Steel Deck
Steel Deck
75mm x 75mm x 6
mm thick x 6.0m
i4 Steel Chequered Plate ASTM A36 BAR
ABS GRADE
wt= 140.03 kgs ( 140.03 kgs (308.71
ii
8 " x 8" x 8mm lbs)
Angle Bar
H-Beam Post As per
529 Contractors
B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1
Plan
See Stair Detail
LANDING
75mm x 75mm x 6
mm thick x 6.0m
Angle Bar
TRUSS 2
TRUSS 2
B-1
B-1
TRUSS 2
TRUSS 2
TRUSS 2
B-1
TRUSS 2
529
DN
UP
i i
B-1
B-1
B-1
B-1
ii ii iii ii ii iii
75mm x 75mm x 6
mm thick x 6.0m
Angle Bar
100mm x 50mm x
B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1
100mm x 50mm x
1.5mm thick x 75mm x 75mm x 6 iii 6"x6"x 8.0mm iii 150mm x 50mm x 1.2mm
20
45 45 45 45 45 45 45 45 45 45 45
499
TRUSS 2 DETAILS
SCALE: 1:40m
@ 40cm O.C and as per the width of the 6mm (41") THICK X 4' X 8' Hot 150mm x 50mm x 1.2mm Thick x
4mm thick wall cladding
(mini rib type) w/ 0.5mm thick x 52mm x 32mm wall cladding Rolled Steel Chequered Plate 6.0m B.I. (Black Iron) Tubular with
(2" x 2") metal studs framing sp. @ 40cm O.C ASTM A36 BAR ABS GRADE 5cm THK. as Base Plate
and as per the width of the wall cladding 369 wt= 140.03 kgs ( 140.03 kgs 2 - 100mm x 50mm x 1.5 mm
Base of Truss Fully (308.71 lbs) 3 thick x 6.0m C-PURLINS sp.
150mm x 50mm x 1.2mm Thick x 6.0m B.I. (Black welded on the surface
Iron) Tubular with 6cm THK. Base Plate 150mm x 50mm x 1.2mm 100mm x 50mm x 1.5mm equally as shown
650
30
598
100mm x 50mm x
1.5mm thick x 6.0m B.I.
SEE TRUSS 2 DETAILS 1
3000 PSI R.C. Beam w/ 2"Ø x 8" (L) x 1" (C) with 2"
Fully welded on
4-16mm Ø Hor. Bar Sp. as Thread length L-Type Anchor
exposed 12 mm Ø Vert. 8 " x 8" x 8mm H-Beam Post
shon and 10mm Ø Stirrup Bolt (with nut and washer)
Dowel (Extended thru roof truss )
sp. @ 5-10cm, 5-20cm Rest 30
300 300 @ 30cm O.C. Dowel bar Fully Welded on the
1 75mm x 75mm x 6mm thick
2"Ø x 8" (L) x 1" (C) with 2" SEE COLUMN DETAILS 3
Thread length L-Type Anchor angle Bar located as shown
Bolt (with nut and washer) 2
10mm Ø Dowel Bar sp. @ 30cm
3000 PSI R.C. Beam w/ 4-16mm 20 O.C.
Ø Hor. Bar Sp. as shon and EL. 39.45M 1
10mm Ø Stirrup sp. @ 5-10cm, 50 WEST MAIN CANAL
REV APPROVED
DATE NATURE OF REVISION BY: CHECKED RECOM.
5-20cm Rest @ 30cm O.C. 30
SECTION ii-ii NO. NIA
SCALE: 1:100m
REPUBLIC OF THE PHILIPPINES
SEE TRUSS DETAIL 305
155
2" Ø G.I. PIPE
175
NATIONAL IRRIGATION ADMINISTRATION
REGION-09 REGIONAL CENTER, BALINTAWAK, PAGADIAN
CITY
133
PROVINCE OF ZAMBOANGA DEL SUR
EL. 36.40M
SALUG RIVER IRRIGATION SYSTEM
50
25cm x 20cm x 6mm thck
MAHAYAG, ZAMBOANGA DEL SUR
4-12mm Ø Vert. bar
base plate (Embedded in
(Dowel for base plate
connection) sp. as shown
concrete fully welded in 25
the corbel rebar as
94 100
MAHAYAG DAM (OGEE)
shown)
40 327
DRAFTING DESIGN
4-12mm Ø Hor. bar sp.
as shown
2-16mm Ø Bar bend as CADD: MARKGYVER ANGELO S. SERGAS DESIGNED: REY M. PINATACAN
shown 619 EL. 33.13M FLOW
3-10mm Ø Bar sp equally
as shown
REVIEWED: ERIC JOHN S. MORALES REVIEWED:
RECOMMENDING APPROVAL:
20 25 292
APPROVED:
SECTION i4-i4