0% found this document useful (0 votes)
7 views1 page

Commissioning Record

Uploaded by

soorajsasi01
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views1 page

Commissioning Record

Uploaded by

soorajsasi01
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Oil Commissioning Report

Project : Laying of Balance Crude oil Pipeline of 6" from MDM CPF to NRM GGS Report No : 01
Client : Oil & Natural Gas Corporation, Cauvery Asset Karaikal Date : 04-02-2025
Contractor : Jai Tech Engineering, Thiruvarur
Location : MDM Launcher & Pumphouse

Temperature Temperature Temperature Temperature


Outlet Pressure Outlet
Time Flow Volume (m3) Total Cum. Speed(rpm) Current (I) Pump-B Pump-B Pump-C Pump-C
Inlet Pr. (Kg/cm2) Common Voltage Temp
S.No Rate Volume Volume (NDE) (°C) (DE) (°C) (NDE) (°C) (DE) (°C) Remarks
(kg/cm2) Pressure (v) (°C)
(m3/hr) (m3) (m3)
Start End Start End Pump B Pump C (kg/cm2) PUMP-B PUMP-C PUMP-B PUMP-C Bearing Oil Bearing Oil Bearing Oil Bearing Oil

(FT-2) Power Change over from DG to EB Connection


1 12:15 12:25 30.20 197.4 9.98 9.98 0.4 - 12 8.25 - 2548 - 43.3 408 - - - - 33 36 34 36 31.61
187.41 Pump C Started
(FT-1)
2 12:35 12:40 29.61 2.93 2.93 12.91 0.4 - 12 8.25 2559 2548 44.5 43.3 408 34.6 36 35 32 33.2 36 34 36 31.62
0
3 12:40 13:00 60.26 2.93 27.32 24.39 37.3 0.3 12 12 10.25 2559 2548 44.5 43.3 408 36.7 38 32.7 34 34.6 36 34 32 32.12 Pump B Started @ 12:40, 2 Pump in Running
4 13:00 13:30 60.37 27.32 59.7 32.38 69.68 0.3 12 12 10.25 2559 2548 44.5 43.3 408 38.7 40 34.3 34 35.3 38 35.4 38 31.42
5 13:30 14:00 61.26 59.7 88 28.3 97.98 0.3 12 12 10.25 2559 2548 44.5 43.3 408 37.5 40 31.6 36 35.2 38 35 38 31.26
6 14:00 14:30 60.91 88 121 33 131 0.3 12 12 12 2559 2548 44.5 45.8 416 37.8 40 31.9 36 35.6 38 35.3 36 31.12
7 14:30 15:30 61.68 121 183.6 62.6 193.6 0.3 12 12 12 - 2548 - 45.8 416 - - - - 34.8 38 33.2 36 30.72
8 15:30 16:30 30.95 183.6 238.4 54.8 248.4 0.25 12 12 11.02 - 2548 - 45.8 416 - - - - 34.6 38 33.8 36 30.73 16:00 Hr ,Pump B Stopped
9 16:30 17:30 35.83 238.4 277.9 39.51 287.9 0.3 - 12 10.6 - 2548 - 45.8 416 - - - - 33.7 36 34.2 36 30.47
10 17:30 18:30 35.51 277.9 308.7 30.83 318.7 0.3 - 12 10.8 - 2548 - 45.8 416 - - - - 33.2 36 33.6 36 30.49
11 18:30 19:00 35.18 308.7 329.6 20.86 339.6 0.3 - 12 10.9 - 2548 - 45.8 416 - - - - 32.9 34 30.4 36 30.34
12 19:00 20:00 34.60 329.6 363 33.43 373 0.3 - 12 11.49 - 2548 - 45.8 416 - - - - 33.5 34 31.8 34 29.66
13 20:00 21:00 34.25 363 398.9 35.88 408.9 0.3 - 12 11.69 - 2548 - 45.8 416 - - - - 32.4 34 31.7 34 29.08
14 21:00 21:30 34.20 398.9 416.4 17.45 426.3 0.29 - 12 11.73 - 2550 - 45.8 416 - - - - 32.3 34 32.3 34 29.77
15 21:30 22:00 34.23 416.4 432.5 16.11 442.5 0.25 - 12 11.79 - 2550 - 45.8 416 - - - - 32.3 34 32.3 34 30.71 Pump C Stopped
16 22:00 22:05 - 432.5 433.2 0.74 443.2 0.3 - - - - - - - - - - - - - - - - -

FOR JTE FOR TPI FOR ONGC ENGINEERING SERVICES FOR SURFACE TEAM