0% found this document useful (0 votes)
11 views2 pages

qw1 An

Uploaded by

Park Park
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views2 pages

qw1 An

Uploaded by

Park Park
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
You are on page 1/ 2

In resident Engineer (RE) report currently site activity are excavation to the

formation level and installation of steel waling & steel strut for the installed
steel pipe pile wall, breaking out concrete bored pile head for concrete pile cap
construction & substructure to ground floor reinforced concrete wall & column
construction , on section quality control/workmanship issues on site, what sort of
matter should be included in the report. AI, please provide professional RE
report in this "quality control/workmanship issues on site" section for including
in the RE report. (at least 10 matters).

profile
Qwen3-Coder
QUALITY CONTROL/WORKMANSHIP ISSUES ON SITE
1. Steel Waling and Strut Installation
Misalignment of steel waling: Observed waling members not properly aligned with the
designed elevation, creating uneven load distribution points
Insufficient welding quality: Inadequate weld penetration and poor weld finishing
observed at strut-to-waling connections
Lack of proper load transfer: Missing or loose connection plates between struts and
walings, compromising lateral support system integrity
2. Steel Pipe Pile Wall Installation
Irregular pile spacing: Deviation from specified pile center-to-center distances
exceeding tolerance limits
Insufficient embedment depth: Several pipe piles installed short of the required
cut-off level, affecting structural capacity
Poor pile alignment: Visible vertical deviation and batter angles exceeding
specified tolerances
3. Concrete Bored Pile Head Breaking Out
Over-breakage of concrete: Excessive concrete removal below the designed pile cut-
off level, compromising pile integrity
Damage to reinforcement: Main bars damaged or bent during breakout operations,
requiring remedial measures
Inconsistent cut levels: Irregular pile head elevations creating difficulties for
pile cap construction
4. Reinforced Concrete Work - General
Inadequate concrete cover: Reinforcement placed too close to formwork surfaces, not
meeting specified cover requirements
Poor concrete finish: Honeycombing, cold joints, and surface voids observed in
recently poured concrete elements
Improper curing practices: Insufficient moisture retention and inadequate curing
duration for concrete surfaces
5. Formwork and Shuttering Issues
Formwork misalignment: Verticality and alignment deviations in column and wall
formwork exceeding permissible limits
Insufficient bracing: Lack of adequate support systems for tall formwork panels,
creating safety hazards
Gap sealing deficiencies: Poor sealing between formwork panels resulting in
concrete leakage and honeycombing
6. Reinforcement Installation
Incorrect bar spacing: Reinforcement spacing not conforming to drawings,
particularly in congested areas
Lap length deficiencies: Insufficient lap lengths provided for continuous
reinforcement in critical structural elements
Bar positioning errors: Top and bottom reinforcement incorrectly placed, affecting
structural behavior
7. Excavation Works
Over-excavation below formation level: Excavation extending beyond specified levels
requiring additional filling materials
Slope stability concerns: Temporary excavation slopes not maintained at safe
angles, posing safety risks
Inadequate dewatering: Water accumulation in excavation areas affecting work
quality and safety conditions
8. Material Quality Control
Concrete slump variations: Inconsistent workability of concrete batches affecting
placement and compaction quality
Aggregate segregation: Poor handling of concrete materials resulting in segregation
and quality issues
Storage of reinforcement: Exposure of steel bars to moisture causing corrosion and
surface contamination
9. Construction Joint Treatment
Inadequate surface preparation: Poor cleaning and preparation of construction
joints prior to subsequent concrete placement
Missing keyways: Absence of proper shear key provisions at construction joints as
per design requirements
Timing issues: Excessive delays between consecutive concrete placements affecting
bond strength
10. Site Safety and Housekeeping
Inadequate fall protection: Missing safety railings and protective measures around
excavation areas and elevated work platforms
Poor housekeeping practices: Accumulation of construction debris and materials
creating safety hazards and work impediments
Equipment maintenance issues: Construction equipment operating without proper
safety checks and maintenance records
11. Documentation and Testing Deficiencies
Incomplete test cube casting: Insufficient concrete test specimens cast for
specified cube testing requirements
Missing inspection records: Lack of proper documentation for critical construction
stages and quality checks
Delayed NCR resolution: Slow response to non-conformance reports and corrective
action implementation
12. Coordination and Workmanship Issues
Poor interface management: Inadequate coordination between different trade
contractors affecting work quality
Rushing of works: Premature removal of formwork and inadequate time for concrete
strength development
Lack of skilled supervision: Insufficient experienced supervision during critical
construction activities
RECOMMENDATIONS: Immediate corrective actions required for all identified issues.
Enhanced quality control measures and regular inspections to be implemented. All
non-conformances to be documented and tracked until satisfactory resolution
achieved.