0% found this document useful (0 votes)
5 views4 pages

Certificate 1

Uploaded by

singhvimehul10
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views4 pages

Certificate 1

Uploaded by

singhvimehul10
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

HARYANA STATE POLLUTION CONTROL BOARD

Star Complex, Opp. General Hospital, Delhi Road,


Sonepat Ph. 0130-2236119(O) Email:-
hspcbrosr@gmail.com
Website: www.hrocmms.nic.in E-Mail - hspcbho@gmail.com

______________________ Telephone No.: 0172-2577870-73

No. HSPCB/Consent/ : 313124222SONCTE29056462 Dated:07/11/2022

To.
M/s : GLASGOW INTERNATIONAL
PLOT NO 78 PHASE IV INDUSTRIAL ESTATE SECTOR 56 KUNDLI SONIPAT
HARYANA 131028
SONIPAT
131028

Sub. : Grant of consent to Establish to M/s GLASGOW INTERNATIONAL


Please refer to your application no. 29056462 received on dated 2022-10-03 in
regional office Sonipat.
With reference to your above application for consent to establish,M/s GLASGOW
INTERNATIONAL is here by granted consent as per following specification/Terms and
conditions.

Consent Under AIR/WATER


Period of consent 07/11/2022 - 06/11/2027
Industry Type Manufacturing of glass
Category ORANGE
Investment(In Lakh) 294.0
Total Land Area (Sq. 1012.5
meter)
Total Builtup Area (Sq. 2789.0
meter)
Quantity of effluent
1.Trade 1.0 KL/Day
2.Domestic 0.5 KL/Day
Number of outlets 2.0
Mode of discharge
1.Domestic Cetp
2.Trade ETP
Permissible Domestic Effluent Parameters
1. NA 0 mg/l
Permissible Trade Effluent Parameters
1. BOD 30 mg/l
2. COD 250 mg/l
3. TSS 100 mg/l
4. Ph 5.5 9range
5. O & G 10 Mg/l
Number of stacks 2
Height of stack
1 . E L E C T R I C A L 14 M
OVEN
2. DG set of capacity 14 M
250 KVA
Permissible Emission parameters
1. SPM 80 mg/m3
Capacity of boiler
1. Na 0 Ton/hr
Type of Furnace
1. Na 0 Na
Type of Fuel
1. Diesel 0.075 KL/day

Regional Officer, Sonipat


Haryana State Pollution Control Board.
Terms and conditions

1. The industry has declared that the quantity of effluent shall be 1.5 KL/Day i.e
1KL/Day for Trade Effluent, 0 KL/Day for Cooling, 0.5 KL/Day for Domestic and
the same should not exceed .
2. The above 'Consent to Establish' is valid for 60 months from the date of its issue to be
extended for another one year at the discretion of the Board or till the time the unit
starts its trial production whichever is earlier. The unit will have to set up the plant
and obtain consent during this period.
3. The officer/official of the Board shall have the right to access and inspection of the
industry in connection with the various processes and the treatment facilities being
provided simultaneously with the construction of building/machinery. The effluent
should conform the effluent standards as applicable
4. That necessary arrangement shall be made by the industry for the control of Air
Pollution before commissioning the plant. The emitted pollutants will meet the
emission and other standards as laid/will be prescribed by the Board from time to time.
5. The applicant will obtain consent under section 25/26 of the Water (Prevention &
Control of Pollution) Act, 1974 and under section 21/22 of the Air (Prevention &
Control of Pollution) Act,1981 as amended to-date-even before starting trial
production
6. The above Consent to Establish is further subject to the conditions that the unit
complies with all the laws/rules/decisions and competent directions of the
Board/Government and its functionaries in all respects before commissioning of the
operation and during its actual working strictly.
7. No in-process or post-process objectionable emission or the effluent will be allowed, if
the scheme furnished by the unit turns out to be defective in any actual experience
8. The Electricity Department will give only temporary connection and permanent
connection to the unit will be given after verifying the consent granted by the Board,
both under Water Act and Air Act.
9. Unit will raise the stack height of DG Set/Boiler as per Board's norms.
10. Unit will maintain proper logbook of Water meter/sub meter before/after
commissioning.
11. That in the case of an industry or any other process the activity is located in an area
approved and that in case the activity is sited in an residential or institutional or
commercial or agricultural area, the necessary permission for siting such industry and
process in an residential or institutional or commercial or agricultural area or
controlled area under Town and Country Planning laws CLU or Municipal laws has to
be obtained from the competent Authority in law permitting this deviation and be
submitted in original with the request for consent to operate.
12. That there is no discharge directly or indirectly from the unit or the process into any
interstate river or Yamuna River or River Ghaggar.
13. That the industry or the unit concerned is not sited within any prohibited distances
according to the Environmental Laws and Rules, Notification, Orders and Policies of
Central Pollution control Board and Haryana State Pollution Control Board.
14. That of the unit is discharging its sewage or trade effluent into the public sewer meant
to receive trade effluent from industries etc. then the permission of the Competent
Authority owing and operating such public sewer giving permission letter to his unit
shall be submitted at time of consent to operate.
15. That if at any time, there is adverse report from any adjoining neighbor or any other
aggrieved party or Municipal Committee or Zila Parishad or any other public body
against the unit's pollution; the Consent to Establish so granted shall be revoked.
16. That all the financial dues required under the rules and policies of the
Board have been deposited in full by the unit for this Consent to
Establish.
17. In case of change of name from previous Consent to Establish granted, fresh Consent
to Establish fee shall be levied.
18. Industry should adopt water conservation measures to ensure minimum consumption
of water in their Process. Ground water based proposals of new industries should get
clearance from Central Ground Water Authority for scientific development of previous
resource.
19. That the unit will take all other clearances from concerned agencies, whenever
required.
20. That the unit will not change its process without the prior permission of the Board.
21. That the Consent to Establish so granted will be invalid, if the unit falls in Aravali
Area or non conforming area.
22. That the unit will comply with the Hazardous Waste Management Rules and will also
make the non-leachate pit for storage of Hazardous waste and will undertake not to
dispose off the same except for pit in their own premises or with the authorized
disposal authority.
23. That the unit will submit an undertaking that it will comply with all the specific and
general conditions as imposed in the above Consent to Establish within 30 days failing
which Consent to Establish will be revoked.
24. That unit will obtain EIA from MoEF, if required at any stage.
25. In case of unit does not comply with the above conditions within the stipulated period,
Consent to Establish will be revoked.
26. That unit will obtain consent to operate from the board before the start of product
activity.
Specific Conditions
Other Conditions :
1. CTE so granted is on the basis of detail submitted by the unit in online application, CTE
granted will be without prejudice to any violation made by unit in past & will be deemed
revoked & further action will be taken as per law if any violation is observed at any stage. 2.
Unit will not change the quantity of domestic effluent/trade effluent/air emission without prior
permission of the Board. 3. Unit will obtain prior CTO before starting of production. 4. Unit
will obtain all necessary clearance from all concerned departments. 5. The unit will install
STP/ETP/ACPM along with the main project. 6. The unit will install the project only on the
land for which Town and Country Planning Department/HUDA/HSIIDC has given license. 7.
Unit will apply for CTO/ CTE Extension at least 90 days before expiry date of this CTE. 9.
That in case any additional charges / fees / penalty etc. are found payable towards this
authorization / CTO/ CTE as per audit then the same shall be paid by the unit without any
objection immediately as and when demanded by this office. 10. If at any stage found that unit
was involved in any past violation, If at any stage found that unit was involved in any past
violation regarding Environment Laws / Rules / Acts then CTE so granted shall be revoked
automatically & legal action will be initiate against the project proponent. 11. Unit will use only
treated effluent supplied from Sewage treatment plant during construction phase of the project
12. That this CTE will not provide any immunity from any other Act/Rules/Regulations
applicable to the project/land in question. 13. Unit will not discharge any type Treated or
untreated effluent outside the premises of the project. 14. Stack emission level should be
stringent than the existing standards in terms of the identified critical pollutants. 16. Increase
of green belt cover by 40& of the total land area beyond the permissible requirement of 33%,
wherever feasible. 17. Stipulation of greenbelt outside the project premises such as avenue
plantation, plantation in vacant areas, social forestry etc. 18. Unit will not discharge any type of
effluent outside of the premises of the project and reuse/recycle of treated waste water. 19. A
detailed water harvesting plan may be submitted by the project proponent.20 Unit will comply
CPCB Directions issued vide letter dt. 27.11.2020 & HSPCB, HQ Orders dated 28.12.2020 and
CAQMS directions dated 02.06.2022 and 23.06.2022 on permissible fuels regarding to allow
only those new industrial units in NCR-Delhi, which are using cleaner fuels, namely, natural
gas (PNG/CNG), liquefied petroleum gas, bio-gas, propane, butane etc.
NAVEEN Digitally signed by
NAVEEN GULIA

GULIA Date: 2022.11.07 11:36:47


+05'30'
Regional Officer, Sonipat
Haryana State Pollution Control Board.