Congratulations on your purchase of our instant shelter.
This unit is a combination of
excellent manufacturing and design. It is comprised of a rigid frame and a durable cover. For
easy assembly, we have marked all the parts with codes. With proper installation, use and
maintenance, your unit will provide many years of good and suitable service.
READ ALL THE INSTRUCTIONS BEFORE ASSEMBLY!
1. The proper erection and installation of this building requires a high level of care and safety.
We recommend the safety regulations be complied with during the installation. It includes
but is not limited to:
- Safety hats, protective eyewear and protective clothing
- Safety harnesses for all elevated workers
- Proper ladder, cage, and safety operation
2. Site selection: Choose a solid level location for your building. Do not install the building
where the ground could not keep the building steady. Do not install the building where the
ground could not bear the weight of the building. Do not install the building in soft grass
ground or wetland. (This shelter should be installed on concrete foundation.)
3. Be cautious with the surroundings. Keep work area clean. Do not set up it near snow drifts, in
slippery places, or in wet location. The cover of the building will protect against normal
falling leaves and light debris, however, large, fast or sharp falling items etc. may cause a
puncture or tear in the cover material. So, keep the building away from such harmful things.
Be careful with power and heat sources. Don’t keep heat sources near the tarpaulin. Don’t
expose to open flame.
4. Chose a windless day to install the building. It is very difficult to attach the cover in heavy
wind.
5. All snow accumulation on the main cover should be removed as soon as possible. Otherwise,
when old snow on the roof becomes hard with new snow falling in, it will increase the
burden of the roof badly and will damage the roof.
6. Try to keep the building, especially its base, in a dry condition. This will help the building to
have a longer life than keeping it in a wet conditions.
7. The user should be responsible for the parts missing or damage occurred during the
installation.
8. Don’t make alteration of the frame. Don’t hang anything besides included parts to the frame.
Damages, consequential damages, or injuries caused by improper installation, alteration,
improper use, or damages caused by snow, wind, or any acts of nature are owing to the user.
The building is not intended for occupancy for any length of time.
ASSEMBLY PROCEDURE
1. Prepare location and place all unit boxes near location sight. Perform an inventory check
before beginning, to be certain all components are available for installtion.
2. Secure base plates flanges to base surface.
3. Assemble every group of arch.
4. Begin frame assembly with front end arch, first interior arch, purlins, etc.
5. Add to assemble other groups of arches.
6. Install main cover over frame.
7. Install end covers over end panels.
Read all the detailed instructions and notices in the following assembly instructions!
MAINTENANCE AND CARE
1. If some parts or the cover were accidently damaged during the use, contact the local supplier
for advises on the repairing method or replacements, so that to prevent from further damage
and keep the building in a good condition.
2. When replacing the parts, make certain the whole frame and the parts connected to the
replaced parts be well fixed or supported.
3. Same with when attaching the cover, choose a windless day to replace the cover. Begin with
making certain all the bolts of the frame and the tensioning equipments be well fixed. When
taking off the cover, make sure the related ropes, etc. be taken off, and the cover will not be
blocked during the way. Avoid taking off the cover with heavy big power equipments.
4. For the building with mechanical door. Keep the door closed if it is not used for long time.
This helps the mechanical door to have a longer life.
5. To enlongate the life of the cover, put small duct tape or foam rubber (provide it by yourself)
on the frame that comes to in contact with cover. The tape and foam rubber acts as a cushion
to avoid rubbing damage to the cover over years.
6. Periodically(once in half a year or more often), the building should be completely inspected
and maintained internally and externally to make certain the building remains properly
installed and secured. Including: check all bolts and hardware connectors to be certain they
are in place and tightened, the base plates are still fixed firmly, check and adjust the ropes if
in need, clean the cover with suitable washing. Allowing dirt and debris to sit on cover over
an extended time will damage cover irreparably.
Thanks again for choosing this quality product. The following is the detailed assembly
instructions for you starting the assembly.
Part List of G S4070
Part Code Description Quantity
1 Top roof tube 6
1A Top roof tube in the front and back panel 2
2 Roof curving tube 12
2A Roof curving tube in the front panel 2
2B Roof curving tube in the back panel 2
3 Roof curving tube at shoulder height 12
3A Roof curving tube at shoulder height in the front panel 2
3B Roof curving tube at shoulder height in the back panel 2
4 Sidewall tube 12
4A Sidewall tube in the front panel 2
4B Sidewall tube in the back panel 2
5 Roof purlin and horizontal tube 77
6L Base flange in corner 2
6R Base flange in corner 2
7 Base flange for standing legs in the front and back panel 7
8 Base flange for sidewall 8
8A Base flange for wind brace support 4
9 Lower standing legs in back panel 2
10 Upper standing legs in back panel 2
11 Lower standing legs in the middle of back panel 1
12 Upper standing legs in the middle of back panel 1
13 Middle rail of back panel 6
13A Upper side rail of back panel 2
13B Lower side rail of back panel 4
14 Upper door track 2
14A Upper standing leg in front panel 2
15 Lower door track 1
15A Lower standing leg in front panel 1
15B Lower door track to connect the winch rail 1
15C Lower standing leg in front panel to connect the winch rail 1
16 Upper rail of front panel(beside the door) 2
16B Middle and lower rail of front panel(beside the door) 4
16C Middle rail of front panel 2
16D Bottom rail for winch of mechanical door(beside the door) 1
16E Lower rail of front panel 2
17 Wind Brace Support 4
17A Tube clip for wind brace support 4
18 Cover tensioning tube of front cover 4
19 Cover tensioning tube of back cover 4
20 Cover Tensioning tube for roof cover 2sets
22 Door dropping tube 6
22A Door dropping tube(swaged) 6
23 Door dropping tube at the bottom 1
23A Door dropping tube at the bottom(swaged) 1
25 F oundation Bolts/ E xpansion Bolts 80
28 Hexagonal bolt M10x85 50
28A Carriage bolt M10x85 90
29 Hexagonal bolt M10x75 290
30 Hexagonal Bolt M10x30 40
31 Bolt M10x15 for tie down ratchet 32
32 Tie down ratchet 16
32A Band for tie down ratchet 16
34 Roof cover 1
35 Top cover above the door 1
36 Side cover beside the door 2
37 Door cover 1
38 Back cover 1
Rope for fastening the roof cover, the door cover and the
39 360m
front&back cover
40 Plastic cap for tensioning tube 20
41 Components for mechanical door 1set
42 Turnbuckle and steel wire 28
43 Door beam 1set
43A Vertical support tube for door beam 1
E
temporarily.
The shelter should be installed on
CONCRETE GROUND.
Installation for BASE PLATES
As Figure 3 shows, Note that Base flanges in corner(Part# 6R&6L)and Sidewall Base Plates(Part# 8&8A)and Base Plates for Front &Rear Standing
Legs(Part# 7)are different .Sidewall Base Plates are used only along each side of assembly. Standing Leg Base Plates are position along the Front
and Rear Arches to secure vertical beams in each.
8/8A 8/8A 8/8A 8/8A
25 25
Each side base flange is equipped with four Foundation Bolts. Each side base flange is equipped with four Foundation Bolts.
6L 6R 6L 6R
25 25
Each Corner base flange is equipped with four Foundation Bolts. Each Corner base flange is equipped with four Foundation Bolts.
7 7 7 7
25 25
Each base flange for end panel is equipped with two Foundation Bolts. Each base flange for end panel is equipped with two Foundation Bolts.
Figure 3 Installation for FOUNDATION BOLTS Figure 3 Installation for FOUNDATION BOLTS
INSTALLATION FOUNDATION BOLTS INSTALLATION EXPANSION BOLTS
1.Insert Foundation Bolts(Part#25)into bolt holes on each 1.Put all base plates at their respective position measured just
base plate,put all base plates at their respective position.Leave now on concrete foundation.
the space for concrete pouring. 2.Locate the holes' positions on concrete foundation by paint
2.Pour concrete. or steel nail punch.
3.Clear up the residual on screw of Foundation Bolts, keep it 3.Punch holes on concrete foundation for Expansion Bolts by
clean. power tool.
4.Wait for the concrete's solidification. 4.Insert Expansion Bolts into the punched holes.
5.Bolt the nuts of Foundation Bolts tightly.Now base flanges 5.Place base flanges.
are fixed firmly. 6.Bolt the nuts of Expansion Bolts tightly.Now base flanges
are fixed firmly.
E