PENNAR

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views65 pages

PENNAR

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 65

PENNAR ENGINEERED BUILDING SYSTEMS LTD.

An ISO 9001-2008 COMPANY


COMPOSITE STEEL STRUCTURES
High Rise Steel Structural Systems
Construction Methods
Traditionally two competing methods of construction could be
observed both connected with special advantages but also
disadvantages worth mentioning.
Conventional concrete Composite Construction
Construction in steel
construction method
Option -1 Option -2
+ Higher bearing
+ Freedom of form and Shapes + High ratio between bearing
capacity
capacity and weight
+ Easy to handle + Optimized usage of
+ Prefabrication
steel and concrete
+ Thermal resistance + High accuracy
+ Higher stiffness
- Time-consuming shuttering - Low fire resistance
+ Better fire and
- Sensitive to tensile forces corrosion resistance

* Composite construction provides the most economical solution


Structural Components

 Composite Columns

 Composite Slab & Secondary


beams

 Mechanical, Electrical &


Plumbing Integration
Composite Beam Components

 Steel Beam

 Shear Studs

 Metal Deck

 Slab
Composite Columns

• Yield Strength upto 450Mpa

• Saving in column sizes

• Protection from fire

• Use of Standard size form work

• Minimum steel consumption


Composite Columns Sizes (at base) Comparison for 11mX11m grid.
(Commercial floor loads considered)

RCC Composite

3m2

*Column Are in Sqm.


2.25m2

1.5m2

0.75m2

0m2
10 Storey 20 Storey 30 Storey
Composite Slab
Components – A) Metal Deck , B) Shear Studs, C) Reinforcement, D) Slab
Composite slab Advantages

 No Formwork required

 Very less dead weight and hence


saves on foundation cost

 Multiple slabs can be casted at


once

 Composite action controls


excessive deflection

 Overall Floor Beam tonnage is


reduced
MEP Services Integration

 Slim Deck systems reduce the beam height to an extent that most MEP
Provisions can be given underneath the beam

 If spans are too long then castellated beams can be used. An opening of 200mm
to 600mm can be maintained in a 900mm deep beam

 If Deeper opening required, open joist systems are recommended


Mother’s pet - Center Point School @ Nagpur
A B C D E F G

3 3 3 3 3 3 3

ROOF L-27.0

G+3 L-21.0

G+2 L-18.0

G+1 L-14.4

GND L-10.8

G-1 L-7.2

G-2 L-3.6

Base
Y

Composite columns at site


COLD FORMED STEEL BUILDINGS (LGSF)
Light Gauge Steel Framed Structures
LIGHT GAUGE STEEL FRAME COMPOSITE HOUSING
STRUCTURE PROCESS

 Recycling 1000 kg of steel saves 1,200 kg of iron ore, 500 kg of coal, 20 kg of


limestone, and the landscape degradation of the quarries to extract them.
LGSF PROCESSING

RAW STEEL AT PLANT COIL ROLLS

GALVANISED/GALVALUME/
COIL SLITTING
BLUESCOPE STEEL COILS
Cold rolled studs and joists are formed in “C” shapes, which
provides lateral strength for studs and vertical strength for
joists and rafters.
Framing Fabrication Transport & Erection Mesh-crete Wall Cladding
Roof with Concrete Slab Roof with Profile Sheeting
Residential House

Farm House
TRANSPORTABLE MODULAR CONTAINERS
TEMPORARY HEALTH CAMPS
MODULAR BUILDINGS
MODULAR TOILETS
EWS Houses at Thiruvallur
1000 HOUSES EACH 380 Sft FOR SRI RAMANUJA MISSION TRUST
Why LGSF Construction?
 Monolithic construction system (air-tight) – therefore no thermal bridges.

 Higher Flexibility due to material unification (same material for inside and outside
walls, ceilings, floor).

 Non-Combustible Construction System.

 Very high Green Building rating for fire, thermal and acoustic properties.

 High Earthquake Protection (structurally rigid when bound to internal steel frame).

 Light and easy to handle – no special equipment (heavy cranes, machinery) needed
on-site.

 Economical than alternative “eco” building systems, minimizes handing and


installation

 Lesser time, manpower and related costs.

 Minimizes wastage and less life cycle cost.


PRE ENGINEERED BUILDINGS
ADVANTAGES OF PEB

 Ability to span long distance

 Faster occupancy

 Cost efficiency

 Flexibility of expansion

 Earthquake & Hurricane resistant

 Single-source responsibility

 Factory controlled Quality

 Low maintenance
MANUFACTURING FACILITY

State-of-the-art manufacturing facility with a


production capacity of 90,000 MT per annum
ENGINERING TEAM

More than 150 Experienced Engineers


in Design & Detailing Team

Design Department : Engineering Co-Ordinator :

• Design Head :1 • Executive :1


• Design Checkers : 12
• Sr. Designers : 16
• Design Engineers : 35

Detailing Department : 3D- Max studio :

• Detailing Chief :1 • Executive :1


• Sr. Detailing Checker : 15
• Detailing Checkers : 18
• Sr. Detailers : 30
• Detailers : 39
ENGINEERING CODES & SOFTWARE

 Metal building Software – MBS, USA


SOFTWARE  Staad Pro V8i - US Code and IS Code – Bentley corporation, USA
 Auto CAD – Autodesk Inc. USA
 Estimation Software – In-house developed
 3D Max Studio - Autodesk Inc., USA
 X-Steel (Tekla structure) – Trimble , Finland

CODES  American
 Euro
 British
 Indian
APPLICATIONS

FACTORY STADIUM
SHOWROOM STADIUM

WAREHOUSE AIRCRAFT HANGAR MULTI-STOREY


APPLICATIONS

COLD FORM STRUCTURE COLD STORAGE

RACKING SYSTEM

OFFICE BUILDING SOLAR STRUCTURES


THE GROWTH STORY OF PEBS PENNAR

Annual Turnover from FY10 to FY17 650*


570
509
486
417
326
278

165

34
REVENUE (INR Cr.)

YEAR FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 FY 18

Procured orders worth over Rs. 3,500 Cr.


from the date of inception
* Projected Revenue
AWARDS
TV5 Business Leader Award 2015
Construction Week India Awards 2013
Infrastructure Category(Medium)
Infrastructure Company of the Year

IEI Industry Excellence Awards 2015


Construction Week India Awards 2013 Excellence Award
PEB Contractor of the Year
CIDC Vishwakarma Award 2016
Best Professionally Managed Company
IEI Industry Excellence Awards 2013
Excellence Award ACCE(I) Bhagawati Award
Outstanding Design of Industrial Plant

INSDAG National Award 2014 Construction World-Top Challenger Award


Certificate of Commendation Top Challenger

Construction Week India Awards 2016


VC Circle Award 2015
PEB Project of the Year-Runner Up
Manufacturing Company of the Year
IEI Industry Excellence Awards 2016
Excellence Award
CIDC Vishwakarma Award 2015
Best professionally managed company CIDC Vishwakarma Award 2017
Best PEB Building of the Year Best Professionally Managed Company

Dun & Bradstreet Infra Award 2016 IEI Industry Excellence Award 2017
Industrial Building Excellence Award
OUR CREDENTIALS
RDSO Approval for Railway
Bridges & Girders
OUR CREDENTIALS
HEAVY STRUCTURES
RELIANCE PROJECT

4G Towers for Reliance Jio Infocomm


SOLAR STRUCTURES
SOLAR STRUCTURES

Solar Photovoltaic plants

APPLICATIONS Solar Canal-top

Solar Roof-top

Solar Thermal plants

Solar Car Parks


PROJECT PHOTOGRAPHS
IOT Infra – Dahej, Gujarat

IOT Infrastructure & Energy Services Ltd. building for ONGC OPAL, the
length of the building is approx. 1 km, Gujarat

Area: 15.16 lakh sft


Stacker Reclaimer Building for UltraTech Cement Ltd.,
at Kotputhli
Reliance Retail – National Distribution Center, Pune

Area: 4 lakh sft


Tata Steel Processing & Distribution Ltd., Chennai
Volvo India - Bengaluru
ETNA Phoenix - Hyderabad
UltraTech Cements – Rajshree, Karnataka
Bharat Biotech, Multi-storey G+7, R&D center,
Hyderabad

85,000sft
Jayabheri Orange County, Multi-storied building
G + 10, Hyderabad
My Home Industries, 700m long building,
Visakhapatnam

Length: 710m
L & T Metro Stations – Hyderabad
SOLAR PROJECTS
CIRUS SOLAR - ANDHRA PRADESH
AZURE POWER - RAJASTHAN

30 MW
NEW ERA - PEDDALINGAPUR

12 MW
NEW ERA - KOWDIPALLY

10 MW
PREMIER SOLAR - TALAMADLA

8.5 MW
5 MW

PREMIER SOLAR – HYDERABAD


OUR ELITE CUSTOMERS/END USERS
PEBS PENNAR PLANT

INDIA’S 1ST IGBC GOLD RATED GREEN FACTORY

ENTRANCE CANOPY FABRICATION BAY

HEADER BAY CANTEEN


THANK YOU