0% found this document useful (0 votes)
12 views2 pages

NGP-07 Bill. No.9

The document outlines the compliance details for Tender No. NGP-ELECT-TRD-2022-23-07 related to the electrification and modification of the Central Railway in the Butibori section. It includes a schedule of various tasks such as manual erection of structures, cement concrete foundations, cantilever assembly erection, load transfer, and dismantling of OHE structures, with specific dates, quantities, and weights. The overall project aims to enhance railway infrastructure by eliminating level crossings through the installation of overhead equipment.

Uploaded by

jaipramit1995
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views2 pages

NGP-07 Bill. No.9

The document outlines the compliance details for Tender No. NGP-ELECT-TRD-2022-23-07 related to the electrification and modification of the Central Railway in the Butibori section. It includes a schedule of various tasks such as manual erection of structures, cement concrete foundations, cantilever assembly erection, load transfer, and dismantling of OHE structures, with specific dates, quantities, and weights. The overall project aims to enhance railway infrastructure by eliminating level crossings through the installation of overhead equipment.

Uploaded by

jaipramit1995
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Compliance no.

09 03-09-2025
Tender No. NGP-ELECT-TRD-2022-23-07 closing date 31-05-2022 15:00
for Electrification, modification, design, supply, erection, testing & commissioning of 25 KV, AC, 50
Hz, single phase OHE in Nagpur division of Central Railway in connection with elimination of various
LC Gates by RUBs/LHSs
Butibori section
SCH. No.AII& BII-3 Description:- Manual erection of GI steel structures including TT boom.

Date of Type of
Sr.No. Location Section DPR no. Qty Weight JIPL Bill No. Remark
Erection Mast

1 793/22 Butibori 03-07-2025 2257 B-150 1 369.69 8 PB


2 799/07 Butibori 05-07-2025 2257 B-150 1 369.69 8 PB
3 805/10 Butibori 13-07-2025 2257 B-200 1 474.19 8 PB
Total 3 1.214 MT

Sch. No.AI & BI-1 Description:- Cement concrete of M-15 grade for OHE foundation & plinth in other
than hard and rocky soil

Type of Date of
Sr.No. Location Section Type of soil Volume DPR JIPL Bill No.
Foundation Casting
1 793/22 Butibori Normal Grouting 0.252 2257 03-07-2025 8
2 799/07 Butibori Normal Grouting 0.252 2257 05-07-2025 8
3 805/10 Butibori Normal Grouting 0.252 2257 13-07-2025 8
TOTAL 0.756 CUM

Sch. No.AII & BII-7 Description:- Erection of single cantilever assembly suitable for
conventional OHE
Date of
Sr.No. Location Section DPR No. Qty PB JIPL Bill No.
Erection
1 793/23 Butibori 30-06-2025 2258 1 PB 8 B-150
2 793/21 Butibori 03-07-2025 2258 1 PB 8 B-150
3 793/22 Butibori 04-07-2025 2258 1 PB 8 B-150
4 799/07 Butibori 11-07-2025 2258 2 PB 8 B-150
5 799/11 Butibori 12-07-2025 2258 1 PB 8 B-150
6 799/10 Butibori 18-07-2025 2258 2 PB 8 B-150
7 806/23 Butibori 19-07-2025 2258 2 PB 8 B-150
8 806/25 Butibori 21-07-2025 2258 2 PB 8 B-150
9 795/15 Butibori 22-07-2025 2258 2 PB 8 B-150
10 795/16 Butibori 27-07-2025 2258 2 PB 8 B-150
11 795/17 Butibori 23-07-2025 2258 2 PB 8 B-150
12 795/18 Butibori 30-07-2025 2258 2 PB 8 B-150
Total 20
Sch. No.AII & BII-13 Description:- Transfer of load from one mast to another incl old cant
dismantling
Date of
Sr.No. Location Line DPR No. Qty PB JIPL Bill No.
Erection
1 793/23 Butibori 30-06-2025 2258 1 PB 8
2 793/21 Butibori 03-07-2025 2258 1 PB 8
3 793/22 Butibori 04-07-2025 2258 1 PB 8
4 799/07 Butibori 11-07-2025 2258 2 PB 8
5 799/11 Butibori 12-07-2025 2258 1 PB 8
6 799/10 Butibori 18-07-2025 2258 2 PB 8
7 806/23 Butibori 19-07-2025 2258 2 PB 8
8 806/25 Butibori 21-07-2025 2258 2 PB 8
9 795/15 Butibori 22-07-2025 2258 2 PB 8
10 795/16 Butibori 27-07-2025 2258 2 PB 8
11 795/17 Butibori 23-07-2025 2258 2 PB 8
12 795/18 Butibori 30-07-2025 2258 2 PB 8
TOTAL 20

Sch. No.14 Description:- Dismantling of OHE structures by cutting / weldcut


Date of
Sr.No. Location Line DPR No. Qty PB JIPL Bill No.
Erection
1 793/21 Butibori 04-07-2025 2259 1 8
2 793/23 Butibori 04-07-2025 2259 1 8
3 793/22 Butibori 06-07-2025 2259 1 8
4 799/07 Butibori 15-07-2025 2259 1 8
5 799/10 Butibori 18-07-2025 2259 1 8
6 806/23 Butibori 19-07-2025 2259 1 8
7 795/15 Butibori 27-07-2025 2259 1 8
8 795/16 Butibori 27-07-2025 2259 1 8
9 795/17 Butibori 29-07-2025 2259 1 8
10 799/11 Butibori 17-07-2025 2259 1 8
11 795/18 Butibori 30-07-2025 2259 1 8
12 806/10 Butibori 31-07-2025 2259 1 8
13 806/25 Butibori 02-08-2025 2259 1 8
14 795/21 Butibori 04-08-2025 2259 1 8
Total 14

You might also like