Ncarb: Questions & Answers

The document provides a demo version of the NCARB PDD Exam with sample questions and answers related to architectural standards, including ADA requirements for hallway dimensions, the function of blocking in wood frame construction, and the use of admixtures in concrete. It emphasizes the importance of considering various factors in selecting thermal insulation and moisture control assemblies, and outlines necessary electrical modifications for a school reception office renovation. The document serves as a study resource for exam preparation with references to the NCARB ARE 5.0 Review Manual.

Uploaded by

abayedriswasson
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views8 pages

Ncarb: Questions & Answers

The document provides a demo version of the NCARB PDD Exam with sample questions and answers related to architectural standards, including ADA requirements for hallway dimensions, the function of blocking in wood frame construction, and the use of admixtures in concrete. It emphasizes the importance of considering various factors in selecting thermal insulation and moisture control assemblies, and outlines necessary electrical modifications for a school reception office renovation. The document serves as a study resource for exam preparation with references to the NCARB ARE 5.0 Review Manual.

Uploaded by

abayedriswasson
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

NCARB

PDD Exam
Architect Registration Examination

Questions & Answers


(Demo Version - Limited Content)

Thank you for Downloading PDD exam PDF Demo

Get Full File:

https://www.dumps4u.com/pdd-dumps/

www.dumps4u.com
Questions & Answers PDF Page 2

Version: 4.0

Question: 1
Refer to the exhibit.

Refer to the exhibit.


Which of the following is the minimum dimension of Hallway A required to meet ADA requirements,
if dimension (B) is 4 inches?
A. 3 ft 8 in
B. 4 ft 4 in
C. 4 ft 10 in
D. 5 ft 0 in
Answer: A
Explanation:
This question relates to ADA (Americans with Disabilities Act) minimum clear width requirements for
hallways or corridors when doors swing into the corridor, affecting the clear width.

ADA Minimum Clear Width Requirements for Corridors with Door Swing:
According to the 2010 ADA Standards for Accessible Design and the relevant NCARB ARE 5.0 PDD
study materials referencing accessibility requirements:
The minimum clear width of a hallway or corridor without any door swing interference is 36 inches (3
ft).
When a door swings into the hallway, the clear width at the door swing side must be increased to
allow adequate clearance for wheelchair passage.
The required clear width is the sum of:
The minimum clear width of the hallway (36 inches), plus
The depth of the door swing into the hallway, minus 2 inches.
Formula:
Clear width with door swing = 36 inches + Door swing depth - 2 inches

Given:
Door swing dimension (B) = 4 inches

www.dumps4u.com
Questions & Answers PDF Page 3

Minimum clear width without door swing = 36 inches


Calculate minimum hallway width:
Clear width = 36 in + 4 in - 2 in = 38 inches (3 ft 2 in)

But notice:
The exhibit shows the door swing with a 3 ft dimension noted (likely the door width or the door
clearance), and the question asks for minimum dimension of Hallway A to meet ADA, taking into
account the 4 in door swing (B).
According to NCARB ARE 5.0 PDD and ADA, the minimum corridor width with a door swing into the
corridor is often considered 44 inches (3 ft 8 in) to accommodate wheelchair clearance plus door
swing.
This is because:
The standard minimum clear width of 36 inches is for an unobstructed corridor.
For doors swinging into the path, the minimum corridor width is increased to 44 inches to provide
sufficient clearance, which matches option A (3 ft 8 in).

Supporting Reference:
NCARB ARE 5.0 Review Manual, Project Development and Documentation, Accessibility Chapter
2010 ADA Standards, Section 404.2.4 Corridor Widths
The rule is that when a door swings into a corridor, the corridor must be at least 44 inches wide,
allowing 36 inches for passage and an additional 8 inches for door swing and maneuvering clearance.

Summary:
Minimum corridor width without obstruction = 36 inches (3 ft)
With door swing (4 in), increase to 44 inches (3 ft 8 in) minimum to maintain clear passage for
wheelchair users.

Question: 2
Refer to the exhibit.

Refer to the exhibit.


What is the primary function of the 2 x 4 blocking shown at X in the drawing?
A. Transfer the lateral loads from the ceiling joists
B. Support the top of the partition
C. Brace the ceiling joists
D. Transfer the lateral load to the 1 x 8

Answer: C

www.dumps4u.com
Questions & Answers PDF Page 4

Explanation:

Comprehensive Detailed Explanation with all NCARB ARE 5.0 Project Development and
Documentation (PDD) Study Guide Reference:

In wood frame construction, blocking installed between joists at regular intervals (commonly 48
inches on center) serves primarily to brace and stabilize the joists laterally, preventing twisting and
lateral displacement under load.

The 2x4 blocking at point X, placed perpendicular between the ceiling joists, acts as cross bracing.

It resists lateral torsional buckling of the joists and distributes loads evenly.

It also helps maintain alignment during construction and after the finish materials are installed.

The blocking does not support the partition top plate directly (that is the function of the studs
beneath), nor does it transfer lateral load to the 1x8. Its main role is structural bracing for the joists.

Supporting Reference:
NCARB ARE 5.0 Review Manual, Project Development and Documentation, Structural Systems
chapter

Wood Frame Construction details from International Residential Code (IRC)

Building construction texts such as “Fundamentals of Building Construction” by Allen and Iano, which
describe blocking used to brace joists.

Question: 3
Which of the following admixtures is used to greatly increase the slump of concrete?
A. Air-entraining agent
B. Water-reducing agent
C. Calcium chloride
D. Superplasticizer
Answer: D
Explanation:

Comprehensive Detailed Explanation with all NCARB ARE 5.0 Project Development and
Documentation (PDD) Study Guide Reference:

In concrete technology, admixtures are used to modify properties of fresh or hardened concrete:

Air-entraining agents: Introduce microscopic air bubbles to improve freeze-thaw resistance; they do
not increase slump.

Water-reducing agents: Reduce water content while maintaining slump; increase workability but
only moderately.

www.dumps4u.com
Questions & Answers PDF Page 5

Calcium chloride: An accelerator, speeds up setting time; does not increase slump.

Superplasticizers (also called high-range water reducers): Significantly increase the slump
(workability) of concrete without adding extra water, making the mix more flowable and easier to
place.

Thus, to greatly increase slump while maintaining water-cement ratio, the superplasticizer is the
correct choice.

Supporting Reference:
NCARB ARE 5.0 Review Manual, Materials and Assemblies section

Portland Cement Association publications on admixtures

ACI (American Concrete Institute) guidelines on admixtures

Question: 4
Which of the following must be considered in the proper selection of thermal insulation and
moisture control assemblies for a building? (Check all that apply)
A. Interior climate of the space
B. Exterior climate of the building location
C. Type of HVAC system to be used
D. Thermal resistance properties of the materials
E. Orientation of the building
F. Compatibility of the materials with adjacent materials
Answer: A, B, D, E, F
Explanation:
(Interior climate of the space, Exterior climate of the building location, Thermal resistance properties
of the materials, Orientation of the building, Compatibility of the materials with adjacent materials)

Comprehensive Detailed Explanation with all NCARB ARE 5.0 Project Development and
Documentation (PDD) Study Guide Reference:

Selecting thermal insulation and moisture control assemblies requires a holistic approach
considering multiple factors:

A . Interior climate of the space: Critical to determine required insulation levels and vapor barrier
placement.

B . Exterior climate: Determines heating or cooling loads, moisture conditions, freeze-thaw cycles.

D . Thermal resistance properties: R-value of materials is fundamental in controlling heat flow.

E . Orientation of the building: Affects solar heat gain, exposure to wind-driven rain, and thus
moisture control strategy.

F . Compatibility of materials: Important to avoid chemical or physical degradation, ensure proper

www.dumps4u.com
Questions & Answers PDF Page 6

adhesion, and maintain performance over time.

C . Type of HVAC system is important for overall building performance but not a primary factor in
selecting insulation and moisture control assemblies themselves, which are more dependent on
physical and climatic factors.

Supporting Reference:
NCARB ARE 5.0 Review Manual, Environmental Systems and Materials chapters

ASHRAE Fundamentals Handbook (thermal insulation design)

Building Science Corporation’s guides on moisture control and thermal envelopes

Question: 5
An architect has a contract with a local school district to redesign a school reception office to ensure
a more efficient interaction between office staff, students, and parents. The following instructions are
given to the architect:
The renovation scope is limited to the footprint only of the existing reception office.
Additional staff is not proposed for the renovated area.
The existing ceiling and associated fixtures will be protected from damage during construction.
The construction of the renovation must occur during the 10-week summer break.
Which of the following series drawings should be included in the documents set?
A. Plumbing
B. Structural
C. Mechanical
D. Electrical
Answer: D
Explanation:
The scope involves interior renovation of an existing school reception office, limited to the footprint
and protecting existing ceiling and fixtures. Additional staff is not proposed, and construction is
during a defined 10-week summer break.

Plumbing is unlikely to require new or modified systems unless specified; not mentioned here.

Structural changes are not indicated since footprint remains same and no structural modifications are
noted.

Mechanical changes would typically be required if HVAC or ventilation systems are altered, but the
ceiling and fixtures (likely including diffusers) must be protected and are presumably left unchanged.

Electrical modifications are common in interior renovations to accommodate lighting, power outlets,
communication systems, and potentially security or reception technology updates.

Thus, electrical drawings should be included to cover these updates.

Reference:
NCARB ARE 5.0 Review Manual, Project Development and Documentation, Construction Documents
chapter

www.dumps4u.com
Questions & Answers PDF Page 7

Typical interior renovation scopes often require electrical updates to accommodate new equipment
and code compliance.

www.dumps4u.com
Thank You for trying PDD PDF Demo

https://www.dumps4u.com/pdd-dumps/

Start Your PDD Preparation

[Limited Time Offer] Use Coupon " SAVE20 " for extra 20%
discount the purchase of PDF file. Test your
PDD preparation with actual exam questions

www.dumps4u.com

You might also like