Louver Calculation

Uploaded by

lee kin tat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views2 pages

Louver Calculation

Uploaded by

lee kin tat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

1.

Louver Calculation
NV5 : Existing system : Louver : 3000x2400 for 20400 L/s
New system : SEF 1-J-C-1 : 12450L/s
SEF G-W-A-2 : 8800L/s
Total : 21250L/s (104% of existing)

2. New chilled and heating water calculation, including impact to existing pipeline
NV5 : Chilled water : (no included kitchen equipment as no information)
Left side AHU RM-04:
Existing : 250mm pipe, 95.8 L/s 123
Additional cooling load : PA : 8191L/s(air), 506.2kw, 20.09 L/s(water)
FCU(Hot Pot) : 1.85 L/s (water)
Total additional water flow : 20.09+1.85 = 21.94L/s
Total water flow : 95.8 + 21.94 = 117.74 L/s < 123L/s (250mm pipe)
Right sit AHU RM-06:
Existing : 125mm pipe, 19L/s 25
Additional cooling load : PA : 1965L/s(air), 121.44kw, 4.82 L/s(water)
Total additional water flow : 4.82L/s
Total water flow : 19+4.82 = 23.82 L/s < 25L/s (125mm pipe)
Heating water :
Left side AHU RM-04:
Existing : 150mm pipe, 17.3 L/s
Additional heating load : PA : 140.91KW , 4.21L/s
Total additional water flow : 4.21 L/s
Total water flow :17.3+ 4.21 = 21.51 L/s < 40.5L/s (150mm pipe)
Right sit AHU RM-06:
Existing : 100mm pipe, 12.23 L/s
Additional cooling load : PA : 33.81KW, 1.01L/s
Total additional water flow : 1.01L/s
Total water flow : 12.23+1.01 = 13.24 L/s < 13.9L/s (100mm pipe)

3. CDP drain pipe check for new PAUs

NV5 : Left side AHU RM-04: Connect to 150mm CDP serving 3nos. of AHU and 1 additional PAU

total : 1130 kw (321 ton)

Right sit AHU RM-06: Connect to 80mm CDP serving 2nos. of AHU and 1 additional PAU

total : 500.22 kw (143 ton)


4. Accessibility study:

NV5: VAV boxes will be in BOH areas wherever possible and we propose preliminary locations for
the coordination based on the current information.

5.Smoking room calculations:

NV5: See Attachment (Smoking Lounges Calculations.pdf)

6. Smoke Control calculation

NV5: See Attachment (Smoke Exhaust Calcs.pdf and Using base-built calculation data to assumed
door size)

7. Kitchen and dining pressure cascade calculation

NV5: Kitchen will keep 90% supply of exhaust air

Hot pot dining : keep 0.1m/s air velocity from Gaming area to dining area opening (no wall)

Total 2500L/s exhaust and 480 L/s PA to FCU

Velocity : total flow / opening area : (2.5-0.48)/(5*4) = 0.101m/s

8. Private salon odor control proposal

NV5: As no addition exhaust for those area, recommended to use portable smell odor removal
machine (ex: https://airpurification.com.hk/pdf/seriesRA_tc.pdf)