The document outlines the proposed industrial building plan for M/S Indo Cool Composites Pvt Ltd, located in the SIPCOT Industrial Complex, Mukundarayapuram Village, Vellore District. It includes details on various structures such as a shredding shed, cold storage, and multiple machinery installations, along with drainage and landscaping features. The plan also specifies equipment like vacuum pumps and grinding machines essential for the operations of the facility.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views1 page

Unit 2-1

The document outlines the proposed industrial building plan for M/S Indo Cool Composites Pvt Ltd, located in the SIPCOT Industrial Complex, Mukundarayapuram Village, Vellore District. It includes details on various structures such as a shredding shed, cold storage, and multiple machinery installations, along with drainage and landscaping features. The plan also specifies equipment like vacuum pumps and grinding machines essential for the operations of the facility.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SHEET - 5 OF 5 PLAN SHOWING THE PROPOSED

INDUSTRIAL BUILDING FOR


131.82 M/S INDO COOL COMPOSITES PVT LTD
OPEN DRAIN TRENCH AT Survey NO : 88/1, 89/1, 89/2, 89/3 , 89/4,
Pump

99/1, 99/2, 99/4,


5
Vaccum

. 7 C PLOT NO : M5 & S - 62 AND S -71,


23 SIPCOT INDUSTRIAL COMPLEX,

15.77
MUKUNDARAYAPURAM VILLAGE
WELL
LANDSCAPE
D RANIPET,PHASE III, WALAJAPET TALUK,
W W

L
VELLORE DISTRICT.
W 43 10.1 33 9.1 5.9 8.99
S

A
7

N
. 0 C COLOUR CODE
26

PROPOSED
SHREDDING
SHED
A
G

12.1

12.1

12.1
PROPOSED MOULD STORAGE - PROPOSED PLUG MAKING- PROPOSAL

C
43.0X12.1 M 33X12.1 M
B B BOUNDARY

PROPOSED COLD STORAGE


D ROAD
F

8.05
5 R O A D
R O A D
.84 A

DRILLING MACHINE

17.ISO TANK
21.ISO TANK
25

20
PROPOSED 11.4 5 LANDSCAPE
S
STP Proposed E
4

10
Gelcoat
VACCUM PUMP 1HP-6NOS
storage Pump

S12
Vaccum

SEPTIC
TANK
.37

10 8

34.64
R O A D
1.32

LAWN
16

EXISTING
8 33.42
EOT 14

116.41
STP
VACCUM PUMP 1HP-5NOS

3 Pump
Vaccum

DRILLING MACHINE

AIR COMPRESSOR
22.WATER PUMP
5

R O A D
VACCUM PUMP 1HP-4NOS

Pump
Vaccum
S SHUTTER DOOR
18.91

F
BORE WELL PUMP

11.FAN

AG5 GRINDING MACHINE


OHT
S

15.MAT CUTTING MACHINE


11.FAN

S D S

AG5 GRINDING MACHINE


DRILLING MACHINE

S 10.51

AG4 GRINDING MACHINE


CATALYST
STORAGE
4.5

S
SHED

SHUTTER DOOR
S SHUTTER DOOR
3 C D G
3 B B
DRILLING MACHINE

G S

AG5 GRINDING MACHINE


VACCUM PUMP 1HP-4NOS
SCRAB GRINDING MACHINE
VACCUM PUMP 1HP-4NOS
15

TOILET
GENTS
Pump
Vaccum Pump
Vaccum

TOILET
GENTS
D

8.53
2 DRILLING MACHINE

G
Pump
Vaccum

14
16.FAN
VACCUM PUMP 1HP-4NOS
VACCUM PUMP 1HP-4NOS
8
G G
Pump
Vaccum

C AIR COMPRESSOR
F
Pump
Vaccum Pump

4.85
Vaccum

AG5 GRINDING MACHINE


D
GROOVING

HEATER

G S
16.FAN 11.FAN DRILLING MACHINE SCRAB GRINDING MACHINE
MACHINE

LANDSCAPE
5 F

AG4 GRINDING MACHINE

AG4 GRINDING MACHINE


11.FAN

EXISTING PUMP ROOM


G S S SHUTTER DOOR D
& UG SUMP
FIRE SUMP
S SHUTTER DOOR

G 6 RAINWATER
HARVESTING S
TRENCH
19.FIRE HYDRANT SYSTEM
S 16.FAN
C CD DUST COLLECTION SYSTEM C

AG5 GRINDING MACHINE


16.FAN SHUTTER DOOR
GRINDING

C S FIRE ESCAPE
G
BENCH

18.91
G D
SHUTTER DOOR
STAIRCASE

AG4 GRINDING MACHINE


DUST COLLECTION SYSTEM

B
DRILLING MACHINE

UP

4.02
PROPOSED D D GRINDING MACHINE
D

R O A D
DRILLING MACHINE
PROPOSED BUILDING - B
AG4 -10NOS
C D
12.AC

VACUM PUMP VACUM PUMP 16.FAN


5 A D G DUST COLLECTION SYSTEM

SCRAB GRINDING MACHINE B S


12.AC

PROPOSED F
Pump Pump
Vaccum Vaccum

173.05
F GRINDING MACHINE
F PROPOSED C D
18.AC

12.AC

CUTTING 11.FAN

SCRAB GRINDING MACHINE B


DRILLING MACHINE
DRILLING MACHINE

OFFICE

AG5-5NOS DUST COLLECTION SYSTEM

113.86
VACUM PUMP
VACUM PUMP

CUTTING SHED-1
18.AC

24.17

SHED-2 5
R O A D

Pump Pump
Vaccum Vaccum

SCRAB GRINDING MACHINE B D S

AG5 GRINDING MACHINE


OFFICE

DUST COLLECTION SYSTEM


18.AC
16.4

RAINWATER
10
VACCUM PUMP 1HP-5NOS

S S 16.FAN
GD E
DRILLING MACHINE

DRILLING MACHINE

12.AC

HARVESTING
D

AG5 GRINDING MACHINE


18.AC

Pump
Vaccum

DUST COLLECTION SYSTEM


TRENCH VACUM PUMP VACUM PUMP

DRILLING MACHINE
152

SCRAB GRINDING MACHINE B A 11 F


BUFFING MACHINE

Pump Pump
Vaccum Vaccum
R O A D

12.AC

11.FAN

AG4 GRINDING MACHINE


D

AG4 GRINDING MACHINE


18.AC

PROPOSED D S VACCUM PUMP 1HP-5NOS

AG5 GRINDING MACHINE


S DUST COLLECTION SYSTEM
DRILLING MACHINE
Exit

EXISTING BUILDING - A Pump


Vaccum

4.85
G D
VACUM PUMP
VACUM PUMP

18.91
DUST COLLECTION SYSTEM
Pump Pump

S
Vaccum Vaccum
AF7

AG4 GRINDING MACHINE


16.FAN
D
GC C

R O A D
A
DUST COLLECTION SYSTEM
14.00

S
BUFFING MACHINE

AG4 GRINDING MACHINE


AG5 GRINDING MACHINE

AG5 GRINDING MACHINE


SHUTTER DOOR

S S SHUTTER DOOR
VACCUM PUMP 1HP-4NOS
VACCUM PUMP 1HP-5NOS
BUFFING MACHINE

Pump

S S
PUF panel for tank Vaccum

VACUM PUMP Pump


Vaccum

SHUTTER DOOR

C SHUTTER DOOR
2m work (Resin & pigment mixing area) & safe area for resin filling in IBC

VACUM PUMP
Pump
Vaccum
Tank 1
196.38

24 Ton Resin storage Tank Pump


Vaccum
forklift movement
3m gangway for

AF7

VACCUM PUMP 1HP-5NOS

D G GC D
Tank 2

VACUM PUMP

AG4 GRINDING MACHINE


24 Ton Resin storage Tank
Pump

DRILLING MACHINE
Vaccum

A
AHU for cold storage

VACUM PUMP Pump


DUST COLLECTION SYSTEM
16.FAN
Vaccum
AF7
2700m*1500m*4m
Tank 3

Pump

AG4 GRINDING MACHINE


Vaccum

24 Ton Resin storage Tank

A
11.FAN

G
Rack
PUMP

D
Suction Inlet based on

D
the Supplier End
Vehicle

16.FAN
Entry

Supplier truck parking area for unloading of material

5 DRILLING MACHINE DUST COLLECTION SYSTEM


SPECIFICATION
F GC
VACUM PUMP

4.85
VACUM PUMP

11.FAN
BUFFING MACHINE

Pump
Vaccum

FOUNDATION : OPEN FOOTING


BUFFING MACHINE

Pump
Vaccum

D G C S
SOLID BLOCK WORK : IN CM 1:5
GENERAL TOILET

SCRAB GRINDING MACHINE


R O A D

GENERAL TOILET

DRILLING MACHINE

11.FAN F PLASTERING : C.M 1:4 FOR ALL WALLS


17.75

VACUM PUMP

JOINERIES : STEEL WINDOWS & M.S ROLLING SHUTTER


16.35

Pump

D
Vaccum
AF7
DRILLING MACHINE

DRILLING MACHINE

G S
DRILLING MACHINE

PAINTING : 2 COATS OF EMULSION OVER PRIMER FOR


AF7

10.51 LANDSCAPE
A AG S SHUTTER DOOR
ALL WALLS 2 COATS OF ENAMEL PAINT FOR
JOINERIES

146.23
R.C.C M20 : FOR ALL COLUMNS , BEAMS,SUNSHADES

8.43
SHUTTER DOOR S S SHUTTER DOOR S SHUTTER DOOR
SUPER STRUCTURE : PRE ENGINEERED STEEL BUILDING,
ROOF GALVALUME SHEET
21.EOT CRANE

S S 16.FAN
DRILLING MACHINE

11.FAN F
PROPOSED TRUCK PARKING- 11 NOS

33.02 S 13
S
38.5
6.1

3.5
GATE

16

2.5 6.52 14 8 4
SHUTTER DOOR S 33 SHUTTER DOOR S 5 14 5 33.02 5 3.36
DRAWING TITLE : MACHINERY LAYOUT
N
SCALE : 1:400
R O A D R O A D R O A D
22

SHEET NO : 01/04
3.24
North point direction
35 3.5 48.87 DESIGNED : TSO with respect to floor plan
EXISTING TRUCK PARKING- 10 NOS L-Y3
DRAWN : SURESH KUMAR
R6

4.44

3.5
6

LANDSCAPE
12

226
2.5

14
16

25 25
R1
R1

18 18
10

10
SECURITY
ROOM

EXISTING ADMIN EXISTING CANTEEN & CHANGE ROOM


EXISTING

40.38
CAR PARKING + 2 FLOORS G+1 :- 25 X 10 M EXISTING 45.5 - TWO WHEELER PARKING AREA - 226 NOS
3

2 10 1 3.5
18 18 3.05
D.G SET
320KVA

HT YARD
6. E SLIDING GATE SLIDING GATE 3
7

PANEL ROOM
87 VISITORS 1
3.55

ENTRY
LANDSCAPE
ENTRY
WORKERS COMPOUND WALL
WORKERS
ENTRY
184.66
EXISTING
SECURITY
CABIN
CA
NA
L

LICENSED SERVEYOR

DRAWN BY REVIEWED BY CHECKED BY OCCUPIER

You might also like