Foundation Plan: A B C D E F
Foundation Plan: A B C D E F
CONCRETE
SLAB + FINISH W/ 10mm
Ø BAR SPACED @ 500mm
O.C B. W
A B C D E F
WF
WF
WF
WF WF
FTB
FTB
FTB
FTB
FTB
FTB
4000.0
10mm dia. HORT. BARS FOR
F1/CI F1/CI F1/CI F1/CI F1/CI F1/CI
EVERY 3 LAYERS OF CHB 10mm dia. HORT.
FTB FTB FTB FTB FTB 6" CHB WALL BARS FOR EVERY 3
4
LAYERS OF CHB
FTB
FTB
FTB
FTB
FTB
FTB
4000.0
WF
FTB
FTB
FTB
FTB
FTB
FTB
5000.0
3-12mm dia. BOTTOM BARS 2-12mm dia. TOP BARS
F1/CI F1/CI F1/CI F1/CI F1/CI F1/CI 600.0
FTB FTB FTB FTB FTB 12mm dia. CUT BARS SECOND FLOOR
2
100mm thk. CONCRETE TB 400.0
FTB
FTB
FTB
FTB
FTB
FTB
4000.0
1
FTB FTB FTB FTB FTB S 2 SCALE NTS
S 2 SCALE NTS
1 FOUNDATION PLAN
S 2 SCALE 1:100
10mm dia. VERTICAL TIES
SPACED AT 2-50mm, 3-100mm, 4000.0
8-16mm dia. 3-150mm, REST @ 200mm O.C.
LATERAL BARS 10mm dia. REINFORCED BAR @ 500mm
O.C. BOTH WAYS
NATURAL G. L. WITH 10mm dia. 250
Bottom X Reinforcement 1600.0 VERTICAL TIES
FTB FTB 600.0
Bottom Y Reinforcement 100mm thk.
400
COMPACT GRAVEL COMPACTED BASE
Top Y Reinforcement
6 FLOOR SLAB DETAIL
1600.0
Top X Reinforcement
5 FOOTING TIE BEAM DETAILS S 2 SCALE NTS
GROUND FLOOR
NTS
3000.0 S 2 SCALE 300.0
NATURAL G. L.
10mm dia LATERAL TIES
SPACED @ 2-50mm, 3-100mm, 600.0
FTB FTB
3-150mm, REST @ 200mm
F1/CI
6-12mm dia. VERTICAL BARS
WITH 10mm dia. LATERAL TIES
6'' CHB WALL 4'' CHB WALL 10mm dia LATERAL TIES
3-12mm BOTTOM BARS SPACED @ 2-50mm, 3-100mm,
300.0 3-12mm BOTTOM BARS 3-150mm, REST @ 200mm
DESIGNATION DIMENSION REBAR TIES SIZE STIRRUPS SAPCING S2 S2 100mm thk. CONCRETE
2-50mm, 3-100mm,
C1 600mm X 600mm 16-25mm DIA 16mm DIA 3-150mm,REST 200mm 9 WALL FOOTING PLAN
10 FOUNDATION SECTION
S 2 SCALE NTS
S2 SCALE NTS
SCHEDULE OF FOOTING
MAIN REINFORCEMENT
DESIGNATION DIMENSION THICKNESS BAR DIAMETER
BOT X BOT Y TOP X TOP Y CONCRETE COVER
F1 1600mm X 1600mm 300mm 25mm 8 8 6 6 75mm
ENGR. RUDERICO M. ENDRIANO PLACE ISSUED: PERMISSION FROM THE DESIGNER. THIS DRAWING SHALL
NOT BE SCALED FOR CONSTRUCTION PURPOSES. ALL
DIMENSIONS ARE TO BE CHECKED ON SITE PRIOR TO
PROPOSED 2-STOREY
COMMERCIAL BUILDING
POGOY, ROM RENIER GUANZON, PAUL
COLUMN FOOTING DETAIL
SCHEDULE OF COLUMNS
SCHEDULE OF FOOTING
FOOTING TIE BEAM DETAILS
WALL FOOTING SECTION
WALL FOOTING PLAN
S
PRC ID: BATUCAN, RELJAN P. PERNES, NEILJON T.
M A N U F A C T U R E A N D C O N S T R U C T I O N .N O T I F Y
2
CIVIL/STRUCTURAL ENGINEER FLOOR SLAB DETAILS
ENGINEER/ARCHITECT OF ANY DISCREPANCIES DISCOVERED FOUNDATION SECTION
TIN: BEFORE CONSTRUCTION. LOCATION: BRGY. NAUNGAN, ORMOC CITY, LEYTE ADDRESS: ORMOC CITY, LEYTE