole 2024-25 19.50 19.50 18.51 - - - - - - 18.50 12.67 1.23 1.23 - - Completed 0.50 0.50 100%
Shrakwara Mirangund Road
5 Restoration of Putkha Muqam inner Baramulla Baramulla Pothole 2024-25 9.00 9.00 8.73 - - - - - - 8.71 8.71 - - - - Completed 0.23 0.23 100%
links
6 Astanpora Ziyarat Sharief fatehgrah Baramulla Baramulla Pothole 2024-25 9.00 9.00 - - - - - - 0.00 0.00 - - - - Poor
0.21response (8thn call)
7 Faqirbagh to Sultanpora to Dudbugh Baramulla Baramulla Pothole 2024-25 18.00 17.56 17.56 - - - - - - 14.33 14.33 - - - - Completed 0.53 0.53 100%
(Faqirbagh Kandi Sultanpora Road)
8 Kachwa Jathar Road (Chandoosa to Baramulla Baramulla Pothole 2024-25 18.00 16.73 16.73 - - - - - - 16.73 12.54 1.85 1.85 - - Completed 0.56 0.56 100%
Kutchwa (Baramulla Babareshi Road RD
Km 15-18))
9 Old Town Baramulla with allied Internal Baramulla Baramulla Pothole 2024-25 22.00 20.46 20.46 - - - - - - 20.39 15.37 2.21 2.21 - - Completed 0.62 0.62 100%
Road (Kakar Hamam to Eidgah via
Mohalla Mir Sahib, Inner links at
Benglow Bagh, Gurduwara Chatti
Patchai to Fakirwani including Suhail
colony)
10 Chandsuma Kralhar inner links Baramulla Baramulla Pothole 2024-25 18.00 17.52 17.52 - - - - - - 15.06 11.39 1.62 1.62 - - Completed 0.45 0.45 100%
11 Internal Road Chinned Khushalpora Baramulla Baramulla Pothole 2024-25 18.00 17.54 17.54 - - - - - - 16.69 11.40 1.06 1.06 - - Completed 0.44 0.44 100%
12 Kanispora Singhpora Road (Pathla Baramulla Baramulla Pothole 2024-25 18.00 17.54 17.54 - - - - - - 14.71 11.03 1.62 1.62 - - Completed 0.64 0.64 100%
Road)
13 Khanpora Internal Road Baramulla Baramulla Pothole 2024-25 36.00 36.00 34.01 - - - - - - 32.76 24.57 3.60 3.60 - - Completed 1.83 1.83 100%
S. Name of Scheme District Division Constituency Sector Year of Estimated Cost Allotted 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 Present Status (Undergoing Target Achieve Physical Remarks
No Start Cost Project/Ongoing Project/Pending BM/SD ment %age
Project) BM/SD

14 Old Hospital Internal, Biatul Muqaram Baramulla Baramulla Pothole 2024-25 13.50 13.50 13.09 - - - - - - 13.09 8.78 1.89 1.89 - - Completed 0.58 0.58 100%
Fishmarket, Jadeed Road, Auqaf Road,
Parkings of Tashkan Chowk & Auqaf
Market (Fish market bridge to vegetable
market crossing)
15 Azadgunj Bridge to Old Town, Azadgunj Baramulla Baramulla Pothole 2024-25 9.00 9.00 8.63 - - - - - - 8.62 6.03 2.58 2.58 - - Completed 0.23 0.23 100%
Chowk & Bus Stand (Azad Gunj to
cement bridge via JK bank back side)

16 Sangri Colony Internal Road (Sangri Baramulla Baramulla Pothole 2024-25 40.00 38.01 38.01 - - - - - - 36.14 24.70 5.04 5.04 - - Completed 1.58 1.58 100%
Colony inner links including masjid
usman to house of Nazir ahmad
including masjid madina to culvert)
17 Parray Mohalla Sangri Link Baramulla Baramulla Pothole 2024-25 13.50 13.18 13.18 - - - - - - 10.55 8.59 1.96 1.96 - - Completed 0.60 0.60 100%
18 Gutiyar Kanthbagh Internal Baramulla Baramulla Pothole 2024-25 18.00 18.00 17.37 - - - - - - 14.10 11.72 0.93 0.93 - - Completed 0.45 0.45 100%
19 Fatehgrah Budmulla Internal Baramulla Baramulla Pothole 2024-25 18.00 16.96 16.96 - - - - - - 16.95 12.71 1.87 1.87 - - Completed 0.59 0.59 100%
20 Degree College upto Uplina upto Baramulla Baramulla Pothole 2024-25 18.00 17.60 17.60 - - - - - - 12.99 11.44 1.55 1.55 - - Completed 0.42 0.42 100%
Katinwali Roads (Fatepora Uplina Road)

21 Kanlibagh Sangri Colony upto Bowli Baramulla Baramulla Pothole 2024-25 18.00 17.55 17.55 - - - - - - 14.18 13.16 1.01 1.01 - - Completed 0.62 0.62 100%
22 N. H. Way to Gantamulla Bala (Gujjar Baramulla Baramulla Pothole 2024-25 22.50 22.50 - - - - - - 0.00 0.00 - - - - 0.60 Poor response (8thn call)
Pati)
23 Malpora Audoora Road Baramulla Baramulla Pothole 2024-25 22.00 20.73 20.73 - - - - - - 20.72 15.54 2.28 2.28 - - Completed 0.56 0.56 100%
24 Janbazpora Binner Internal upto Baramulla Baramulla Pothole 2024-25 19.50 19.25 18.58 - - - - - - 18.57 12.51 2.66 2.66 - - Completed 0.57 0.57 100%
Venkura (Binner internal links)
25 Balance Portion of Hiltop Colony Baramulla Baramulla Pothole 2024-25 18.00 17.59 17.59 - - - - - - 13.66 11.44 1.22 1.22 - - Completed 0.47 0.47 100%
Baramulla connecting NH-701A
26 Various links at Thindim Kreeri Baramulla Baramulla Pothole 2024-25 13.50 10.95 10.95 - - - - - - 10.95 10.94 - - - - Completed 0.40 0.40 100%
27 Pethgam Wagoora including Wagoora Baramulla Baramulla Pothole 2024-25 20.00 20.00 20.00 - - - - - - 0.00 0.00 - - - - 0.53 Allotted - Locals demanding full macadamization under C&T
Takiya Wagoora Road
28 Khanpora Cement Bridge to Azadgunj Baramulla Baramulla Pothole 2024-25 20.00 20.00 18.47 - - - - - - 18.47 13.00 2.10 2.10 - - Completed 0.90 0.90 100%

29 Bunglowbagh to Khowja Sahib via Mir Baramulla Baramulla Pothole 2024-25 12.00 12.00 12.00 - - - - - - 12.00 7.79 1.71 1.71 - - Completed 0.55 0.55 100%
Sahib
30 Sherwani Colony to Fresthar Baramulla Baramulla Pothole 2024-25 15.00 15.00 15.00 - - - - - - 16.00 0.00 5.76 5.76 - - Completed 0.38 0.38 100%
31 Grid Station Delina via Chinned via Baramulla Baramulla Pothole 2024-25 10.00 10.00 10.00 - - - - - - 0.00 0.00 - - - - 0.25 Allotted - Not Takn up - Road Damaged by JJM
Arfeen School of Excllence
32 Putkah Chowk near Sara complex Baramulla Baramulla Pothole 2024-25 13.50 13.50 10.65 - - - - - - 10.65 9.74 - - - - Completed 0.34 0.34 100%
opposite Saw mil
33 Repairs/ restoration of Railway Baramulla Baramulla Pothole 2024-25 17.76 17.76 17.72 - - - - - - 17.72 14.27 - - - - Completed 0.86 0.86 100%
Approach Road Baramullla
1758.76 1643.88 1387.39 60.75 0.00 264.00 223.30 577.61 477.09 485.82 352.97 58.13 58.13 0.00 0.00
manding full macadamization under C&T