P.U Braced Tower

The document outlines the costs and labor associated with the assembly and dismantling of a braced tower using manual methods and winches. It details the required materials, tools, and labor for both the construction and removal processes, including concrete blocks for anchor placement. The total costs for various components are provided, emphasizing the comprehensive nature of the project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views4 pages

P.U Braced Tower

The document outlines the costs and labor associated with the assembly and dismantling of a braced tower using manual methods and winches. It details the required materials, tools, and labor for both the construction and removal processes, including concrete blocks for anchor placement. The total costs for various components are provided, emphasizing the comprehensive nature of the project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Concept

Assembly of braced tower by manual means and winch, includes: Accessory


RF and MW hardware, cable tray, security system, nut leveling

Description Unit Quantity


Labor
Crew of riggers. Includes: rigger,
assistant and tool. Jor 0.72
Tool
Framework (%)mo 0.0005
Team
1000 kg winch with accessories and Kohler motor of
12 hp gasoline engine with pulley triangle lift
hook and sinker. h 0.3
Direct cost

Concrete cube of 50x50 cm and 1.00 m in height for


anchor placement, includes: 4 rod anchors with
1/2" diameter rope and #2 (1/4") stirrups @15
cm, concrete manufacturing f'c= 250 kg/cm2 made in
work with mixer, materials, excavation, enabled
and steel reinforcement assembly, cuts, overlaps,
dobleces, ganchos, cimbrado, colado, vibrado,
unstripped, membrane cured, filled and
compaction
waste, cleaning, site demarcation of the
jobs and everything necessary for the proper execution
of the jobs. PZA 3
Unit

the towers,
as y Grout. M

Cost Amount

$767.21 $552.39

$552.39 $0.28

$64.03 $19.21
$571.88

$1,432.14 $4,296.42
Concept Unit
Dismantling of braced tower, using manual means, and manual loading on
truck or container. The price includes the removal of the surface wiring and the PZA
dismantling of accessories and mounting brackets.

Concrete block of 50x50 cm and 1.00 m height for anchor placement,


includes: 4 rebar anchors with 1/2" diameter rope and #2 stirrups
(1/4") @15 cm, concrete manufacturing f'c= 250 kg/cm2 made on site with PZA
mixer, materials, excavation, enabled and assembly of reinforcement steel,
cortes, traslapes, dobleces, ganchos, cimbrado, colado, vibrado, descimbrado,
membrane cured, filling and compaction, labor, tools
equipment, waste, cleaning, demarcation of the work site and everything
necessary for the correct execution of the work.
Assembly of braced tower by manual means and winch, includes:
Tower accessories, RF and MW hardware, cable tray, System of M
safety, leveling of nuts and grout.
Quantity Total

1 $2,808.00 $2,808.00

3 $1,432.14 $4,296.42

9 $571.88 $5,146.92